Loading...
HomeMy WebLinkAboutHCPC Resolution 2022-02 04/12/2022 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 RESOLUTION 2022-02 CITY OF PETALUMA HISTORIC AND CULTURAL PRESERVATION COMMITTEE APPROVING HISTORIC SITE PLAN AND ARCHITECTURAL REVIEW FOR THE EAMES RESIDENCE LOCATED AT 235 LIBERTY STREET APN: 006-273-015 FILE NO: PLSR-2021-0025 WHEREAS, Ryan Eames submitted an application for approval of Historic Site Plan and Architectural Review alterations to an existing single-family home located at 235 Liberty Street, within the Oakhill-Brewster Historic District (APN 006-273-015) ("Project"); and WHEREAS, the Project, given its location within a designated historic district is subject to review by the Historic and Cultural Preservation Committee consistent with Section 15.020 of Chapter 15 of the Petaluma Implementing Zoning Ordinance; and WHEREAS, the Oakhill-Brewster Historic District Preservation Guidelines and Standards, adopted by the Petaluma City Council in 1990 through Ordinance No. 1796 N.C.S. provide guidance for new construction to ensure that the characteristics which justify designation of the District are maintained; and WHEREAS, with the exception of the historic era retaining wall and stairs which will be retained, no historic era features of the previous residence remain onsite; and WHEREAS, on April 12, 2022 the Historic and Cultural Preservation Committee held a duly noticed public hearing to consider the application, at which time all persons interested had the opportunity to be heard; and, WHEREAS, on April 12, 2022, the Historic and Cultural Preservation Committee considered a staff report analyzing the application, including the California Environmental Quality Act ("CEQA") determination included therein; and WHEREAS, a public notice of the Historic and Cultural Preservation Committee hearing was published in the Petaluma Argus Courier and mailed to residents and occupants within 1,000 feet of the Project site in compliance with state and local law; and WHEREAS,a neighborhood meeting was held and public hearing signs were posted on site on March 25, 2022, prior to the public hearing, consistent with City Council Resolution No. 18-107. NOW THEREFORE, BE IT RESOLVED THAT: A. The foregoing recitals are true and correct and incorporated herein by reference. B. Based on the staff report, staff presentation, comments received and the public hearing, the Historic and Cultural Preservation Committee makes the following findings based on substantial evidence in the record: Historic&Cultural Preservation Committee Resolution No.2022-02 Page 1 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 California Environmental Quality Act 1. The Project is categorically exempt from the California Environmental Quality Act (CEQA), pursuant to CEQA Guidelines Section 15301 (Existing Facilities) and Section 15331 (Historical Resource Restoration/Rehabilitation),which involves alterations to an existing single-family dwelling on a residentially zoned site and the project would not be prohibited from the use of a categorical exemption due to the exceptions listed in Section 15300.2 Petaluma General Plan 2. The Project is consistent with the site's Land Use Map designation of Medium Density Residential as it would result in alterations to an existing new single-family dwelling on an approximately 6,120 square foot (0.14 acres) lot. 3. The project is, for the reasons contained in the April 12, 2022 Historic and Cultural Preservation Committee staff report, consistent with the following General Plan policies: Policy 1-P-3 Preserve the overall scale and character of established residential neighborhoods. Policy 3-P-1 Protect historic and archaeological resources for the aesthetic, cultural, educational, environmental, economic, and scientific contribution they make to maintaining and enhancing Petaluma's character, identity and quality of life. Oakhill-Brewster Historic District Preservation Guidelines and Standards 4. The project is consistent with the applicable Standards for Review listed in Section IV of the Oakhill Brewster Historic District Preservation Guidelines and Standards, as follows: a. Architectural Style. The project alteration includes adding a new attached garage within the existing massing and the addition of a new driveway with front retaining stone walls, two new attic windows to the primary/front facade, a gable roof at the rear, restoration of rear porch, and installation of new decorative trim throughout the residence to match historic photographs circa 1897. New features such as an attached garage were not typical of a late nineteenth century Queen Anne residence, although, the alteration allows for modernization of the existing residence without the removal of character defining features or change to the historic massing of the residence. These proposed alterations are generally consistent with the residence's original Queen Anne architectural style in that its distinguished architectural features including steeply pitched roof, dominant front-facing gable, patterned shingles, and decorative