HomeMy WebLinkAboutHCPC Resolution 2022-06 11/15/2022 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC RESOLUTION 2022-06 CITY OF PETALUMA HISTORIC AND CULTURAL PRESERVATION COMMITTEE APPROVING MAJOR HISTORIC SITE PLAN AND ARCHITECTURAL REVIEW FOR HAMPTON INN PETALUMA (SILK MILL) EXPANSION LOCATED AT 409 WILSON STREET APN: 007-163-002 FILE NO: PLSR-2022-0005 WHEREAS, BPR Properties, requesting a Major Historic Site Plan and Architectural Review (HSPAR) for the proposed development of a two-story, 18-guest room, rear addition to the existing hotel located at 409 Wilson Street (APN 007-163-002), the Historic Petaluma Silk Mill, within the Mixed Use 2 (MU2) zoning district ("Project"); and WHEREAS, the Project, is located on a site listed on the National Register of Historic Places (NR#86000386) and the California Register of Historic Resources since 1986; and WHEREAS, the Project, given its location in the City of Petaluma with a historic overlay, is subject to review by the Historic and Cultural Preservation Committee consistent with Section 15.020 of Chapter 15 of the Petaluma Implementing Zoning Ordinance; and WHEREAS, the Secretary of Interior Standards for the Treatment of Historic Buildings provides guidance for new construction to ensure that the characteristics which justify the designation of the site are maintained; and WHEREAS, with the exception of the historic buildings which will be retained, no other historic era features are onsite; and WHEREAS, on November 15, 2022, the Historic and Cultural Preservation Committee held a duly noticed public hearing to consider the application, at which time all persons interested had the opportunity to be heard; and WHEREAS, on November 15, 2022, the Historic and Cultural Preservation Committee considered a staff report analyzing the application, including the California Environmental Quality Act ("CEQA") determination included therein; and WHEREAS, a public notice of a neighborhood public meeting scheduled for November 3, 2022, 6:00pm, was mailed on October 24, 2022 to residents and occupants within 1,000 feet of the Project site is in compliance with state and local law; and WHEREAS, a neighborhood public meeting was held on November 3, 2022, 6:00pm, and the Project was presented by the Applicant team, is in compliance with state and local law; and WHEREAS, a public notice of the Historic and Cultural Preservation Committee hearing was published in the Petaluma Argus-Courier on November 4, 2022 and mailed to residents and occupants within 1,000 feet of the Project site is in compliance with state and local law. Historic&Cultural Preservation Committee Resolution No.2022-06 Page 1 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC NOW THEREFORE, BE IT RESOLVED THAT: A. The foregoing recitals are true and correct and incorporated herein by reference. B. Based on the staff report, staff presentation, comments received and the public hearing, the Historic and Cultural Preservation Committee makes the following findings based on substantial evidence in the record: California Environmental Quality Act 1. The proposed Hampton Inn Petaluma Expansion project is exempt from environmental review under CEQA pursuant to the following exemptions: CEQA Guidelines Section 15331 (Class 31 - Historical Resource Restoration/Rehabilitation), which, includes modifications to historic structures that are consistent with the Secretary of the Interior's Standards for Rehabilitation; CEQA Guidelines Section 15303 (Class 3 - New Construction or Conversion of Small Structures) which consists of construction and location of limited numbers of new, small facilities or structures including a motel or similar structure in an urbanized area not exceeding 10,000 square feet in floor area on a site zoned for such use as long as the project does not involve the use of significant amounts of hazardous substances and where all necessary public services and facilities are available and the surrounding area is not environmentally sensitive. CEQA Guidelines Section 15332 (Class 32 - In-fill Development Project) as the expansion is consistent with the applicable general plan designation and policies and with applicable zoning designation, the expansion occurs within City limits on a project site of no more than five acres and is surrounded by urban uses, the expansion is occurring on the existing lot which means it is not an environmentally sensitive area, the site can be adequately served by the required utilities and public services, and due to its size and location next to SMART and Lakeville Highway the expansion won't result in any significant effects relating to traffic, noise,air quality, or water quality. Petaluma General Plan 2. The Project is consistent with the site's Land Use Map designation Mixed Use 2 (MU2) in that a Major HSPAR application for exterior alterations to a historic structure was submitted on January 26,2022, as required, which would result in a rear addition to the