RESOLUTION 2020-01
CITY OF PETALUMA
HISTORIC AND CULTURAL PRESERVATION COMMITTEE
APPROVING HISTORIC SITE PLAN AND ARCHITECTURAL REVIEW
FOR THE HAAS FAMILY RESIDENTIAL REMODEL
LOCATED AT 26 SIXTH STREET
APN: 008-045-025
FILE NO: PLSR-20-0003
WHEREAS, Bill Wolpert, on behalf of property owners Ginnie and Pete Haas, submitted an
application for Historic Site Plan and Architectural Review approval for exterior modifications at 26 Sixth
Street (APN 008-045-025) ("Project"); and
WHEREAS, on July 14, 2020, the Historic and Cultural Preservation Committee considered a staff
report analyzing the application, including the California Environmental Quality Act ("CEQA")
determination included therein; and
WHEREAS, on July 14, 2020 the Historic and Cultural Preservation Committee held a duly noticed
public hearing to consider the application, at which time all persons interested had the opportunity to be
heard; and,
WHEREAS, prior to adopting this resolution, public notice was published in the Argus Courier and
mailed to residents and occupants within 1,000 feet of the Project site, all in compliance with state and
local law; and
NOW THEREFORE, BE IT RESOLVED THAT:
A. The foregoing recitals are true and correct and incorporated herein by reference.
B. Based on the staff report, staff presentation, comments received and the public hearing, the Historic
and Cultural Preservation Committee makes the following findings based on substantial evidence in
the record:
California Environmental Quality Act
1 . The Project is categorically exempt from the California Environmental Quality Act (CEQA),
pursuant to CEQA Guidelines Section 15301 (Minor Alteration of Existing Facilities) as the project
involves the construction of accessory dwelling unit in a residential zone.
General Plan
2. The Project is consistent with the site's Land Use Map designation of Diverse Low Density Residential
since it would result in the site continuing to accommodate a residential land use.
3. General Plan Policy 1-P-3 states, "Preserve the overall scale and character of established
residential neighborhoods." The project would preserve the existing scale and character of the
neighborhood. The overall scale and character of the neighborhood consists of single-family
dwellings at one or two stories on individual lots. The project would retain its use as a single-family
dwelling, thereby reinforcing the residential character of the neighborhood.
Historic&Cultural Preservation Committee Resolution No.2020-01 Page 1
DocuSign Envelope ID: F9914019-D876-45C6-A7B9-90D2F358B389
4. Policy 3-P-1, states "Protect historic and archaeological resources for the aesthetic, cultural,
educational, environmental, economic, and scientific contribution they make to maintaining and
enhancing Petaluma's character, identity and quality of life." The project does not include any
modifications of the main residence. Per the Conditions of Approval, appropriate measures to
protect and preserve significant archeological resources will be taken in the event that potentially
significant prehistoric or historic archeological resources are encountered during the course of
ground-disturbing activities.
Implementing Zoning Ordinance
5. The Project is consistent with all R3 zoning district development standards, including but not limited
to, those concerning setbacks, building height, and lot coverage.
`A' Street Historic District Guidelines
1. Style. As discussed in the HIRE, the architectural style of the changes to the subject building are
largely consistent with existing style of the house and there are no new character defining
elements that would convey a different style. While there are some elements of the proposed
addition that are not reflective of the Transitional style, such as the wooden floor length windows
at the rear of the addition, these elements depict a modern element to the building and enable
the distinction of the addition from the historic structure.
2. Design.The proposed expansions to the subject property are consistent with the structure's original
design as they avoid eclectic assemblages of architectural motifs or artificial details to convey a
false sense of history and will retain defining elements of the building's Transitional style. Further,
the project focuses the area of greatest changes at the rear of the building where they are not
highly visible from the public right-of-way.
3. Arrangement. Although the proposal includes a substantial increase to the square-footage of the
existing building, the essential form of the modified building maintains its proportionality to the size
of the subject property. Additionally, the proposal complies with all height and setback
requirements within the R3 Zoning District, as well as the 'A' Street Historic District's guidelines
related to front and side yard setbacks, height, and the overall solid to void proportions of the
front fagade.
4. Texture and Materials. The proposal includes textures and materials appropriate for the subject
property. The front and side porch alterations will return the original wood materials that have
historically been found on structure. Additionally, the proposed rear addition will apply wood
siding consistent with the existing structure but will provide siding at a different width to facilitate
a differentiation between the existing and new structures.