trim will continue to describe the property's original architectural style. The Queen Anne is one of the 16 architectural styles appearing in the Historic District and is identified as the architectural style for this particular residence. As such, the project is consistent with this District Guideline. b. Architectural Design. The proposed project does not increase the residential footprint therefore does not alter the existing scale of the residence. The new rear gable roof will have a siding material to match the existing second floor horizontal and patterned siding and the roofing material proposed is a wood shingle composite material. The new and restored retaining walls will have appropriate basalt stone to match the historic photographs and neighboring residences. Design motifs such as the existing trims will be repaired and maintained along with new trim details will be replicated and applied to the home to match the historic photographs. As stated previously, new features such as an attached garage were not typical of a late nineteenth century Queen Anne residence, although, the alteration allows for modernization of the Historic&Cultural Preservation Committee Resolution No.2022-02 Page 2 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 existing residence without the removal of character defining features or change to the historic massing of the residence. As such, the project is consistent with this District Guideline.. c. Architectural Arrangement (Setback). The proposed new attached garage is in-line with the existing setback, located under the existing bay window, and does not modify the existing setback. As such, the project is consistent with this District Guideline. d. Architectural Arrangement (Side Yards). Similarly to various other properties located along the Liberty Street frontage, this residence has a prominent front and side yard and accommodating detached accessory structures. The proposed project does not increase the residential footprint, though the new attached garage and driveway is visible to the immediate neighborhood. The project documents include a study of neighboring properties in the area with a ground floor garage alteration, demonstrating similarities with new attached garages. The new garage door shall match the existing front door entrance and does not detract from the existing Queen Anne architectural features. The style of the garage door is depicted in the east elevation with heavily molded panels. Garage door colors will include Boothbay Gray for garage door stiles and rails, Oxford Gray for garage door panels, and Aubergine and Hale Navy for rosettes. As such, the project is consistent with this District Guideline. e. Architectural Arrangement (Height). The project does not increase the residence's overall height. The new rear gable will match the height existing of the front gable in height,slope, and material, typical of the Queen Anne architectural style.As such, the project is consistent with this District Guideline. f. Architectural Arrangement(Roofline).The new rear roof gable is proposed to modify a previously made modification that is inconsistent with the overall design of the home. The proposed modification to the roof at the rear of the building will match the existing front roof gable in height, slope, and material,typical of the Queen Anne architectural style. Residences within the immediate neighborhood include gable, hip, and shed roof forms across a variety of architectural styles including the adjacent Craftsman and Queen Ann architectural style. As such, the project is consistent with this District Guideline. g. Architectural Arrangement(Fagade).The proposed project includes a new gable roof to the rear of the residence; therefore the south fapade is altered to include a pitched gable roof and a dormer with windows. and will be restored to the original design of a dormer with windows. The historic photograph dated 1910 (refer to Figure 4) records an original dormer in the rear of the second floor.The dormer and windows are placed in an appropriate rhythm to match the existing Queen Anne style. The continuous use of the existing horizontal and patterned wood siding provides for a cohesive design. The porch on the ground floor to the rear of the residence will be reinstated to match the existing front porch in style, architectural features, and materials. As such, the project is consistent with this District Guideline. h. Texture and Materials. The project proposes materials that are consistent with the original Queen Anne style of the residence. Proposed materials include siding to match existing second floor,which is a combination of horizontal and patterned wood siding, and the proposed roofing material as a wood shingle composite material in an "aged cedar" finish. As such the project is consistent with this District Guideline. i. Color. The project proposes colors that are consistent with the original Queen Anne style of the residence. For color samples, refer to Attachment E, page 6-7. The colors are modest, cohesive to the residence and the