historic site. 3. The project is, for the reasons contained in the November 15, 2022, Historic and Cultural Preservation Committee staff report, consistent with the following General Plan policies: Policy 1-P-13 Maintain Downtown as the City's geographic and symbolic center and a focus of commercial and cultural activities. Policy 3-P-1 Protect historic and archaeological resources for the aesthetic, cultural, educational, environmental, economic, and scientific contribution they make to maintaining and enhancing Petaluma's character, identity and quality of life. Implementing Zoning Ordinance 4. The Project is consistent with the site's Land Use Map designation Mixed Use 2 (MU2) in that a Major HSPAR application for exterior alterations to a historic structure was submitted on January 26, 2022, as required,which would result in a rear addition to the historic site.The proposed project is subject to the objective development standards contained in Table 4.3 of the IZO.The property continues to be consistent with development standards including setbacks, height, and lot coverage with conditions noted in Draft Resolution (Exhibit A). 5. The project would be consistent with Chapter 11 (Parking and Loading Facilities, Off-Street) pursuant to the proposed Zoning Text Amendment of the Implementing Zoning Ordinance, Ordinance 2300 N.C.S, Chapter 1 1 (Parking and Loading Facilities, Off-street) (refer to Attachment Historic&Cultural Preservation Committee Resolution No.2022-06 Page 2 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC A, Exhibit 2). 6. The project is consistent with Chapter 15 (Preservation of the Cultural and Historic Environment), in that it has been reviewed by the HCPC in accordance with the requirements contained in Section 15.070 of the IZO, and it has been determined that the proposed alterations will not adversely affect the character, or the historical, architectural, or aesthetic interest or value of the district. 7. The project is consistent with Chapter 17 (Tree Preservation), in that it has been reviewed by the HCPC in accordance with the requirements contained in Section 17.050 of the IZO, recognizing the desirability of preserving the Canary Island palm tree to the greatest extent possible with an application of a Landmark Tree Designation nomination. 8. The project is consistent with Chapter 18 (Public Art), in that Condition 18 requires the project to comply with Chapter 18 of the IZO, which requires a 1% public art requirement for all non- residential development with a budget greater than $500,000. 9. The Project is consistent with the Major Historic Site Plan and Architectural Review standards stated in IZO Chapter 24 (Site Plan and Architectural Review) Section 24.050, as follows: a. The project proposes a rear expansion to the former silk mill in a contemporary architectural style. As such, the architectural style is compatible with the overall character of the site and its neighborhood and finds that the project satisfies IZO Section 24.050(E)(1)(a). b. The project does not alter the siting of the existing historic buildings on the property and therefore continues to be appropriate for the site and other buildings in the neighborhood. The rear expansion is new construction and does not physically connect to the historic building other than by a new second-floor exterior landing. As such, the sitting of the existing historic structure on the property are not altered, and finds that the project satisfies IZO Section 24.050(E)(1)(b). c. Since the building continues to be of hotel use, there are no proposed signage or outdoor advertising structures proposed for the site. As such, finds that the project satisfies IZO Section 24.050(E)(1)(c). d. The project includes new construction of a two-story building in the rear of the property and mimics the maximum height, gable roof, and window style of the adjacent, former Engine room, supporting a bulk, height, and color appropriate for the site and compared to other structures in the neighborhood. As such, finds that the project satisfies IZO Section 24.050(E)(1)(d). Secretary of the Interior's Standards for the Treatment of Historic Properties 10. The Project is consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties for Rehabilitation, as follows: a. Standard#1:The building and site were historically designed and built to support a functioning silk mill. As the building was rehabilitated from an industrial building into a hotel between 2016 and 2018, the building and site were preserved without the loss of its character, integrity, or defining architectural features. The proposed rear expansion, with the new building and courtyard supports the continuous use of the site as a hotel and does not impose a new use. The new guestrooms would allocate additional guest reservations for the Hampton Inn Hotel and the courtyard would be facilitated as an outdoor amenity space. As such, the project is consistent with this standard. b. Standard #2: The project does not propose the removal of historic materials or alterations of features to the historic silk mill buildings. It does however modify the existing outdoor space to support new hotel guestrooms and a courtyard. The retention of an outdoor space and preservation of the existing Canary Island palm tree demonstrates a positive development and efficient use of the site without compromising the site's overall historic character. As such, Historic&Cultural Preservation Committee Resolution No.2022-06 Page 3 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC the project is consistent with this standard. c. Standard #3: The project does not create a false sense of historic development, does not add conjectural features or architectural elements from other buildings, nor does it reuse materials from the existing buildings. The project proposes a contemporary design which distinguishes the rear expansion as the most recent addition to the site, demonstrating the current age, materials, and construction technology. Its design and use of materials records the site's development as its own time, place, and use. Most importantly, the design is compatible to the site and existing building since it assimilates roof styles and composition while introducing distinguishable architectural materials and features, such as concrete base, metal standing seam, metal louvers, spandrel and shopfront glazing, and a metal exterior landing. One architectural material which creates for a bold appearance is the use of metal standing seam as the building's exterior envelope. The design currently proposes this material as the exterior surface for its roofing and fapades. The use of these material supports a contemporary design which distinguishes itself from the site's historic buildings. As such, the project is consistent with this standard. d. Standard #4: The site currently exhibits buildings that have changed over time which have supported the rehabilitation of a functioning silk mill to the Hampton Inn Petaluma hotel. This project provides for a rear expansion to facilitate additional guestrooms and an outdoor space for the hotel. The project's scope does not physically alter or impact the existing buildings nor their historic significance. As such, the project is consistent with this standard. e. Standard #5: The project's scope of work is limited to the existing outdoor area and does not propose work on the existing buildings within the site. Therefore, the project does not remove or alter existing distinctive features, finished, nor construction techniques of craftsmanship of the existing buildings. The Canary Island palm tree may be considered a distinctive feature which the project proposes to preserve and designate as a Landmark Tree. As such, the project is consistent with this standard. f. Standard #6: The rear expansion is new construction and does not physically connect to the historic building other than by a new second-floor exterior landing.The architectural drawings and application materials do not indicate scope of work that applies to repairing deteriorated historic features nor is there an indication to replace distinctive features. As such, the project is consistent with this standard. g. Standard #7: The project description and its architectural drawing set does not indicate the use of chemical or physical treatments as the project proposes new construction for the rear expansion which does not physically connect to the historic building other than by a new second-floor exterior landing. Draft HSPAR resolution Condition 13 requires that chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible is taken to avoid damage to the historic materials. Appropriate physical treatments may also be applicable to the preservation of the site's existing landscape features and plantings. Since the project incorporates the preservation and landmark tree designation of the existing Canary Island palm tree, draft HSPAR resolution Condition 14 requires that a tree protection plan is established for this project to guide, assist, and support a healthy tree during all stages of construction. The Arborist report included a variety of recommendations to consider and may be included as part of tree protection plan. With the incorporation of draft HSPAR resolution Conditions 13 and 14, the project would be consistent with this standard. h. Standard #8: Excavation is limited to the project site area around the existing canary palm. The site has already experienced ground disturbance during the development of the silk mill, its later expansions, and with the rehabilitation into a hotel. Work of undisturbed ground is not a part of this project, and a condition is included as a preventative measure to protect and preserve significant archeological resources if potentially significant prehistoric or historic Historic&Cultural Preservation Committee Resolution No.2022-06 Page 4 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC archeological resources are encountered during the course of ground-disturbing activities (see draft HSPAR resolution Condition 15). As such, the project is consistent with this standard. i. Standard #9: The Secretary of the Interiors for the Treatment of Historic Buildings guidelines for rehabilitation recommends that an addition is subordinate and secondary to the historic building and is compatible in massing,scale, materials,relationship of solids to voids,and color. The proposed rear expansion is located in the rear and north edge of the property and is lower than historic silk mill building. The proposed design illustrates it is secondary to the historic building and does not overshadow, detract, nor negatively impact the historic buildings within the site. The new building's maximum height is set to match the height of the adjacent building, the former Engine room. It also incorporates a similar gable roof and window style. The proposed rear expansion's design is a contemporary design which encircles and accentuates the existing Canary Island palm tree. Its massing and size are also similar to the former Engine room. As previously mentioned within this staff report, the design incorporates architectural materials and features such as a concrete base, metal standing seam, metal louvers, spandrel and shopfront glazing, and a metal exterior landing,which differentiates the new construction from the historic buildings. Two architectural features that may benefit from further design development are the mechanical well's spandrel glass and the vestibule's metal louvered parapet. It is recommended to include a condition to reassess an appropriate perimeter for the mechanical well which suits the roof plan and that the vestibule's metal louvered parapet is reduced in height through administrative review (see draft HSPAR resolution Condition 19).The project is consistent with this standard and with the incorporation of the recommended condition, would further strengthen an architecturally cohesive design for the new building. j. Standard #10: As noted in the previous sections, the rear expansion is new construction and does not physically connect to the historic building other than by a new second-floor exterior landing. The rear expansion's building and courtyard has been designed to preserve the existing canary island palm tree with the intention of developing the site with long-term use for hotel guests. The rear expansion may be removed in the future without affecting the essential form and integrity of the historic property and its environment.As such,the project is consistent with this standard. C. Based on its review of the entire record herein, including the November 15, 2022 Historic and Cultural Preservation Committee staff report, all supporting, referenced, and incorporated documents and all comments received, the Historic and Cultural Preservation Committee hereby approves Historic Site Plan and Architectural Review for the Project, subject to the conditions of approval attached hereto as Exhibit 1. Historic&Cultural Preservation Committee Resolution No.2022-06 Page 5 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC ADOPTED this 15th day of November 2022, by the following vote: Commission Member Aye No Absent Abstain/Recused Rinehart X Perlis X Pitingaro X van Ommeren X Whitley X DocuSigned by, F76255FABB4B4CA... Bill Rinehart, Chair ATTEST: APPROVED AS TO FORM: DocuSigned by: DocuSigned by: I 1 1 1 LEv l��. & f v#,Jl.l , Qssis aln.l b� gff bn U E468369CBEDF404_.. 2586C556ED25412.. Andrew Trippel, Planning Manager Dylan Brady, Assistant City Attorney Historic&Cultural Preservation Committee Resolution No.2022-06 Page 6 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC Exhibit 1 CONDITIONS OF APPROVAL Hampton Inn Petaluma (Silk Mill) Expansion 409 Wilson Street APN: 007-163-002 File No: PLSR-2022-0005 Standard Conditions of Approval Planning Division 1. The plans submitted for building permit review shall be in substantial conformance with plans on file with the Planning Division, dated March 18, 2022 and revision submitted on October 17, 2022, except as may be modified by the following conditions. A determination of substantial conformance shall be made by the Planning Manager in writing during the plan check review process. Nothing shall preclude the Planning Manager from referring a substantial conformance determination to the Historic and Cultural Preservation Committee for review at a publicly noticed meeting. 2. The colors and materials shall be in substantial conformance with those noted on the plan set except as modified by these conditions of approval. 3. The day following approval, the applicant shall provide a check made payable to the Sonoma County Clerk, in the amount required and published by the Sonoma County Clerk to file the CEQA Notice of Exemption ("NOE"). 4. Prior to the issuance of any construction permits, these conditions of approval shall be included with the plan set. A copy of the approved plans shall be maintained on-site when construction activities are occurring. 