Loading...
HomeMy WebLinkAboutResolutions 2011-115 N.C.S 07/18/2011 Resolution No. 2011 -115 N.C.S. of the City of Petaluma, California DENYING THE APPEAL BY GAIL ODOM AND UPHOLDING THE PLANNING COMMISSION'S APPROVAL OF MODIFICATIONS TO THE PREVIOUSLY APPROVED CONDITIONAL USE PERMIT FOR COWGIRL CREAMERY LOCATED AT 419 FIRST STREET, APN 008 - 121 -014, FILE NO. 11 -APL -0167 WHEREAS, on August 26, 2010, Sue Conley submitted an application (10- CUP -0431) to the City of Petaluma for modifications to an existing Conditional Use Permit 07- CUP -0144 for Cowgirl Creamery located at 419 First Street, Assessor's Parcel Numbers 008 - 121 -014 (the modifications are referred to as "the Project" or the "proposed Project "); and, WHEREAS, on February 22, 2011, the City of Petaluma Planning Commission conducted a duly noticed public hearing of the Project to consider and review modifications to the previously approved Conditional Use Permit for Cowgirl Creamery to legalize the addition of a 4,500 gallon whey storage tank (existing); change hours of operation for production from 6:30 a.m. to 5:00 p.m. to 6:00 a.m. to 5:00 p.m.; change the number /schedule of deliveries onsite for milk and wastewater and whey haul off; allow limited public tours to be conducted onsite through the cheese making facility; clarify that interior square footage of 8,640 includes the 1,428 square foot tour corridor; and to allow for a potential small on -site wastewater pretreatment system; and, WHEREAS, on February 22, 2011, after considering the public testimony and the application materials, the Planning Commission approved the Project based on the findings and conditions of approval set forth in Planning Commission Resolution No. 2011 -01; and, WHEREAS, on March 8, 2011, an appeal of the February 22, 2011 decision of the Planning Commission was filed by Ms. Gail Odom stating that she represented herself and an unnamed group of residents at Celsius 44; and, WHEREAS, on July 6, 2011, a public notice of the July 18, 2011 appeal hearing before the City Council was mailed to all residents and property owners within 500 feet of the subject property and to all other interested parties, and a notice of the July 18, 2011 appeal hearing before the City Council was published in the Argus Courier on July 7, 2011; and, WHEREAS, on July 18, 2011, the City Council held a public hearing during which the City Council considered the appeal and received and considered all written and oral public comments for the project, including but not limited to staff report and exhibits, and testimony from all interested persons appearing in the matter. NOW THEREFORE, BE IT RESOLVED that the City Council based on duly noticed public hearing held on July 18, 2011 and related comments and testimony, fully considered all evidence presented at the public hearing of this appeal, as well as oral and written evidence contained in the full record of proceedings on this matter, and on that basis, denies the appeal filed on March 8, 2011 by Gail Odom and upholds the Planning Commission approval of Resolution No. 2011 -115 N.C.S. Page 1 modifications to the previously approved Conditional Use Permit 07 -CUP -0144 for Cowgirl Creamery located at 419 First Street, APN 008 - 121 -014 ( "the Project "). BE IT FURTHER RESOLVED that the Project is exempt from the provisions of CEQA pursuant to CEQA Guidelines Section 15301 (Existing Facilities), Class 1, as the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of an existing private structure, facility and mechanical equipment, involving negligible or no expansion of use. BE IT FURTHER RESOLVED that the City Council, based on the evidence and testimony in the public record and from the public hearing on July 18, 2011, adopts the following findings and conditions of approval made by the Planning Commission as a basis for its denial of the Appeal and approval of the CEQA exemption for the Project: FINDINGS: 1. The recitals above and the analysis, facts and information presented in and with the staff report are incorporated herein by reference as though fully set forth. 2. The Project, is exempt from the provisions of CEQA pursuant to CEQA Guidelines Section 15301 (Existing Facilities), Class 1, as the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of an existing private structure, facility and mechanical equipment, involving negligible or no expansion of use, and based on the record herein including the incorporated staff reports and attachments, approval of the project does not involve a sensitive environmental location, cumulative impacts, unusual circumstances, scenic highways, hazardous waste sites, or adverse changes to historic resources which would create significant adverse impacts or preclude use of the designated categorical exemption, pursuant to CEQA Guidelines Section 15300.2. 3. The Project is consistent with the General Plan Mixed -Use land use designation which allows for a variety of residential, commercial office, retail and industrial uses consistent with the respective development regulations established within the Central Petaluma Specific Plan area (CPSP). The intent of this designation is to promote mixed use throughout the area. The Project is consistent with the following goals, policies and programs of the 2025 General Plan: 1 -P -1 Promote a range of land uses at densities and intensities to serve the community needs within the Urban Growth Boundary (UGB). 