surrounding structures, and are Historic&Cultural Preservation Committee Resolution No.2022-02 Page 3 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 appropriate to the late nineteenth century period.As such is consistent with this District Guideline. j. Fencing: A new rear yard pool and new front yard fence are under a separate permit application and are not part of this HSPAR scope of work. k. Plantings: A schedule of proposed plantings and reference photographs are included at Attachment E. Proposed plantings include primarily shrubs and groundcovers in the front yard on either side of the new driveway. Consistent with COA #12, installation of landscaping will be contingent upon drought regulations in place at the time of completion of the residence. As such, the project is consistent with this District Guideline. I. Paving:The project includes installation of pavement for a new driveway and sidewalk. Entrance to the new attached garage will be gently sloped with concrete strip driveway with a trench drain connected to the on-site drainage. Within the public right-of-way, all new sidewalk with score pattern to match the existing will be poured in place with the inclusion of a new driveway apron. Project plans demonstrate the paved driveway area within the property line meets the maximum square feet allowed of the front yard. Consistent with COA #15, no more than one-third of the front yard, or 200 square feet, whichever is greater should be hard-surfaced. The final measurements shall be provided to staff for final review. As such, the project is consistent with this District Guideline. m. Public Access Easement and Dedication on Alleys. As proposed and conditioned with COA#16, the project will provide a five-foot Public Access Easement at the rear of the lot, facing Pepper School Alley, and as such is consistent with this District Guideline. Secretary of Interior's Standards and Guidelines 5. The Project is consistent with the Secretary of the Interior's Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings, as follows: a. Standard#1:The property was historically developed with a residence,and continuous to be located in a residential zone with a historic district overlay. No changes are proposed to the use of the building as a single-family residence. As such, the project is consistent with this standard. b. Standard #2: The project does not propose removal of integral historic architectural features related to the "Queen Anne" architectural style. Features to be removed include later additions such as the existing rear second floor apartment flat roof and altered stone wall which would be replaced with the historically appropriate basalt stone material. For the addition of the garage door, the area below the bay window of cripple wall siding will be removed. As such, the project is consistent with this standard. c. Standard #3: As stated previously, new features such as an attached garage were not typical of a late nineteenth century Queen Anne residence, although, the alteration allows for modernization of the existing residence without the removal of character defining features or change to the historic massing of the residence. The project incorporates architectural features that are compatible with the existing Queen Anne architectural features and incorporates elements that avoid creating a false sense of historical development, consistent with this standard. d. Standard #4: According to the Consistency Evaluation report prepare by Alice P. Duffee, Historic Preservation Planner, observed the rear of the nineteenth century Historic&Cultural Preservation Committee Resolution No.2022-02 Page 4 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 residence was raised to two stories and an apartment was located in the upper level between 1906 and 1910 of the Sanborn fire insurance maps. A rear ground floor porch was created under the overhanging second level on the south side. Through a permit record search, the report also gathered, the second story rear deck and stairs were rebuilt in 1998. Subsequent reconfiguration of the rear of the residence without character defining features has not acquired or increased additional historic significance in its own right to rear of the residence.As such, altering the rear to a gable roof with dormer and windows, along with restoring the rear ground floor porch to support the Queen Anne style is consistent with this standard. e. Standard #5: As previously stated, the project will preserve the historic nineteenth century residence along with adding a new attached garage, a new driveway with new front retaining stone walls, two new attic windows to the primary/front facade, a gable roof at the rear,restoration of rear porch, and installation of new decorative trim throughout the residence to match historic photographs circa 1897. This will unify the historic fabric with its distinctive Queen Anne features, finishes, and construction techniques. As such, the project is consistent with this standard. f. Standard #6: Deteriorated historic features will be repaired rather than