5. This approval is granted for and contingent upon construction of the project as a whole,in a single phase, with the construction and/or installation of all features approved and required herein. Modifications to the project, including but not limited to a major change in construction phasing, may require an amendment to this condition by the Historic and Cultural Preservation Committee through the Site Plan and Architectural Review provided at IZO Section 24.050. 6. Consistent with IZO Section 24.050(I),this approval is effective for a twelve (12) month period unless the permit has been exercised or unless an extension of time is approved in compliance with IZO Section 24.050(J). 7. Prior to building permit issuance, all development impact fees shall be paid in full prior to final inspection or issuance of a certificate of occupancy. The applicant/developer has 90 days from the date of this approval to protest the imposition of fees pursuant to Government Code Section 66020. A protest of the imposition of fees shall be considered by the City Council at a public hearing within 90 days after its filing, and the decision of the City Council shall be final. 8. The site shall be kept cleared at all times of garbage and debris. No outdoor storage shall be permitted other than typical bulk materials, i.e., lumber, appliances, window systems, etc., temporarily stored through the normal course of construction. 9. Construction activities shall comply with performance standards specified in IZO Chapter 21 (Performance Standards), except that the permitted construction hours shall be as follows: a. Monday through Friday: 8 a.m. to 6 p.m. b. Saturday: 9:00 a.m. to 5:00 p.m. Historic&Cultural Preservation Committee Resolution No.2022-06 Page 7 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC c. Prohibited on Sundays and all holidays recognized by the City of Petaluma. 10. Construction activities shall comply with the following measures, and all shall be noted on construction documents: a. Construction Hours/Scheduling: As noted above. b. Construction Equipment Mufflers and Maintenance: All construction equipment powered by internal combustion engines shall be properly muffled and maintained. c. Idling Prohibitions: All equipment and vehicles shall be turned off when not in use. Unnecessary idling of internal combustion engines is prohibited. d. Equipment Location and Shielding: All stationary noise-generating construction equipment,such as air compressors,shall be located as far as practical from the adjacent homes. Acoustically shield such equipment when it must be located near adjacent residences. e. Quiet Equipment Selection: Select quiet construction equipment, particularly air compressors, whenever possible. Motorized equipment shall be outfitted with proper mufflers in good working order. f. Staging and Equipment Storage: The equipment storage location shall be sited as far as possible from nearby sensitive receptors. g. Generators: No generators shall be utilized during nighttime hours (i.e., sunrise to sunset) to power equipment (e.g., security surveillance) when normal construction activities have ceased for the day. All such equipment should be powered through temporary electrical service lines. 11. Prior to commencing construction activities, a sign shall be posted on the site regarding the allowable hours of construction and contact information for complaints. Proof of sign installation shall be provided to the Planning Manager prior to construction commencing. 12. The applicant shall defend, indemnify, and hold harmless the City or any of its boards, commissions, agents, officers, and employees from any claim, action, or proceeding against the City,its boards, commissions,agents, officers, or employees to attack, set aside,void,or annul any of the approvals of the project, when such claim or action is brought within the time period provided for in applicable State and/or local statutes. The City shall promptly notify the applicants/developers of any such claim, action, or proceeding. The City shall coordinate in the defense. Nothing contained in this condition shall prohibit the City from participating in a defense of any claim, action, or proceeding and if the City chooses to do so appellant shall reimburse City for attorneys' fees by the City. Project-Specific Conditions of Approval Planning Division 13. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible is taken to avoid damage to the historic materials. 14. A tree protection plan for the existing Canary Island palm tree shall be established to guide, assist, and support a healthy tree during all stages of construction for this project. 15. The project is required to comply with measures to protect and preserve significant archeological resources if potentially significant prehistoric or historic archeological resources are encountered during the course of ground disturbing activities. 