HomeMy WebLinkAboutStaff Report 3.A 06/20/2011a A! Ff 0 : F, F , 0 : & . 4Z Mr� DATE:' June 20, 2011 TO: Honorable Mayor and Members of the City Council through City Manager FROM: Larry Zimmer, Public Works Capital Improvements Division Manager SUBJECT: Resolution Approving a Revised Budget for the Petaluma Boulevard South Road Diet Project C1610110 RECOMMENDATION It is recommended that the City Council adopt the attached resolution approving a revised design budget for the Petaluma Boulevard South Road Diet. BACKGROUND The Metropolitan Transportation Commission (MTC) sponsors the Regional Transportation for Livable Communities (TLC) Funding Program, which is part of the Federal Congestion Mitigation and Air Quality Improvement (CMAQ) program. On April 5, 201.0, the City Council authorized staff to apply for TLC funding for the Petaluma Boulevard South Road Diet Project, with support from the Petaluma Downtown Association. In addition to authorizing staff to apply, City Council approved the MTC resolution committing to matchingthe grant 20% and assuring completion of the project, if funded. On July 14, 2010, staff received notification from MTC of grant award in the amount of $708,000. On October 4, 2010, City Council accepted the grant award and approved the budget for the Petaluma Boulevard South Road Diet. This complete street project is adjacent to and a continuation of the recently completed Petaluma Boulevard North Road Diet Project, which was also partially funded by TLC: The traffic data on Petaluma Boulevard North, within the completed project limits, show the volume of traffic has not changed post construction, and there is a slight decrease in delays, as was expected. Traffic counts taken on the side streets both before and after the project show a decrease of traffic volumes on Keokuk, ,Liberty, Keller and Kentucky. The reduction in traffic volumes, based on this traffic count, were 30 % to 5.0% and somewhat surprising. While it was fully expected that side street volumes would decrease, it was not expected that they would decrease so dramatically. Traffic volume throughout the City.has decreased, and since there was no decrease on Petaluma Boulevard,, it is assumed that users of the side streets have gone back to the Boulevard, thus further decreasing side street volumes beyond the city -wide trend. Staff has scheduled new counts at the same location which will be complete prior to the June 20 meeting. Agenda Review: City Attorney Finance Director City Mana The Petaluma Boulevard South Road Diet will reconfigure the current four undersized through lanes to two through lanes.and two -way left turn lane from Washington Street to D Street, with a transition to E Street. This reconfiguration will provide lane widths to meet City and federal design standards. The work is primarily restriping of the existing roadway, but will, also include traffic signal modifications to accommodate the new lane configuration. As part of this process, a minor, non - structural pavement surface treatment will be required to eliminate the existing striping. The current undersized through and parking lanes increase the likelihood of accidents and reduce safety for all modes of transportation. from January 1, 2006 to July 3.0, 2009, accident data for Petaluma Boulevard from Washington Street to D Street, show there were 90 accidents (53 sideswipes, 11 rear ends, 9 broadsides, 15 unknown/fixed object's, and 2 pedestrians). The sideswipe accidents are typical of such a facility with undersized lanes. In addition, accident data from Petaluma Boulevard North was reviewed'b'efore and`after the road diet. From July 1, 2005 to June 30, 2007, pre -road diet conditions, there were 20 accidents (11 sideswipes, 3 rear ends, 3, broadsides, 1 head -on, l,.pedestrian, and 1 unknown/fixed object). From November 30, 2007 to December 1, 2009, post -road diet conditions, there were 9 accidents (2 sideswipes, 4 rear ends, and 3 broadsides). The reduction in the number of lanes for the inclusion of Class 3 bike delineation, and promotes pedestrian activity by 'improving safety. The lane reduction also provides an opportunity for additional on- street parking. Design and public outreach may result in inclusion of additional bike racks and landscaping into the project area. Public outreach, which began prior to the grant application, will be continued through all phases of the project. In anticipation of the grant, staff canvassed the. downtown ,businesses „regarding this project, and subsequently met with the Petaluma Downtown Association to present the project and address the business community'.s concerns about traffic circulation, loading zones and parking. As part of the canvassing of downtown businesses, a staff member met with representatives of the Petaluma. Downtown Association on February 1.6, 2010 ,to discuss the project. From that meeting and following discussions and meetings, which included some downtown business owners, it was understoodhat their issue were, .parking net gain, loading issues, no impact to traffic volumes, improvement to traffic safety, aesthetics, and ability to install fire sprinklers. Staff provided to the Petaluma Downtown. Association. Board, through its Executive Director, plans and a narrative: explaining4lie;current conditions, number of accidents, particularsofthe project and the anticipated outcome of a safer and more pedestrian friendly downtown environment..The PDA Board had indicated it _recognizes that the: proposed project will increase safety for vehicles, bicyclists and pedestrians alike, that the downtown environment will be more aesthetically pleasing, and the project provides additional street parking between C and E Streets. This discussion'highlighted 'for staff the need to include loading zone areas and add signage to better control established loading zones. Once work begins, staff, along with our consultants, will work closely with the PDA to minimize impacts, and attempt to improve loading in the area. The prevailing concern of the PDA is to assure that the new roadway design will move the same amount of traffic at the same speed, which is expected. The Board members also expressed their desire that anticipated water utility work take place at the same time as the proposed project, in order to minimize disruption to downtown businesses, this will not occur due to conflicting M priorities. To obtain the water pressure needed for fire sprinklers requires replacement of the water main. Such utility work is not eligible for the grant funding, but could have been included in -the project if funded by the City. The Department of Water Resources-and Conservation does not have adequate funding to replace the water main at this time. DISCUSSION On December 9, 2010, the City received Caltrans authorization to proceed with Preliminary Engineering (PE), which includes design, environmental clearance. Since receiving authorization from Caltrans, staff issued a Request for Proposals, selected a consultant, and is now negotiating a Professional Services Agreement (PSA). The negotiations are complicated by the fact that the scope of work depends greatly on the requirements of Caltrans environmental staff. On March 14, 2011, Caltrans informed staff there would be additional environmental studies required that had not been originally anticipated: historical, archaeological and cultural studies. The unanticipated work increases the PE costs. Staff has since worked with Caltrans and the selected consultant to try and.reduce some of the studies required and clarify the extent of work to be completed, to finalize a scope of work and cost for the PSA. The current estimate for the PE phase of work has increased from the budget previously approved by the Council. Based on consultations with Caltrans, staff's current estimate for combined design and environmental clearance is now $.131,65.0, compared to the $120,000 authorized by Caltrans. The current match and any over -run will be paid for out of the Gas Tax (Street Maintenance) Fund 2411, where money has been set. aside for street.project'match funding. In order to maintain the bottom line project budget, costs have been reassigned between several line items, most notably a reduction to the anticipated construction; phase costs. To continue to move this project forward, staff is seeking Council action to approve a revised budget. Doing so prior to design provides reasonable assurance that the project will move forward at the time of ' onstruction award. If the City does not go forward with the project, the $708,000 must be returned to MTC. This in would not only be lost to the City, but would, be lost to.,Sonoma County. MTC would likely reallocate the funds to an active project in the region eligible, for TLC funding. Seeking approval of the budget revisions early also prevents the potential negative impact on the City's ability to receive future funding through MTC Metropolitan Transportation