replaced. The historic photographs provide reference to the missing architectural features that the project will replace, particularly the historic trims. As such, the project is consistent with this standard. g. Standard #7:The project description and scope does not include chemical or physical treatment details. It is conditioned with COA#17, chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible is taken to avoid damage to the historic materials. As such, the project is consistent with this standard. h. Standard #8: As conditioned with COA#18, the project is required to comply with measures to protect and preserve significant archeological resources if potentially significant prehistoric or historic archeological resources are encountered during the course of ground disturbing activities. As such, the project is consistent with this standard. i. Standard#9:The project alteration includes adding a new attached garage within the existing massing and the addition of a new driveway with front retaining stone walls, two new attic windows to the primary/front facade, a gable roof at the rear, restoration of rear porch, and installation of new decorative trim throughout the residence to match historic photographs circa 1897. The proposed alterations do not destroy the historic materials that characterize the property. Furthermore, the alterations are compatible with the existing massing, size, scale and architectural features related to the Queen Anne style to protect the historic integrity of this property. As such, the project is consistent with this standard. j. Standard #10: The project involves the addition of an attached garage, gable roof at the rear, driveway and retaining walls that could be removed with no impact to the historic fabric. As such, the project is consistent with this standard. Implementing Zoning Ordinance 6. The project site is located within the R3 Zoning District, which permits development of single-family residences by-right, subject to the objective development standards contained in Table 4.8 of the IZO. The project does not increase the residential footprint, nor increases the overall height of the building. As such, the property continues to be consistent with development standards including setbacks, height, and lot coverage. Historic&Cultural Preservation Committee Resolution No.2022-02 Page 5 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 7. The project is consistent with Chapter 15 (Preservation of the Cultural and Historic Environment), in that it has been reviewed by the HCPC in accordance with the requirements contained in Section 15.070 of the IZO, and it has been determined that the proposed alterations will not adversely affect the character, or the historical,architectural, or aesthetic interest or value of the district. 8. The Project is consistent with the Site Plan and Architectural Review standards stated in IZO Section 24.010, as follows: a. The project will utilize materials that are appropriate for the Queen Anne style residence including a composition horizontal and patterned siding and wood shingle composite material in an "aged cedar" finish. As such, the project proposes quality materials that will provide harmony and proportion of the overall design and finds that the project satisfies IZO Section 24.010(G)(1)(a). b. The project proposes alterations to an existing Queen Anne style residence which is one of the inventoried styles listed in the OakhilI-Brewster Historic District Guidelines. As such, the architectural style is compatible with the overall character of the neighborhood and finds that the project satisfies IZO Section 24.010(G)(1)(b). c. The project proposes a new attached garage in-line with the existing setback, located under the existing bay window, and does not modify the existing setback, finding that the project satisfies IZO Section 24.010(G)(1)(c). d. As a residential use, the project does not propose new signage and as such this finding is not applicable. e. The new rear roof gable is proposed to match the existing front roof gable in height, slope, and material, typical of the Queen Anne architectural style. Residences within the immediate neighborhood include gable, hip, and shed roof forms across a variety of architectural styles including the adjacent Craftsman and Queen Ann architectural style.The project proposes colors that are consistent with the original Queen Anne style of the residence and are modest, cohesive to the residence and the surrounding structures, and are appropriate to the late nineteenth century period. The proposed project's rear roof gable height and colors finds that the project satisfies IZO Section 24.010(G)(1)(e). f. The project proposes plantings that include primarily shrubs and groundcovers in the front yard on either side of the new driveway that are in keeping with the simplistic architectural design of the new residence as well as other landscaped front yards in the immediate neighborhood, consistent with this finding and finds that the project satisfies IZO Section 24.010(G)(2). g. The project will utilize