16. Administrative review shall be completed for future lighting fixtures following the Secretary of the Interior's Standards for the Treatment of Historic Buildings. Historic&Cultural Preservation Committee Resolution No.2022-06 Page 8 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC 17. Administrative review shall be completed for future minor landscape and hardscape work following the City's water restriction and landscape moratorium. 18. The project shall comply with Chapter 18 of the IZO, which requires a 1% public art requirement for all non-residential development with a budget greater than $500,000. 19. An appropriate perimeter for the mechanical well which suits the roof plan and that the vestibule's metal louvered parapet is reduced in height shall be reassessed and reviewed through administrative review to further strengthen an architecturally cohesive design for the new building. 20. The project requires City Council's adoption of the Zoning Text Amendment to Chapter 11 of the IZO (Attachment A, Exhibit 1). 21. Approval of a 19 percent reduction in minimum required parking from 95 spaces to 77 spaces as shown on the approved Site Plan is granted as sufficient to provide adequate parking capacity for the project based on the following required findings: a. A parking demand analysis, provided by the Applicant, demonstrates that the proposed use will generate parking demand different from the standards specified in Table 11.1 due to one or more of the following factors, in that the applicant submitted the document entitled Parking Study for Hampton Inn Hotel Expansion at the Historic Silk Mill, prepared by Advanced Mobility Group's Christopher Thnay, PE, AICP, and Shruti Shrivastava, dated May 18, 2022. The project analyzed in the study includes "the addition of 20 new guest rooms which will add to the existing 75 guest rooms resulting in 95 total number of guest rooms. Currently there are 77 parking spaces." Planning staff have reviewed and accepted this parking study (Attachment 1). i. Adequate off-site parking availability is demonstrated in that the results of the parking demand analysis are based on the City of Petaluma Municipal Code estimated the need of 96 spaces for the 95 total number of guest rooms at the project site. Many agencies use average parking demand rate as the likely peak parking demand for a land use. AMG used 110% of ITE average rate - with additional 10 % being a safety factor against unexpected parking surges. Results of the parking demand analysis based on 110% ITE average parking rates estimated that 75 spaces would be required. Therefore, the parking spaces provided by the proposed project meets the estimated parking demand.The 85th percentile parking rate provides a more conservative estimate of parking spaces required. Based on AMG's 85th percentile parking rate analysis, 79 spaces would be required. In this scenario, the parking spaces provided by the proposed project would be short by two (2) spaces, given that currently the project site has 77 parking spaces. However, other factors such as proximity to the nearby SMART Downtown Station and ridehailing also reduce demand for off-site parking as not all people utilizing the hotel would be dependent on single-occupancy vehicles. ii. Underutilization of existing on-site parking as a result of specific land use characteristics is demonstrated in that the study reports that the City's minimum parking requirement assumes an estimated 100% occupancy, which is usually not the case for suburban hotels. The U.S. national average is 66.2 % occupancy. Additionally, the existing Hampton Inn Hotel at the Historic Silk Mill does not contain any conference facility or restaurant for outside visitors, and none would be added as part of the proposed project. While the hotel facility is open to the public, the primary user is hotel guests. The parking study incorporates these unique characteristics into its analysis and concludes that sufficient parking is available for the expanded operation of the hotel. iii. Access to alternative transportation modes, including proximity to public transit exists in that the hotel is located within 1/4-mile of the SMART Downtown Station, Historic&Cultural Preservation Committee Resolution No.2022-06 Page 9 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC and the site is served by Petaluma Transit Route 24, as well as being fully bicycle and pedestrian accessible. Hotel guests and employees have access to all alternative transportation modes. The location of the project site provides opportunities for daytime employees (eight) to take transit, bike or walk to work. Since the site is approximately 0.2 miles (4-5-minute walk) from the Petaluma Station, it is anticipated that some of the hotel workers might be able to use transit instead of driving to work. iv. Access to and use of alternative transportation programs (such as bike-share, carshare, electric