Authority (MTC), by avoiding a potential change in the City's commitment to the project`after agreeing to fund it. FINANCIAL IMPACTS MTC awarded the City of Petaluma $708,000 for the Petaluma Boulevard South Road Diet Project. On October 4,2010, Council passed a resolution on a 4 -3 vote accepting the funding, along.with approval of the total project budget of $906,239. Approximately $90,000 of this amount was budgeted for Preliminary Engineering. As described above, staff learned the requirements for environmental .clearance had been underestimated; therefore, the budget Caltrans authorized for PE was increased to $120,000, of which $96,000, or 80 %, will be reimbursed in accordance with the TLC Grant. Following is the current project cost estimate which will be further refined during the project development process. Staff still believes it is likely the entire project can be completed within the approved $906,239 budget. They also believe that the estimated additional costs may be reduced through negotiations with Caltrans staff and, even if they cannot, opportunities will exist to reduce construction costs that can make up the difference. Caltrans will not currently commit to paying above the already committed $96,000 (80% of $120,000), although it is common practice at the time of construction award to move any unused construction funds to PE. The worst case scenario would require a request from Council to increase the project budget at the time of construction contract award. ATTACHMENTS 1. Resolution 2. Location Plan 3. Traffic Count Data from 4/2010 Agenda Report 4. Parking Estimate 5 Resolution No. 2010 -051: Resolution of Local Support M � ME C1P � 6/20/11 Reui e Est�mated „Uses B_ud et ?B e _ _ Relmburseitient Design $ 69,545 $ 53,500 $ 42,800 Planning /Environmental $ 20,000 $ 78,150 $ 62,520 Construction Contracts $ 625,000 $ 600,000 $ 480,000 Construction Management /Staff $ 90,000 $ 80,000 $ 64,000 C1P Overhead @ 2.4% $ 21,239 $ 21,239 Project Contingency $ 80,455 $ 73,350 $ 58,680 TOTAL $ 906,239 $ 906,239 $ 708,000 Funding Sources Street Maint Operating Budget $ 21,239 $ 21,239 (2.4% Overhead) Street Maint Operating Budget $ 7,600 $ 7,600 (20% Local Match) Prop 1 B Funding $ 169,400 $ 169,400 (20% Local Match) MTC -TLC Funding $ 708,000 $ 708,000 $ 708,000 TOTAL $ 906,239 $ 906,239 Staff still believes it is likely the entire project can be completed within the approved $906,239 budget. They also believe that the estimated additional costs may be reduced through negotiations with Caltrans staff and, even if they cannot, opportunities will exist to reduce construction costs that can make up the difference. Caltrans will not currently commit to paying above the already committed $96,000 (80% of $120,000), although it is common practice at the time of construction award to move any unused construction funds to PE. The worst case scenario would require a request from Council to increase the project budget at the time of construction contract award. ATTACHMENTS 1. Resolution 2. Location Plan 3. Traffic Count Data from 4/2010 Agenda Report 4. Parking Estimate 5 Resolution No. 2010 -051: Resolution of Local Support M ATTACHMENT 1 RESOLUTION NO. APPROVING A REVISED BUDGET FOR THE PETALUMA BOULEVARD SOUTH ROAD DIET PROJECT C1610110 WHEREAS, staff successfully applied for the Regional Transportation for Livable Communities funding through the Metropolitan Transportation Commission and was awarded $708,000 toward the Petaluma Boulevard South Road Diet Project; and WHEREAS, City Council previously authorized a resolution of local support assuring successful completion of the project and committing 20% of matching funds to the grant; and WHEREAS, the proposed project on Petaluma Boulevard South (from 100' south of East Washington to E Street) will reconfigure the current 4- through lanes to 2- through lanes and one two -way left turn lane in order to provide adequately sized driving and parking lanes and thereby improve safety for all modes of transportation and encourage more bicycle and pedestrian use; and WHEREAS, the project represents an ongoing effort by the City to improve traffic safety; and WHEREAS, staff has selected Green Valley Consulting Engineer through a RFP process for design services; and WHEREAS, the budget for design and environmental work previously approved by Council was $89,545 and. is now estimated to be $131,650 due to additional environmental work required by Caltrans to meet the obligations of the