the existing street network to access the site from Liberty Street, including a new driveway apron. Consistent with COA #16, the project will include an area at the rear of the lot to be dedicated as a Public Access Easement consistent with the District Guidelines. In addition to vehicular access, the project will also utilize the existing bicycle and pedestrian network. Therefore, the project is designed to promote safety and convenience consistent with City standards and finds that project satisfies IZO Section 24.010(G)(3). C. Based on its review of the entire record herein,including the April 12,2022 Historic and Cultural Preservation Committee staff report, all supporting, referenced,and incorporated documents and all comments received, the Historic and Cultural Preservation Committee hereby approves Historic Site Plan and Architectural Review for the Project, subject to the conditions Historic&Cultural Preservation Committee Resolution No.2022-02 Page 6 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 of approval attached hereto as Exhibit A. ADOPTED this 12th day of April 2022, by the following vote: Commission Member Aye No Absent Abstain/Recused Chair Caputo X Perlis X Pitingaro X Rinehart X van Ommeren X EDocuSigned by: Uc�,visfgLtr C y46, OA.4ur �SlG���F�n��nno Christopher Caputo, Chair ATTEST: APPROVED AS TO FORM: � ocuSigned by: DocuSigned by: E�D Rivxs, lln ,vtw� � �In,cfer �Lm& f y#J. , Qssisfain�DFSA4F319E4F7... Heather Hines, Interim CD Director Dylan Brady, Assistant City Attorney Historic&Cultural Preservation Committee Resolution No.2022-02 Page 7 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 Exhibit A CONDITIONS OF APPROVAL Eames Residence 235 Liberty Street APN: 006-273-015 File No: PLSR-2021-0025 Planning Division Standard Conditions of Approval 1. The plans submitted for building permit review shall be in substantial conformance with plans on file with the Planning Division and dated December 26, 2021, except as may be modified by the following conditions.A determination of substantial conformance shall be made by the Planning Manager in writing during the plan check review process. Nothing shall preclude the Planning Manager from referring a substantial conformance determination to the Historic and Cultural Preservation Committee for review at a publicly noticed meeting. 2. The colors, materials, and landscaping shall be in substantial conformance with those noted on the plan set except as modified by these conditions of approval. 3. The day following approval, the applicant shall provide a check made payable to the Sonoma County Clerk, in the amount required and published by the Sonoma County Clerk to file the CEQA Notice of Exemption ("NOE"). 4. Prior to the issuance of any construction permits, these conditions of approval shall be included with the plan set.A copy of the approved plans shall be maintained on-site when construction activities are occurring. 5. This approval is granted for and contingent upon construction of the project as a whole, in a single phase, with the construction and/or installation of all features approved and required herein. Modifications to the project, including but not limited to a major change in construction phasing, may require an amendment to this condition by the Historic and Cultural Preservation Committee through the Site Plan and Architectural Review provided at IZO Section 24.010. 6. Consistent with IZO Section 24.010(I), this approval is effective for a twelve (12) month period unless the permit has been exercised or unless an extension of time is approved in compliance with IZO Section 24.010(J). 7. Prior to building permit issuance, all development impact fees shall be paid in full prior to final inspection or issuance of a certificate of occupancy.The applicant/developer has 90 days from the date of this approval to protest the imposition of fees pursuant to Government Code Section 66020. A protest of the imposition of fees shall be considered by the City Council at a public hearing within 90 days after its filing, and the decision of the City Council shall be final. 8. The site shall be kept cleared at all times of garbage and debris. No outdoor storage shall be permitted other than typical bulk materials, i.e., lumber, appliances, window systems, etc., temporarily stored through the normal course of construction. 9. Construction activities shall comply with performance standards specified in IZO Chapter 21 (Performance Standards), except that the permitted construction hours shall be as follows: Historic&Cultural Preservation Committee Resolution No.2022-02 Page 8 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 a. Monday through Friday: 8 a.m. to 6 p.m. b. Saturday: 9:00 a.m. to 5:00 p.m. c. Prohibited on Sundays and all holidays recognized by the City of Petaluma. 