bikes, electric scooters, or local crosstown connector service) is available in that the parking study notes that several studies have shown that ride- hailing companies, like Uber and Lyft, are changing transportation habits and are having a significant impact on parking demand for many land uses. The largest impacts of ride-hailing services to parking are occurring at hotels, restaurants, events centers, and airports where the demand for ridehailing is the greatest. The study concludes that ridehailing is a viable alternative transportation option for this hotel facility and that it can be anticipated to reduce demand for parking. The hotel will also be providing E-bike rentals and EV parking stalls on-site. This will support the City's goal of being carbon neutral by 2030 (Climate Ready 2030). b. The number of parking spaces approved will be sufficient for the safe, convenient, and efficient operation of the use in that based upon the results of the parking demand analysis, Planning staff conclude that the proposed 77 parking spaces as described on the site plan are sufficient to meet demand for the expanded 93-room hotel in that hotel occupancy typically does not achieve 100%, which is what the parking requirement is based upon,the hotel is accessible by multiple alternative transportation options including train, bus, and ridehailing, all of which would reduce demand for parking, and that research indicates that hotel uses are increasingly relying upon ridehailing for transportation. Additionally, the hotel will be providing e-bikes to facilitate movement of guests in the local area. c. Overall project characteristics, such as location, access to alternative transportation modes, and incorporation of alternate transportation programs, support reduced onsite parking and associated City goals, policies, and initiatives related to climate action, enhanced connectivity, economic vitality, and community character in that the proposed project site is located within '/2 mile of Downtown Petaluma and is within '/4 mile of high-quality public transit (SMART train) and adjacent to Petaluma Transit facilities. The project would include EV charging stations and it plans to offer e-bikes for use by hotel guests. These attributes support the City's climate action and enhanced connectivity goals and policies. The proposed expansion of the hotel facility would encourage and support increased tourism and business activity in Petaluma and create additional employment opportunities, both of which help achieve the City's economic vitality goals. The project proposes a unique, interesting design that intensifies use of the property while recognizing the iconic Canary Island palm tree. The project will enhance and enliven the immediate area while positively contributing to the character of the surrounding community. 22. The project shall be revised to include the following with Administrative review: a. Guest room window configurations to have true divided lites, pattern or proportion to be complimentary to existing. b. Adjust North elevation's East side's window location and spacing to resemble the existing buildings. c. Existing concrete adjacent to the new courtyard be removed and placed with pavers to match existing outdoor paving into the courtyard. d. Replace existing octagonal raised planter for the Canary Island palm tree and install new raised planter with seat wall into the new building's foundation. Historic&Cultural Preservation Committee Resolution No.2022-06 Page 10 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC e. Include understory planting below the Canary Island palm tree. f. Include a planter along the East foundation and allow vines to grow up the fapade. g. Include discrete signage at the exit of the site's parking lots stating parking for hotel is within the site only and no on-street parking adjacent of residential uses. Develop sign(s) to meet IZO requirements, the Secretary of the Interior Standards, and Public Work's direction and recommendations. 23. Within the property, review existing landscape conditions and elevate levels of maintenance, replace existing failed oak tree in West planter driveway with 36'' box to match, and restore trees where they have failed with Administrative review. 24. Restore ghost sign(s) on site. Building Division 25. Proposed project will require building permit application and construction plan approval in compliance with current California Building Standards Code in CCR Title 24 as adopted by the City of Petaluma. 26. Accessibility of Covered Multifamily Dwellings and Public Housing may have requirements under one or more regulations and agencies both State and Federal. Provide a clear statement of applicability of these regulations and CBC Chapter 11 A and 11 B for this project on construction documents submitted for permit. 27. Building permit construction documents are to include occupancy classifications, design occupant load, general building area and height limitations, type of construction, and fire sprinkler provisions data for each building on the subject parcel. 