HomeMy WebLinkAboutResolution 94-113 05/09/1994S®LIJTI®N 1V®. 94-113 ~• ~ • S
1 ®f the City ®f Petaluma, California
2
3 AUTIIORIZE CITI' MANAGER TO EXECUTE CONTRACT
4 WITII CSW/STUBER-STROEII ENGINEERING GROUP
5 TO PREPARE A STUDY OF IlVIPROVEMENTS FOR TIIE
6 E. WASIIINGTON STREET CORR~OR
7 FROM McDOWELL BLVD. TO ELLIS STREET
8
9
10 WIIEREAS, the City's Capital Improvement Program anticipates undertaking a project
11 to improve traffic flow at E. Washington Street Corridor from McDowell Blvd. to Ellis
12 Street, including the intersection of McDowell Blvd. and E. Washington Street and the
13 E. Washington/U.S. 101 Interchange, and;
14
15 WIIEREAS, the staff proposes that CSW/Stuber-Stroeh Engineering Group provide
16 consulting services to conduct a study of alternatives, and;
17
18 WIIEREAS, the professional consulting services are on a "time and expense basis not
19 to exceed" contract of $72,000 (fee of $66,368 plus 8 percent contingency).
20
21 NOW, TIIEREFORE, BE IT RESOLVED, the City Council authorizes the City
22 Manager to sign a contract with CSW/Stuber-Stroeh Engineering Group for
23 professional consulting services.
24
25
26
27 csw/sb/agenda/a:4
28
29
Under the power and authority conferred_upon this Council by the Charter of said City.
REFERENCE: I hereby certify the foregoing Resolution was introduced snd adopted by the Approved as to
Council of the. City of Petaluma at a (Regular) (~~~~~) meeting form
on the ........9x11._......... day of ...................May.............................._, 19.94.., by the
following wte: .............! .... ...................
C ty Att rney
AYES: Sobel, Shea, Vice Mayor Mayor Hilligoss
NOES: Hamilton, Barlas
ABSENT: None (Nelso i d 4/4/94)
.............:... ........... ........... ...... ....................
ATTEST: ..~:~~
City ~;lerk
Council Fils.._.._..-......_._........._
CA 10.85 Rea Na.........94.-11.3... N.C.S.