5. Colors. The project proposes re-painting the existing building and new additions in their totality.
The chosen color palate features white as the primary color and uses black, teal, dark teal and
gold for accent treatments. This palate is appropriate for the neighborhood and the time period
of the original structure.
6. Accessory Fixtures. The project does not include any accessory fixtures. Nor does the proposal
include removal of fixtures.
7. Landscape. The landscaping elements included in the proposal relate to the excavation of the
driveway and supporting retaining walls. The concrete retaining walls will include a parged
treatment. No other landscaping elements are proposed. Additionally, the hardscaping of area
within the front yard is less than 200 square-feet.
Historic&Cultural Preservation Committee Resolution No.2020-01 Page 2
DocuSign Envelope ID: F9914019-D876-45C6-A7B9-90D2F358B389
Secretary of Interior's Standards and Guidelines
6. As conditioned, the Project is consistent with the Secretary of the Interior's Standards for
Rehabilitation and Guidelines for Rehabilitating Historic Buildings, as follows:
a. Standard #1: The historic use of the property as a residence is maintained.
b. Standard #2: The project retains much of the historic character of the subject property.
Although the project removes the rear dormer, an element believed to be part of the original
design, the addition enables modernization of the structure and complies with the guidelines
for the Secretary of Interior's Standards for Rehabilitation as they relate to new exterior
additions to historic buildings. The rear addition complies with the Standards as it applies the
same forms, materials, and colors of the historic building in a manner that does not duplicate
the existing resource; thereby effectively distinguishing the addition from the original building.
Additionally, the proposed addition is distinguished from the original structure because it is set
back from the wall planes of the historic building on both sides by one-foot, providing a
hyphen between the original and new massing.
c. Standard #3: The proposed project does not create a false sense of historical development.
The proposed addition is designed to be differentiated from the main house. Further the
restoration of the front and side entry stairs are based on the details found in the historic record
of the property.
d. Standard #4: Based on information in the record, there have been minor rear and side
additions to the house, most of which occurred outside of the period significance, 1865 to
1925,with the exception of the rear porch. While the HRE identifies the construction of the rear
porch as having occurred between 1910 and 1923, it also describes the porch as a common
minor feature that underwent subsequent alterations such that it does not retain its original
integrity. Therefore, its removal is not considered to be detrimental to the overall integrity of
the house.
e. Standard #5: The HIRE identifies the arched porch openings at the front and east side facades
as the most distinctive elements of the home. Additionally, the Department of Parks and
Recreation (DPR) form included in the HIRE lists the character defining features of the existing
structure that are emblematic of the Transitional style. With the exception of the rear dormer,
these elements of the property will be preserved.
f. Standard #6: The proposal includes restoration of the front and side porch stairs and railings to
wood, which was the original material used for these features.
g. Standard #7: No chemical or inappropriate physical treatments on the house will be
undertaken.
h. Standard #8: As conditioned, appropriate measures to protect and preserve significant
archeological resources will be taken in the event that potentially significant prehistoric or
historic archeological resources are encountered during the course of ground disturbing
activities.
i. Standard #9: As noted above the new addition complies the guidelines for the Standards
given that the proposed addition is distinct from and diminutive to the original structure.
Although the rear addition includes full-height fenestration elements, these features are not
visible from the public right-of-way, still maintain an appropriate solid to void ratio, enhance
the habitability of the existing residence, and further distinguish the addition from the historic
structure.
j. Standard #10: The proposed rear addition could be removed in the future and the essential
Historic&Cultural Preservation Committee Resolution No.2020-01 Page 3
DocuSign Envelope ID: F9914019-D876-45C6-A7B9-90D2F358B389
form and integrity of the property would remain unimpaired. Similarly, the exterior alterations
proposed to accommodate access to the excavated basement level could also be
removed; although the site would lose vehicular access to the basement level.