1 -P -11 Allow land use intensification at strategic locations along the arterial corridors leading to Downtown and Central Petaluma, including aging commercial and industrial sites. 2 -P -4 Support the continuation of active industry, including river - dependent land uses, within the community to provide a balance of land uses and the maintenance of the river as a working river. 3 -P -4.0 Work with local groups and organizations to provide tours, educational Resolution No. 2011 -115 N.C.S. Page 2 opportunities and other public information programs geared toward increased knowledge and understanding of Petaluma's historic and cultural resources. 9 -P -1 Retain and attract `basic' economic activities that bring dollars into the local economy by exporting products and services 9 -P -3 Provide an array of employment opportunities to existing and future residents by assuring diversity in Petaluma's industry and enterprise mix. The Project approves modifications to an existing CUP and permits continued use of property for active industry in a pre- existing industrial warehouse within the CPSP area. It will provide weekly tours of the cheese processing plant which will increase knowledge and understanding of Petaluma's relationship to historic and existing agricultural uses, including milk production and dairy farming. Operation of the business approved by the Project will produce products, gourmet cheeses, which will be exported and will bring dollars into the local economy from local wages, business license taxes and operating profits. It will provide employment to existing and future residents for production employees. Conditions of approval of the project require noise controls to minimize noise levels, including a requirement that the project meet Petaluma Implementing Zoning Ordinance ( "IZO ") Performance Standards as adapted for application in the CPSP area. 4. The subject property is located in the Riverfront Warehouse District of the Central Petaluma Specific Plan area and has a land use designation of Mixed Use. The Riverfront Warehouse District comprises the west side of the river from D Street to McNear Hill. It is bordered on the east by the river, on the north by D Street, on the west by Petaluma Boulevard South, and on the south by McNear Hill. In the area between D Street and Foundry Wharf, the grid of local streets provides the basic organizing structure for an unusually high mixture of industrial, commercial and residential land uses (See Attachment D). This designation in the CPSP allows for a variety of residential, commercial office, retail and industrial uses consistent with the land use and respective development regulations established within the CPSP area. The Project supports the following district land use objectives and policies for the Riverfront Warehouse District: • Objective 4: Provide for a mix of compatible light industrial, office, retail and residential uses that maintain the unique character of the area. • Policy 4.1: Allow office, research and development, and light industrial uses that are consistent and compatible with the existing use, scale and character of the area. The Project is a light industrial use, Food and Beverage Product Processing, which continues industrial use in a pre- existing warehouse building, contributing to the unique character of the Riverfront Warehouse District, and continuing the existing scale and character of the structure and surrounding environs. The project uses milk products produced in agriculture that are traditional to Petaluma and its agricultural heritage. 5. The Project, as conditioned, will conform to applicable requirements of the CPSP SmartCode. The subject property is zoned T -5 (Urban Center) and Flood Plain Resolution No. 2011 -115 N.C.S. Page 3 Combining District (FP -C). The proposed use is an existing cheese production facility housed in an existing warehouse building. Food and Beverage Product Manufacturing larger than 5,000 square feet in area requires a Conditional Use Permit in the T -5 zoning district. Cowgirl Creamery is a Food and Beverage Product Manufacturing operation with a dairy products manufacturing use as the primary use, and is larger in size than 5,000 square feet on the ground floor. Therefore, a CUP was required for the original approval. The Project proposes only minor site modifications such as adding a 4,500 gallon whey storage tank, minor changes to hour of operation for production and number of deliveries, adding a limited number of public tours, clarifying the square footage for the business operation and allowing a potential small pretreatment system for wastewater, subject to design and environmental review, if needed in the future to permit wastewater discharge to the City's wastewater system. 6. The Project as conditioned is consistent with Petaluma's IZO. Almost all zoning specifications for the property are contained within the CPSP and its SmartCode. However, the property is also subject to the IZO Flood Plain Combining District (FP -C), because the 1989 and 2008 Flood Insurance Rate Maps show the property within the 100 - year flood plain. The proposed project is compliant with IZO Section 6.070.D, because the finish floor of the building is 1.1 feet above the base flood elevation noted on the Flood Insurance Rate Map (FIRM), and the whey tank will also be elevated to the required height, and also be protected by a containment berm. 7. The Project, as conditioned, is not subject to parking requirements because the CPSP SmartCode, Section 6.10.070, Sunset Clause: Establishment of Civic Parking Infrastructure, states, "Effective January 1, 2008, there shall be no minimum parking requirements for any use, notwithstanding the minimum parking requirements established in Sections 6.10.10." The Project currently has 16 on -site parking spaces at 419 First Street and an additional nine (9) parking spaces for tour attendees /visitors and one (1) van parking space on the adjacent site at 425 First Street. 