10. Construction activities shall comply with the following measures, and all shall be noted on construction documents: a. Construction Hours/Scheduling: As noted above. b. Construction Equipment Mufflers and Maintenance: All construction equipment powered by internal combustion engines shall be properly muffled and maintained. c. Idling Prohibitions: All equipment and vehicles shall be turned off when not in use. Unnecessary idling of internal combustion engines is prohibited. d. Equipment Location and Shielding: All stationary noise-generating construction equipment, such as air compressors, shall be located as far as practical from the adjacent homes. Acoustically shield such equipment when it must be located near adjacent residences. e. Quiet Equipment Selection: Select quiet construction equipment, particularly air compressors, whenever possible. Motorized equipment shall be outfitted with proper mufflers in good working order. f. Staging and Equipment Storage: The equipment storage location shall be sited as far as possible from nearby sensitive receptors. g. Generators: No generators shall be utilized during nighttime hours (i.e., sunrise to sunset) to power equipment (e.g., security surveillance) when normal construction activities have ceased for the day.All such equipment should be powered through temporary electrical service lines. 11. Prior to commencing construction activities, a sign shall be posted on the site regarding the allowable hours of construction and contact information for complaints. Proof of sign installation shall be provided to the Planning Manager prior to construction commencing. 12. On September 13, 2021, the City of Petaluma entered Stage 4 of the Water Shortage Contingency Plan,designed to reduce water usage through mandatory restrictions. Under this stage, a moratorium on installation of new landscapes or replanting of existing landscapes that require water is now in effect. So long as a moratorium on new and replanted landscapes that require water remains in effect, installing new landscapes or replanting existing landscapes that require water are prohibited, except for the installation of stormwater treatment features and bioswales. If water is needed to establish the stormwater treatment features and/or bioswales, watering must comply with the city watering schedule in effect. If a project is complete except for installation of required landscape that requires water, a landscaping deposit must be filed with the Planning Division prior to a final inspection or certificate of occupancy. The landscape deposit shall be equal to 150% of the cost of installation of the approved landscaping, including both the cost and installation of the landscaping as demonstrated by a bid or proposal. The approved landscaping shall be installed within three months of the removal of the moratorium on new and replanted landscapes, unless an alternative date is approved by the Planning Manager based on limitations such as plant availability or installation scheduling. The landscape deposit will Historic&Cultural Preservation Committee Resolution No.2022-02 Page 9 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 be released to the applicant upon verification that landscaping has been installed consistent with all approvals. 13. All plantings shall be maintained in good growing condition. Such maintenance shall include, where appropriate, pruning, mowing, weeding, cleaning of debris and trash, fertilizing and regular watering.Whenever necessary, planting shall be replaced with other plant materials to ensure continued compliance with applicable landscaping requirements. Required irrigation systems shall be fully maintained in sound operating condition with heads periodically cleaned and replaced when missing to insure continued regular watering of landscape areas, and health and vitality of landscape materials. 14. The applicant shall defend, indemnify, and hold harmless the City or any of its boards, commissions, agents, officers, and employees from any claim, action, or proceeding against the City, its boards, commissions, agents, officers, or employees to attack, set aside, void, or annul any of the approvals of the project, when such claim or action is brought within the time period provided for in applicable State and/or local statutes. The City shall promptly notify the applicants/developers of any such claim, action, or proceeding. The City shall coordinate in the defense. Nothing contained in this condition shall prohibit the City from participating in a defense of any claim, action, or proceeding and if the City chooses to do so appellant shall reimburse City for attorneys' fees by the City. Planning Division Project-Specific Conditions of Approval 15. No more than one-third of the front yard, or 200 square feet, whichever is greater should be hard-surfaced. The final measurements shall be provided to staff for final review. 16. Prior to issuance of a certificate of occupancy, the applicant shall provide proof of recordation of a five-foot wide Public Access Easement along the Pepper School Alley frontage as shown on Sheet Al.1 of the approved SPAR plans. 17. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible is taken to avoid damage to the historic materials. 