Site Plan and Architectural Review
7. As conditioned, the Project is consistent with the Site Plan and Architectural Review standards
stated in IZO §24.010, as follows:
a. The Project will use quality materials (e.g. horizontal V-groove siding,wood windows) to ensure
harmony and proportion of overall design that is consistent with the surrounding
neighborhood. The rear addition is also set in 1-foot from the side walls of the historic structure
to diminish any perceived presence from the public right-of-way.
b. For reasons stated above, the architectural style is compatible with the main residence and is
appropriate for the 'A' Street Historic District.
c. The Project would expand the rear massing of the structure into an area that is currently open
space but would otherwise not alter the existing footprint. Additionally,the Project is consistent
with all development standards as outlined for the R3 zoning district including setbacks and
height.The Project results in a siting that is compatible with other surrounding residences in the
District and proportionate to the size of the subject lot.
d. This finding is not applicable to the proposed project since it includes the remodel of an
existing residence with no existing signage.
e. The bulk, height, and color of the proposed project are in harmony with the existing residence
and other structures found within the immediate neighborhood.The bulk and height and color
are appropriate for the District, and will be compatible with the immediate neighborhood.
Neighboring lots in the vicinity include one to two-story single-family residences on single lots,
many of which also include accessory structures. The proposed colors include white for the
body of the building with black, teal, dark teal and gold colors for accents and trim.As stated
above, these colors are appropriate for the neighborhood, as well as the historic structure.
f. The Project does not include any landscaping changes beyond the excavation for the
proposed driveway and the construction of necessary retaining walls.
g. The Project would not alter existing ingress, egress, or internal circulation as it makes use of the
existing driveway location.
C. Based on its review of the entire record herein, including the November 29, 2019 Historic and Cultural
Preservation Committee staff report, all supporting, referenced, and incorporated documents and all
comments received and foregoing findings, the Historic and Cultural Preservation Committee hereby
approves Historic Site Plan and Architectural Review for the Project, subject to the conditions of
approval attached hereto as Exhibit 1.
Historic&Cultural Preservation Committee Resolution No.2020-01 Page 4
DocuSign Envelope ID: F9914019-D876-45C6-A7B9-90D2F358B389
ADOPTED this 14rh day of July, 2020, by the following vote:
Commission Member Aye No Absent Abstain/Recused
Chair Caputo X
Vice Chair Schlich X
Kosewic X
Perlis X
Rinehart X
DocuSigned by:
U�sftp(ux
hrj2(d �tr&7' &&j Y�-dbChair
ATTEST: APPROVED AS TO FORM:
DocuSigned by: DocuSigned by:
Secretary is Dc yrRtAEt0y48D...
Historic&Cultural Preservation Committee Resolution No.2020-01 Page 5
DocuSign Envelope ID: F9914019-D876-45C6-A7B9-90D2F358B389
Exhibit 1
CONDITIONS OF APPROVAL
Haas Residential Remodel
26 Sixth Street
APN: 008-045-025
File No. PLSR-20-0003
Planning Division
Standard Conditions of Approval
1. The plans submitted for building permit review shall be in substantial conformance with plans on file
with the Planning Division and date stamped February 10, 2020, and April 27, 2020 except as may be
modified by the following conditions. A determination of substantial conformance shall be made by
the Planning Manager in writing during the plan check review process. Nothing shall preclude the
Planning Manager from referring a substantial conformance determination to the Historic and Cultural
Preservation Committee for review at a publicly noticed meeting.
2. The colors and materials shall be in substantial conformance with those noted on the plan set, except
as may be modified by the following conditions.
3. Prior to the issuance of any construction permits, these conditions of approval shall be included with
the plan set. A copy of the approved plans shall be maintained on-site when construction activities
are occurring.
4. The site shall be kept cleared at all times of garbage and debris. No outdoor storage shall be
permitted other than typical bulk materials,i.e., lumber,appliances,window systems,etc., temporarily
stored through the normal course of construction.
5. All plantings shall be maintained in good growing condition. Such maintenance shall include, where
appropriate, pruning, mowing,weeding, cleaning of debris and trash, fertilizing and regular watering.
Whenever necessary, planting shall be replaced with other plant materials to insure continued
compliance with applicable landscaping requirements. Required irrigation systems shall be fully
maintained in sound operating condition with heads periodically cleaned and replaced when missing
to insure continued regular watering of landscape areas, and health and vitality of landscape
materials.
6. Construction activities shall comply with the following measures and all shall be noted on construction
documents:
a. Construction Hours/Scheduling: Noise-generating activities at the construction site shall be
between 8:00 a.m. and 6:00 p.m. Monday through Friday, and between 9:00 a.m. and 5:00 p.m.
on Saturdays. Construction is prohibited on Sundays and all holidays recognized by the City of
Petaluma.
b. Construction Equipment Mufflers and Maintenance: All construction equipment powered by
internal combustion engines shall be properly muffled and maintained.
c. Idling Prohibitions: All equipment and vehicles shall be turned off when not in use. Unnecessary
idling of internal combustion engines is prohibited.
