Loading...
HomeMy WebLinkAboutResolution 2007-079 N.C.S. 05/07/2007 Resolution No. 2007-07y N.C.S. of the City of Petaluma, California RESOLUTION AUTHORIZING iVIAYOR TO SIGN LETTER REQUESTING STATE ASSISTANCE FOR FUNDING OF LOCAL PUBLIC WORKS PROJECTS WHEREAS, in November 2006, voters overwhelmingly passed bond packages that will provide monies for transportation, public works projects, housing, education, and flood control; and, WHEREAS, $43 billion is targeted for California pudic works projects; and, WHEREAS, more than. 50 bond-related bills have been introduced to the California legislature by communities and their officeholders in an effort to obtain money for specific projects or key problems in their districts; and, WHEREAS, the City of Petaluma is requesting the as~IStance of State Senator Carole Nligden in obtaining needed funding for city projects. NOW, THEREFORE, BE IT RESOLVED that the h?Iayor is authorized to sign a letter requesting such assistance on behalf of the City of Petaluma. ilnder die power and authority conferred upon this Council bythe Charter of'said City. m REFERENCE: ? hereby certify the foregoing Resolution was inh~oduced and adopted by the P i~ o d as to Council of the City of Petaluma at a Regular meeting onthe 7`h lay of May, 2007, ~f ~t: by the following vote: - City At rney AYES: Barrett, Freitas, ~'~ce `Viayor Nau, Rabbits, 1V~ayor Torliatt NOES: None t. ABSENT: Harris, O'Brien l ABSTAIN: None 5 ~ - ATTEST: _ -._t-=~ - - City Clerk - ~ Mayor' ~ - - Resolution No. 2007-074 N.C.S. Page 1 May 7, 2007 The Honorable Carole Migden State Senator, 3~d Senate District 3501 Civic Center Drive, Room 425 San Rafael, CA 94903 RE: Funding for Local Projects Dear Senator Migden: Attached please find a list of public works type projects from the City of Petaluma that could be eligible for funding from the $43 billion bond packages approved by voters last November. According to published reports and a review of legislation being introduced, Senators and Assemblymembers are submitting bills for a portion of these funds to be used. in their districts and we respectfully request your assistance in helping us obtain sorely needed funding for our City. Thank you for your consideration. Sincerely, Pamela Torliatt Mayor of Petaluma Enclosure Resolution No. 2007-079 N.C.S. Page 2 City ®f 1'etaiun~a, California 0 4 2007 M[ern®randun~ Department of Public. Works, P. D. Box 61, Petaluma, CA 94953 (707) 778-4474 Fax (707) 776-3602 E-mail:- publicworks@cipetaluma.ca.us DATE: May 3, 2007 TO: Michael Bierman, City Manager FROM: Vince Marengo, Director, Public Work. SUBJECT: State Senator Midgen City Projects List Following is a list of projects for Senator Midgen's consideration: 1. Old Redwood gI~vv Interchange o This project upgrades the Old Redwood Highway 101 interchange to meet current standards and.future traffic requirements. The proposed interchange includes ramp widening and reconfiguration, traffic operations system improvements, over-crossing structure widening to four lanes plus bicycle lanes; and enhanced signalization improvements at the intersections. It is anticipated that this project will be constructed concurrently with the Central B portion of the proposed future widening on US 101,, and will provide both safety and congestion relief enhancements. It has $1 OM Measure NI funds allocation with the City/local funds paying for the remaining l OM costs. Estimated total project cost: $21.666M 2. Rainier Cross-Town Connector/Interchan~e o .This project provides a new interchange on US 101 that connects the west side of Petaluma to the east side. In conjunction with new road improvements; it will provide an additional roadway connection between North McDowell Blvd. and Petaluma Blvd. North. This project will be designed to accommodate the proposed widening on US 101. It will add auxiliary lanes in both directions between the new Rainier interchange and the East Washington Street interchange, as well as provide congestion relief for traffic that is currently using the interchange at East Washington Street. Estimated total project cost: $40.817M 3. P__ avement Ci ide o The City of Petaluma's aged street system is deteriorating at a faster rate than funding can .accommodate. It is estimated that the City would need approximately $60M above anticipated funding for the pavement system to reach a "maintenance level". Resolution No. 2007-079 N.C.S. Page 3 Memo to Michael Bierman re State Senator Midgen's City Projects List May 3, 2007 - Page 2 4. Downtown Improvements Phases 2 and 3 o Phase 1 of this project revitalized Downtown Petaluma by providing the much needed pavement rehabilitation, street furnishings, historic street lights, tree wells, landscaping, sidewalk repairs and curb ramps. The City wishes to extend this well-received project through the remainder of the Downtown area. Estimated cost: $IOM. 5. Docks at The Turning Dasin o The docks, in an extreme state of disrepair, should have been replaced long, ago. They .are under a great deal of stress when, during low tide, sediment under the docks causes them to tilt at a 45 degree angle.- Budget: $ l .SM. 6. Caulfield Extension o This project constructs a roadway across the River, from Lakeville Street to Petaluma Boulevard South, by way of a new drawbridge. This will provide a southern cross-town connector and access to future development.. An undercrossing has been investigated as an alternate, but appears to be too expensive. The plan line will proceed after property owners assess the impact to their potential development opportunities. Total budget through design: $2.036M. Construction cost of $60M based upon a 100 ft. bridge opening. 7. D-Street Undergrounding and Widenin~- o This project to remove overhead utility lines and widen D-Street to improve traffic flow will lead to development and further improvement in this underutilized area of central Petaluma. Estimated cost: $IOM. 8. HVAC Improvements o The City has several buildings with 20+ years of use on their existing HVAC systems. All of the following buildings are in need of new units: Community Center, Police Deparhnent, City Hall, Teen Center (whose A/C, intended for an auto/mechanical shop, should be replaced with a new package unit). Budget: $2M. 9. Traffic Provision for Video Surveillance/Traffic Monitoring/Incident Management o This item includes the provision for video surveillance/traffic monitoring/incident management on our City's arterial street network. This project is thought to be a first. step in developing an Intelligent Transportation System (ITS) in the future. Monitoring of our network's busiest streets will allow for timely and appropriate response to traffic congestion and incidents, including emergency signal timing changes and emergency response. Regular review of.traffic conditions, with respect to-coordinated signal timing, make ,for increased efficiency and reduced green house gas emissions. Estimated cost is $300,000. VM alp Resolution No. 2007-079 N.C.S. Page 4