18. The project is required to comply with measures to protect and preserve significant archeological resources if potentially significant prehistoric or historic archeological resources are encountered during the course of ground disturbing activities. As such, the project is consistent with this standard. 19. An encroachment permit shall be completed prior to the installation of the carriage stop feature. Building Division 20. Proposed project will require building permit application and construction plan approval in compliance with current California Building Standards Code in CCR Title 24 as adopted by the City of Petaluma. The Building Division reviews applications and plans in accordance with this code. The applicant will need to demonstrate compliance with the construction documents. 21. Any proposed changes to the existing building, electrical, mechanical and plumbing systems will require building permit for compliance with current California Building Standards Code in CCR Title 24. The Building Division reviews applications and plans in Historic&Cultural Preservation Committee Resolution No.2022-02 Page 10 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 accordance with this code. The applicant will need to demonstrate compliance. 22. Existing permit BLDG-17-1276 for foundation replacement has expired. This project proposes to modify this plan with the garage door opening. Plans demonstrating code compliance will be required with a new permit application. Two open permits for a new pool (POOLR-2021-0006) and window repairs (BLDG-21-0979) are issued. 23. Permit application is to be made to the City Building Division of the Planning Department. Permit applications will require plans, review and approvals. See: Electronic Plan Submittal Requirements- Petaluma (cityofpetaluma.org) Submitted plan sheets are to be combined into one plan set. Here is our new Permit hub for permit applications: https://cityofpetaluma.org/permits/ 24. Separate or combined permit application and plans is required for the proposed exterior roof,wall and porch work. Proposed scope is not entirely clear as proposed, elevations for West and North sides of the existing building are not provided. 25. New roof materials are required to be Class A per City municipal code 17.04.020. Class A roof assemblies and roof coverings required to be listed by this section shall be tested in accordance with ASTM E108 or UL 790. In addition, fire-retardant-treated wood roof coverings shall be tested in accordance with ASTM D2898. 26. Sheet A1.1 indicates work in the public right of way and will require a separate encroachment permit from public works. 27. New and altered retaining walls proposed will require separate or combined permit application and approval. Retaining wall plans and construction details will be reviewed to CBC compliance. 28. Garage/ Basement level is shown to be same level as the street (78.1 ft) indicating susceptibility of storm water intrusion. Plans must indicate storm water management and best management practices for soil erosion. Storm water interceptor drain inlet and drain piping will be required at building foundation and garage entry. 29. Existing detached garage is not shown on plot plan A1.0 and is located approximately where new pool is proposed as shown on Sheet Al.I. If demolition is desired, a separate permit application and plans are required. A permit from the Bay Area Air Quality Management District (https://www.baagmd.gov/permits/asbestos ) is required as a condition of permit approval. Fire Department 30. The plans do not provide sufficient information to determine if the project meets the definition of a substantial remodel. A complete review of the work to be completed for the addition and interior remodel will be performed at Building permit submittal. If the project meets the definition of a substantial remodel, installation of an automatic fire sprinkler system in accordance with NFPA 13D shall be installed. Installation of the fire sprinkler system requires approved plans and permit from the Fire Prevention Bureau prior to work commencing. The owner/contractor shall submit a permit application with plans, cut sheets, and calculations. This system must comply with NFPA 13D. 31. Substantial Improvement. Any repair, reconstruction, rehabilitation, alteration, addition or other improvement of a building or structure that is any of the following: (3) An existing Historic&Cultural Preservation Committee Resolution No.2022-02 Page 11 DocuSign Envelope ID:C1CD2B42-AE99-47CD-95A4-CCC74BOB43C7 building or structure that undergoes any combination of repair, reconstruction, rehabilitation, alteration, addition or other improvement to floor area of the building or structure that is equal to or exceeds 50 percent of the existing gross floor area of the building or structure. 903.6 Where required in existing buildings and structures. An automatic sprinkler system shall be provided throughout existing buildings and structures where required in Chapter 11 and as required in this section.903.6.1 Buildings that undergo a substantial improvement. Historic&Cultural Preservation Committee Resolution No.2022-02 Page 12