Historic&Cultural Preservation Committee Resolution No.2020-01 Page 6
DocuSign Envelope ID: F9914019-D876-45C6-A7B9-90D2F358B389
d. Equipment Location and Shielding: All stationary noise-generating construction equipment, such
as air compressors, shall be located as far as practical from the adjacent homes. Acoustically
shield such equipment when it must be located near adjacent residences.
e. Quiet Equipment Selection: Select quiet construction equipment, particularly air compressors,
whenever possible. Motorized equipment shall be outfitted with proper mufflers in good working
order.
f. Staging and Equipment Storage: The equipment storage location shall be sited as far as possible
from nearby sensitive receptors.
g. Generators: No generators shall be utilized during nighttime hours (i.e., sunrise to sunset) to power
equipment (e.g., security surveillance) when normal construction activities have ceased for the
day. All such equipment should be powered through temporary electrical service lines.
7. Construction Plan: The permittee shall prepare a construction plan identifying the schedule for major
noise-generating construction activities. The construction plan shall identify a procedure for
coordination with the owner/occupants of nearby noise-sensitive land uses so that constitution
activities can be scheduled to minimize noise disturbance.
8. Noise Disturbance Coordinator: The permittee shall designate a "noise disturbance coordinator'who
will be responsible for responding to any local complaints about construction noise. This individual
would most likely be the contractor or a contractor's representative. The disturbance coordinator
would determine the cause of the noise complaint (e.g., starting too early, bad muffler, etc.) and
would require that reasonable measures warranted to correct the problem be implemented. The
telephone number for the disturbance coordinator shall be conspicuously posted at the construction
site.
9. The applicant shall defend, indemnify, and hold harmless the City or any of its boards, commissions,
agents, officers, and employees from any claim, action, or proceeding against the City, its boards,
commissions, agents, officers, or employees to attack, set aside, void, or annul any of the approvals
of the project, when such claim or action is brought within the time period provided for in applicable
State and/or local statutes.The City shall promptly notify the applicants/developers of any such claim,
action, or proceeding. The City shall coordinate in the defense. Nothing contained in this condition
shall prohibit the City from participating in a defense of any claim, action, or proceeding and if the
City chooses to do so appellant shall reimburse City for attorneys' fees by the City.
10. If, during the course of ground disturbing activities, including, but not limited to excavation, grading
and construction, a potentially significant prehistoric or historic archeological resource is
encountered, all work within a 100 foot radius of the find shall be suspended for a time deemed
sufficient for a qualified and city-approved cultural resource specialist to adequately evaluate and
determine significance of the discovered resource and provide treatment recommendations.Should
a significant archeological resource be identified, a qualified archaeologist shall prepare a resource
mitigation plan and monitoring program to be carried out during all construction activities.
11. In the event that paleontological resources, including individual fossils or assemblages of fossils, are
encountered during construction activities, all ground disturbing activities shall halt and a qualified
paleontologist shall be procured to evaluate the discovery and make treatment recommendations.
12. In the event that human remains are uncovered during earthmoving activities, all construction
excavation activities shall be suspended, and the following measures shall be undertaken:
a. The Sonoma County Coroner shall be contacted to determine that no investigation of the cause
of death is required.
Historic&Cultural Preservation Committee Resolution No.2020-01 Page 7
DocuSign Envelope ID: F9914019-D876-45C6-A7B9-90D2F358B389
b. If the coroner determines the remains to be Native American the coroner shall contact the Native
American Heritage Commission within 24 hours.
c. The project sponsor shall retain a City-approved qualified archaeologist to provide adequate
inspection, recommendations and retrieval, if appropriate.
d. The Native American Heritage Commission shall identify the person or persons it believes to be the
most likely descended from the deceased Native American, and shall contact such descendant
in accordance with state law.
e. The project sponsor shall be responsible for ensuring that human remains and associated grave
goods are reburied with appropriate dignity at a place and process suitable to the most likely
descendent.
Special Conditions of Approval
13. The windows and doors introduced with the structural additions to the existing house shall be wood,
with no cladding. Window and door details shall be submitted with the building permit application to
verify details prior to issuance of the permit to construct.
14. Proper shoring and underpinning to the existing structure is required for all areas undergoing
excavation.