8. A notice of the proposed Project was first published in the Argus Courier and mailed to property owners within 500 feet of the subject property on September 30, 2010. The project was then re- noticed on December 30, 2010 to include some changes to the initial scope of the project. Staff received multiple comments regarding the proposed project during the public comment period for both notices. . The final notice of public hearing for the Project was published on February 10, 2011. 9. A public notice of the July 18, 2011 appeal hearing before the City Council was published in the Argus Courier on July 7, 2011 and mailed to all residents and property owners within 500 feet of the subject property and to all other interested parties on July 6, 2011. 10. The Project, as conditioned, is consistent with IZO, Chapter 21, Performance standards, regarding noise from operations. The proposed modifications do not generate noise in excess of what is normally associated with the nature of industrial activities of the Central Petaluma area. The proposed whey storage tank does not generate noise that exceeds the General Plan Ambient noise levels. Successful operation of the whey tank is expected to allow wastewater discharge directly to City sewers and eliminate four semi tanker truck trips per week, with beneficial effects on noise and traffic. Resolution No. 201 1 -1 15 N.C.S. Page 4 11. The Project, as conditioned, is consistent with IZO Section 24.030 (M) and its description of changes permissible made through Minor Use Permits. The proposed project has an existing Conditional Use Permit (07- CUP -0144) to allow a 6,000 square foot cheese production and storage facility at 419 First Street. Section 24.030 (M) of the IZO allows "minor use permits" to include minor exterior modifications or enlargements to existing use permits, said modifications or enlargements being inconsequential in nature and not involving a significant change in operations; minor extension of operating hours to existing use permits where the business has no appreciable outside noise and/or does not abut a residential district; and new use permits where the use is of the same or more restricted nature as the previous use occupying the site. Section 24.030.M does not define "residential districts" for the purpose of this subsection, but elsewhere in the IZO, "residential districts" for purposes of hours of operation of non - residential uses abutting residential districts is defined to include RR, R -1, R -2, R -3, R -4, R -5 and PUD. (IZO, Section 21.030). The abutting properties are all within the CPSP T5, mixed use zone, and subject instead to the provisions of the CPSP regarding noise, which are met by the project. 12. The construction of the Project, as conditioned, will not constitute a nuisance or be detrimental to the public welfare of the community in that it will be operated in conformance with the Performance Standards specified in the Uniform Building Code, the Petaluma IZO as applied to the CPSP, the City of Petaluma General Plan 2025, and the Central Petaluma Specific Plan and SmartCode. Under the power and authority conferred upon this Council by the Charter of said City. REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the led as to Council of the City of Petaluma at a Regular meeting on the 18` day of July, 201 1, m: by the following vote: Attorney AYES: Albertson, Barrett, Mayor Glass, Harris, Kearney NOES: None ABSENT: Vice Mayor Healy ABSTAIN: Renee ATTEST: 41 elG City Clerk Mayor Resolution No. 2011 -115 N.C.S. Page 5 EXHIBIT A CONDITIONS OF APPROVAL From the Community Development Department, Planning Division 1. The plans submitted for building permit shall be in substantial conformance with the plans submitted to the Planning Division for the whey storage tank location except as modified by the following conditions. 2. All prior conditions of approvals for this site (419 First Street) established under 07 -CUP- 0144 shall remain in full effect except as modified by the following conditions. 3. Any physical expansion of the facility shall require an amendment to this Conditional Use Permit. 4. Any change(s) to the use, hours or days of operation, number of employees, number of deliveries onsite or any other conditioned activity shall require review by the City and may require application for and approval of an amendment to this conditional use permit. 5. The following deliveries are allowed under this CUP: o Six deliveries of milk per week o One pick up of finished product per day o 4 semi tankers off hauls of waste water per week o 1 semi tanker offhauls of whey each week o Occasional FedEx, UPS, USPS or other similar third party delivery service or messenger service deliveries At such time as Cowgirl Creamery receives a City of Petaluma wastewater discharge permit allowing production wastewater to be discharged into the City's wastewater system, the 5 offhaul trips per week will be reduced to: o 1 semi tanker offhaul of whey per week 6. No business operations including deliveries are permitted on Sundays. 