grant; and WHEREAS, sufficient funding for this purpose is available in the overall previously approved project budget with a potential to be reimbursed up to 80% of the cost by the grant; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby: 1. Authorizes a revised design budget in the amount of $131,650. ATTACHMENT 2 z r ® V 1 w U a a 1 0 N W U a Ins ^ W �i • 0 H V O a 0 0 FIIF �o U to C7 O lE ATTACHMENT 3 Traffic Counts before and after on PBN Road Diet 7 O M 7 O: h'` Na`d:CO. N•N_0) 00;00'N 00 ;t > 8) . :N:O:MCOL(c) :a), �:N :r; to 00 T- 0a) '00 r- MIOOD i`i1n Lf1i :r UOitO r -M:M Cr) m 0 `. to 1 0) :r r t` > Q 0 ? , 100 ; 0O : "i ` "00 "T U) � 0 r` - .00 00 03 _ OF t- CO , 1-- 0 0 CO : t-; a) T= t` ire -co cal to m;�; Itn�m;v to tO!U): rn 00 I I r r CO C CO CO Irn U) r-- o m.m: M m( o m m IN cD 10It-1 P- II r�ICr' Id'... - T I— CO im to I rCt ! r OO Iii; ihllTi00 I 1 COIaOIN OD COjIp i0 (y -- �3IU)ItTi N , l im,a 00 "' rl- lc -;0. :M _ L M I 0 ` M ; IM� CO; O! N (0 CO .. 1.01M!O N m tO r. 00 ; 00 CO : N �- m ; r r~' to U) cD a0 r : 00 tf) . 0) 00 c- M r d CO; T- O U7 d�; 0) O - CO 00 ' 0 N ! to : to N OD i 0) CF - It 'r- r ri r: CO CO T r t 3 o CO Lf) N:Cf7co : r- lr CO (3); C01 r- o N Lil 0 O ; (0. CD: i Ct ! Co. (D 04: Q) r t- (O :r N lfl N; O)ilAiO). !'M' CD: N Nit^ r O CO (6 0) oo:M; O'N:N i' r N 0): to N a ) 0 : : CO : : ' ti � UO : (O N : 00 : a) .: 00 CY I- T- r c- r i to to i r r O to'0 1 0) ;00' CO 0) : CO CO rt N - - -- C, t� (N CD ;0 0);to N CO m O'.(D;r; m O O M,0 CO f`: to tn jr:U):U) NiOO 00. ;r ti LO rn o o ti.O o r :o;o r- co o: CO rn N O O L O O L: 0 ; 0 : O: 0 1 1, 1 Liu N (Ct N'N lII' N N: l N (a' 7 U O p o �� o �� o�`z > � O 0 ZtL ZU- Z U ZLL' m [Ct (4 ,C YY WIM CQ- 0.0 O Z.> � 0 00 (t) O O 0 0 0: s Y Y m CO O —4- 4- a) aY 4- 4- 4- ��� o00 > to LLL C LL O O 7 "3'7 lQ O :3 : 3 6 0 O 0 0. 0 o O. o •� � �• > > : CO U) U) = J YYY (n U) (n >+>> A O O O Cl) U) > >, > , �, Y Y (6 O) a-+ ca 7 O 7 Y YY a_ U U.0 i+ 0) . C p 0) 0) a) N O N -0 .i2 d 0) N (U N d C_ C C N N O) N r l(S YYY JJ_J YY`1 YY`L m CO 7 ATTACHMENT 4 Parking Audit for Petaluma Boulevard South Estimated Parking Counts (subject to modification as part of design) Project Limits Start South of Washington to Crosswalk (Starbucks): Crosswalk to Western Existing Parking (18- 20') New City Std of 22' Northbound 7 6 Southbound 5 4 Crosswalk to Western Western to B Street Existing Parking (18- 22') New City Std of 22' Northbound 9 8 Southbound 8 8 Western to B Street B Street to C Street Existing Parking (18- 22') New City Std of 22' Northbound 6 6 Southbound 12 11 B Street to C Street C Street to D Street Existing Parking (22') New City Std of 22' Northbound 10 10 Southbound 7 7 C Street to D Street D Street to E Street Existing Parking New City Std of 22' Northbound 0 10 Southbound 0 0 D Street to E Street Total Existing Spaces Existing Parking New City Std of 22' Northbound 0 0 Southbound 0 11 Total Existing Spaces 64 Potential Spaces Rernoved (4) Potential Spaces Added 21 Total After Road Diet 81 Note: Inclusion of loading zones and determination of turning pockets will likely impact the above number of parking spaces. ATTACHMENT 5 Resolution No. 2010 -051 N.C.S. of the City of Petaluma, California RESOLUTION OF LOCAL SUPPORT CMAQ FUNDING AUTHORIZING THE FILING OF AN APPLICATION FOR REGIONAL TRANSPORTATION FOR LIVABLE COMMUNITIES FUNDING, COMMITTING THE NECESSARY NON - FEDERAL MATCH AND STATING THE ASSURANCE TO COMPLETE THE PETALUMA BOULEVARD SOUTH ROAD DIET PROJECT; AND APPROVING THE USE OF 2008 -09 PROPOSITION I R LOCAL STREETS AND ROADS IMPROVEMENT FUNDS AS MATCHING FUNDS WHEREAS, City of Petaluma (herein referred to as APPLICANT) is submitting an application to the Metropolitan Transportation Commission (MTC) for $677,600 in funding from the federal Congestion Mitigation and Air Quality Improvement (CMAQ) program for the Petaluma Boulevard South Road Diet (herein referred to as PROJECT) for the MTC Regional Transportation for Livable Communities (TLC) 2010 Capital Program (MTC Resolution, No. 3925) (herein referred to as PROGRAM); and, WHEREAS, the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA) (Public Law 109 -59, August 1,0, 2005) continued the Congestion Mitigation and Air Quality Improvement Program (CMAQ) (23 U.S.C. § 149) through September 30, 2009; and, WHEREAS, SAFETEA has been extended pursuant,to Public Law 1 1 -1 18 and may be subsequently extended pending enactment of successor legislation for continued funding; and, WHEREAS, pursuant