Loading...
HomeMy WebLinkAboutResolution 94-113 05/09/1994S®LIJTI®N 1V®. 94-113 ~• ~ • S 1 ®f the City ®f Petaluma, California 2 3 AUTIIORIZE CITI' MANAGER TO EXECUTE CONTRACT 4 WITII CSW/STUBER-STROEII ENGINEERING GROUP 5 TO PREPARE A STUDY OF IlVIPROVEMENTS FOR TIIE 6 E. WASIIINGTON STREET CORR~OR 7 FROM McDOWELL BLVD. TO ELLIS STREET 8 9 10 WIIEREAS, the City's Capital Improvement Program anticipates undertaking a project 11 to improve traffic flow at E. Washington Street Corridor from McDowell Blvd. to Ellis 12 Street, including the intersection of McDowell Blvd. and E. Washington Street and the 13 E. Washington/U.S. 101 Interchange, and; 14 15 WIIEREAS, the staff proposes that CSW/Stuber-Stroeh Engineering Group provide 16 consulting services to conduct a study of alternatives, and; 17 18 WIIEREAS, the professional consulting services are on a "time and expense basis not 19 to exceed" contract of $72,000 (fee of $66,368 plus 8 percent contingency). 20 21 NOW, TIIEREFORE, BE IT RESOLVED, the City Council authorizes the City 22 Manager to sign a contract with CSW/Stuber-Stroeh Engineering Group for 23 professional consulting services. 24 25 26 27 csw/sb/agenda/a:4 28 29 Under the power and authority conferred_upon this Council by the Charter of said City. REFERENCE: I hereby certify the foregoing Resolution was introduced snd adopted by the Approved as to Council of the. City of Petaluma at a (Regular) (~~~~~) meeting form on the ........9x11._......... day of ...................May.............................._, 19.94.., by the following wte: .............! .... ................... C ty Att rney AYES: Sobel, Shea, Vice Mayor Mayor Hilligoss NOES: Hamilton, Barlas ABSENT: None (Nelso i d 4/4/94) .............:... ........... ........... ...... .................... ATTEST: ..~:~~ City ~;lerk Council Fils.._.._..-......_._........._ CA 10.85 Rea Na.........94.-11.3... N.C.S.