7. Scheduled tours may be offered once per week between 10:30 a.m. and 1:30 p.m. for a maximum of 25 people. Up to a maximum of two additional tours per week may be held between 10:30 a.m. and 1:30 p.m. for a maximum of 25 people each, in response to individual requests to Cowgirl Creamery for such tours, but the additional tours shall not be regularly scheduled or presented absent such requests. 8. The hours of operation shall be from 6:00 a.m. to 5:00 p.m. Operation prior to 6:30 a.m. shall not include full scale production, but shall be limited to receiving deliveries only. 9. On plans submitted for building permit, these conditions of approval shall be included on the first plan sheet. 10. Cowgirl Creamery shall work with its sublessee to encourage that the quality of life of the surrounding neighborhood is not adversely impacted by operations of either businesses. 11. Cowgirl Creamery shall post visible signs that do not allow idling of trucks. Truck engines shall be completely turned off when parked. No trucks are allowed on site prior to 6 a.m. Resolution No. 2011 -115 N.C.S. Page 6 12. All construction activities shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday and interior work only between 9:00 a.m. and 5:00 p.m. on Saturdays. Construction shall be prohibited on Sundays and all holidays recognized by the City of Petaluma. 13. The site shall be kept cleared at all times of all garbage and debris. Outdoor storage (pallets, barrels, scraps etc) visible from First Street shall be removed or stored inside prior to final inspection of the tank installation. 14. At no time shall business activities exceed the Performance Standards specified in Chapter 21 of the Petaluma IZO and /or General Plan 2025 with respect to noise, vibration, glare, smoke, odor and dust, except as expressly permitted by the CPSP and /or CPSP SmartCode. 15. The future onsite pretreatment water system shall be subject to review by the Planning Division. A small underground tank may require only a Building Permit. However, an overhead tank that is visually obtrusive and /or generates noise will be subject to a Minor Site Plan and Architectural Review approval as well as environmental clearance, but shall not necessitate a CUP modification. Administrative SPAR review, if warranted, shall be conducted pursuant to Section 24.010 of the 1ZO, shall be noticed to property owners and residents within 500 feet of the Project, and such parties and the general public shall be given an opportunity to comment on impacts of the Project within the scope of SPAR. 16. This use permit may be recalled by the Planning Division for review at any time due to complaints regarding lack of compliance with conditions of approval, traffic congestion, noise generation, or other adverse operating characteristics. At such time, the Planning Division may revoke the use permit or add /modify conditions of approval. The applicants /developers shall defend, indemnify, and hold harmless the City or any of its boards, commission, agents, officers, and employees ( "indemnitees ") from any claim, action or proceeding against the City, its boards, commission, agents, officers, or employees to attack, set aside, void, or annul, the approval of the project whether or not such claim or action is brought within the time period provided for in applicable State and /or local statutes. The City shall promptly notify the applicants /developers of any such claim, action, or proceeding. In the event that applicant is required to defend the indemnitees in connection with any said claim, action or proceeding, the City shall retain the right to (i) approve defense counsel, (ii) approve all significant decisions concerning the manner in which the defense is conducted and (iii) approve any and all settlements, which approvals shall not be unreasonably withheld. The City shall cooperate fully in the defense. Nothing contained in this condition shall prohibit the City from participating in a defense of any claim, action, or proceeding in any other fashion if the City bears its own attorney's fees and costs, and the City defends the action in good faith. From the Public Works Department 17. The proposed tank is located within the 100 -year floodplain. Therefore, the bottom of the proposed tank shall be constructed at least one foot above the 100 -year flood elevation. The tank pad and equipment shall be designed by a registered professional engineer or architect to resist hydrostatic and hydrodynamic loads as well as resist the effects of buoyancy in accordance with the City's Flood Plain Ordinance. If the tank is relocated to a portion of the site outside the 100 -year flood plain, this condition is subject to revision, if approved by the City Engineer and Planning Division. Resolution No. 2011 -115 N.C.S. Page 7 From the Department of Water Resources and Conservation and Fire Marshal 18. The proposed tank shall have a containment berm to protect the river. Final inspection and written approval of the containment berm from the Fire Department and Department of Water Resources and Conservation shall be obtained prior to Building Permit Final for the whey storage tank. From the Building Division 19. Building permit for seismic bracing of the tank including structural calculations for seismic loads is required. Resolution No. 2011 -115 N.C.S. Page 8