to SAFETEA, and the regulations promulgated thereunder, eligible project sponsors wishing to receive federal Congestion Mitigation and Air Quality Improvement Program (CMAQ) funds for a project shall submit an application first with the appropriate Metropolitan Planning Organization (MPO), for review and inclusion in the MPO's Transportation Improvement Program (TIP); and, WHEREAS, the Metropolitan Transportation Commission (MTC) is the MPO for the nine counties of the San Francisco Bay region; and, WHEREAS, MTC has adopted a Regional Project Funding Delivery Policy (MTC Resolution No. 3606, revised) that sets out procedures governing the application and use of CMAQ funds: and, WHEREAS, APPLICANT is an eligible project sponsor for CMAQ funds; and, WHEREAS, as part of the application for CMAQ funding, M "rC requires a resolution adopted by the responsible implementing agency stating the following: 1. The commitment of necessary local matching funds of at least 20 %. Resolution No. 2010 -051 N.C.S. Page I E 2. That the sponsor understands that the CMAQ funding is fixed at the programmed amount, and therefore any cost increase cannot be expected to be funded with additional CMAQ funds. 3. That the project will comply with the procedures specified in Regional Project Funding Delivery Policy (MTC Resolution No. 3606, revised),. 4. The assurance of the sponsor to complete the project as described in the application, and il'approved, as included in MTC's TIP. 5. That the project will comply with all the project - specific requirements as set forth in the PROGRAM. NOW, THEREFORE, BE IT RESOLVED that the APPLICANT is authorized to execute and file an application for funding for the PROJECT under the Congestion Mitigation and Air Quality Improvement Program (CMAQ) of SAFETEA, any extensions of SAFETEA or any successor legislation for continued funding; and, BE IT FURTHER RESOLVED that the APPLICANT by adopting this resolution does hereby state that: 1. APPLICANT will provide $169,400 in non- federal matching fttnds. 2. APPLICANT understands that the CMAQ funding for the project is fixed at the MTC approved programmed amount, and that any cost increases must be funded by the APPLICANT from other funds, and that APPLICANT does not expect any cost increases to be funded with additional CMAQ funding. 3. APPLICANT understands the funding deadlines associated with these funds and will comply with the provisions and requirements of the Regional Project Funding Delivery Policy (MTC Resolution No. 3606, as revised). 4. PROJECT will be implemented as described in the complete application and in this resolution and, if approved, for the amount programmed in the MTC federal TIP. 5. APPLICANT and the PROJECT will comply with the requirements as set forth in the PROGRAM. BE IT FURTHER RESOLVED that APPLICANT is an eligible sponsor of CMAQ funded projects; and, BE IT FURTHER RESOLVED that APPLICANT is authorized to submit an application for CMAQ funds for the PROJECT; and, BE IT FURTHER RESOLVED that there is no legal impediment to APPLICANT making applications for the funds; and, BE IT FURTHER RESOLVED that there is no pending or threatened litigation that might in any way adversely affect the proposed PROJECT, or the ability of APPLICANT to deliver such PROJECT; and, Resolution No. 2010 -051 N.C.S. Page 2 10 BE IT FURTHER RESOLVED that APPLICANT authorizes its City Manager, or designee to execute and file an application with MTC for CMAQ funding for the PROJECT as referenced in this resolution; and, BE IT FURTHER RESOLVED that a copy of this resolution will be transmitted to the MTC in conjunction with the filing of the application; and, BE IT FURTHER RESOLVED that the MTC is requested to support the application for the PROJECT described in the resolution and to include the PROJECT, if approved, in MTC's TIP; and, BE IT FURTHER RESOLVED that Council approves the use of $169,400 of 2008 -09 Proposition 1 B Local Streets and Roads Improvement Funds as matching funds to the PROJECT. Under the power and authority conferred upon this Council by the Charter of said City. REFERENCE: AYES: NOES: ABSENT: ABSTAIN ATTEST: 1 hereby certify the foregoing Resolution was introduced and adopted by the Council of the City of Petaluma at a Regular meeting on the 5" day of April. 2010. by the following vote: Barrett, Vice Mayor Glass, Rabbitt, Renee, Mayor Torliatt Healy Harris None City Clerk City to r� i May, r Resolution No. 2010 -051 N.C.S. Page 3