28. Verify building area proposed is within maximum allowable area for occupancy and construction type proposed. CBC Chapter 5. Public Works (Utilities, Environmental, Water Conservation & Landscaping) 29. All the public improvements shall be designed in accordance with the latest City of Petaluma Public Works and Utilities Department Standards & Specifications, latest edition of the Manual of Uniform Traffic Control Devices (MUTCD) and Caltrans standards. 30. The project shall comply with E.10 Construction Erosion and Sediment Control requirements: with the building permit application, applicant shall provide Notice of Intent documentation as well as the Storm Water Pollution Prevention Plan (SWPPP) and erosion and sediment control plan. 31. Refer to the City's website for current drought stage information, www.cityofpetaluma.org/drought. The applicant shall be responsible to follow all requirements during construction. These requirements include planting is only permitted between November 1 and April 30. High-water use turf is not allowed, and all irrigation must be in compliance with the current restricted watering schedule. 32. Encroachment permit is required for all work within the public right of way or within a City Utility Easement. 33. A separate permit is required from the fire department for the private fire line installation. 34. A construction level geotechnical report is required with Building permit. 35. Applicant responsible for coordinating and scheduling hot tap and paying necessary fees. 36. Refer to the City's website for current drought stage. The applicant shall be responsible to follow all requirement during construction. Historic&Cultural Preservation Committee Resolution No.2022-06 Page 11 DocuSign Envelope ID:AOBCA9AA-5210-46D3-B29A-OF5E2FCFFEDC 37. Aggregate landscape area. If aggregate landscape area is greater than 500 sf and less than 2,500 sf, please submit the following prescriptive measures of the City's landscape water use efficiency standards as defined in PMC 15.17.050(A)(4). 38. Prior to final inspection, the applicant shall submit the following in accordance with PMC Section 15.17.050. Please refer to the following sections of the PMC for detailed requirements of each item: a. PMC Section 15.17.050(C)(3): Soil Management Report. b. PMC Section 15.17.050(D)(1-3): Certificate of Completion to include the following attachments: 1. Certification by either the signer of the landscape design plan, the signer of the irrigation design plan, or the licensed landscape contractor that the landscape project has been installed per the approved landscape water use efficiency standards. 2. Irrigation Schedule -shall be regulated by automatic irrigation controllers, applied water should be the ETWU. 3. Landscape and Irrigation Maintenance Schedule - including routine inspection, adjustment and repair of irrigation system, fertilizing, pruning, weeding, etc. 4. Landscape Irrigation Audit conducted by a certified landscape irrigation auditor. Landscape audits shall not be conducted by the person who designed the landscape or installed the landscape. Audit reports shall meet the criteria listed in Section 15.70.050 (D)(2)(c) Environmental 39. The proposed Hampton Inn Petaluma Expansion project is exempt from environmental review under CEQA pursuant to the following exemptions: CEQA Guidelines Section 15331 (Class 31 - Historical Resource Restoration/ Rehabilitation), which, includes modifications to historic structures that are consistent with the Secretary of the Interior's Standards for Rehabilitation; CEQA Guidelines Section 15303 (Class 3 - New Construction or Conversion of Small Structures) which consists of construction and location of limited numbers of new, small facilities or structures including a motel or similar structure in an urbanized area not exceeding 10,000 square feet in floor area on a site zoned for such use as long as the project does not involve the use of significant amounts of hazardous substances and where all necessary public services and facilities are available and the surrounding area is not environmentally sensitive. CEQA Guidelines Section 15332 (Class 32 - In-fill Development Project) as the expansion is consistent with the applicable general plan designation and policies and with applicable zoning designation, the expansion occurs within City limits on a project site of no more than five acres and is surrounded by urban uses, the expansion is occurring on the existing lot which means it is not an environmentally sensitive area, the site can be adequately served by the required utilities and public services, and due to its size and location next to SMART and Lakeville Highway the expansion won't result in any significant effects relating to traffic, noise,air quality,or water quality. Historic&Cultural Preservation Committee Resolution No.2022-06 Page 12