15. Applicant will provide a protection plan for the protection of all historic elements to remain to be
reviewed by the Planning Manager prior to issuance of a Building Permit.
16. Applicant shall be responsible for protection of all existing materials and components including
identified character-defining features to remain in place throughout the duration of construction.
Extent of protection is to cover all historic elements to remain that are in the vicinity of construction
activities, or may be harmed by the movement of materials through the building and project site,
whether specifically called out on the drawings, or not. It is the applicant's responsibility to provide
any additional protection required to prevent soiling and damage to existing finishes and elements
to remain. In the even of damage, such items shall be repaired or replaced by the applicant at their
expense.
17. Plans submitted for building permit shall include a landscape and irrigation plan for any new and
replacement plantings on the subject property. The irrigation plan is subject to Planning Manager
review and approval.
18. All externally visible scuppers, gutters and downspouts shall either be painted to match background
building color(s) or consist of a decorative metal material (e.g., bronze) complimentary to the building
architecture.
19. All building-mounted lighting shall be shielded, downward-facing, and conform to the requirements
of Implementing Zoning Ordinance §21.040(D) (Glare).
20. This approval is, as provided for at IZO §24.010(I), effective for a twelve (12) month period unless the
permit has been exercised or unless an extension of time is approved in compliance with IZO
§24.010(J).
21. All applicable development impact fees shall be paid prior to completion of the building permit.
22. Prior to issuance of a Building Permit, the applicant shall provide a tree preservation and protection
plan, consistent with the requirements of IZO Chapter 17, that addresses preservation of the Coastal
Live Oak on the property at 22 Sixth Street.
Historic&Cultural Preservation Committee Resolution No.2020-01 Page 8
DocuSign Envelope ID: F9914019-D876-45C6-A7B9-90D2F358B389
Department of Public Works and Utilities
23. The applicant shall repair or replace damaged frontage improvements including but not limited to
curb and gutter, and sidewalk.
24. Existing Sanitary sewer lateral shall be video inspected and repaired or replaced as necessary.
Inspection report shall be submitted and approved by PW&U prior to construction.
25. Separate sanitary sewer laterals and water services may be required for each building depending on
plumbing code and fire requirements.
26. Lot-to-lot drainage is prohibited without appropriate storm drain easements.
27. Concentrated drainage over sidewalks shall not be allowed.
28. Improvement plan preparation shall be per the latest City of Petaluma policies, standards, codes,
resolutions, and ordinances. Existing and proposed water and sewer connections shall be to current
standards.
Building Division
29. Full review with building permit applications is required.
Fire Marshal
30. CBC 107.2.1 Information on construction documents. Construction documents shall be dimensioned
and drawn on suitable material. Electronic media documents are permitted to be submitted where
approved by the building official. Construction documents shall be of sufficient clarity to indicate the
location, nature and extent of the work proposed, and show in detail that it will conform to the
provisions of this code and relevant laws, ordinances, rules and regulations, as determined by the
building official.
a. Building code analysis provided is incomplete. Building code analysis shall comply with 2019 fire
and building codes and conform to the provisions of this code and relevant laws, ordinances,
rules and regulations. This shall be indicated on the Building permit submittal.
b. Building requires fire sprinklers. Fire sprinkler system shall be noted as a deferred submittal.
31. PMC 17.20 903.6 Where required in existing buildings and structures. An automatic sprinkler system
shall be provided throughout existing buildings and structures where required in Chapter 11 and as
required in this section.
a. PMC 17.20 903.6.1 Buildings that undergo a substantial improvement.
b. Substantial Improvement definition. Any repair, reconstruction, rehabilitation, alteration, addition
or other improvement of a building or structure that meet any of the following: An existing Group
R-3 building or structure, which undergoes any addition of floor area that is equal to or exceeds
50 percent of the existing gross floor area; An existing building or structure, which undergoes any
alteration of floor area that is equal to or exceeds 50 percent of the existing gross floor area; or A
building or structure, which undergoes any combination of repair, reconstruction, rehabilitation,
alteration, addition or other improvement that is equal to or exceeds 50 percent of the existing
gross floor area.
c. The proposed remodel exceeds 50 percent of the existing square footage of the structure and is
therefore defined as a substantial improvement. Installation of the fire sprinkler system requires
approved plans and permit from the Fire Prevention Bureau prior to work commencing. The
owner/contractor shall submit a permit application with three (3) sets of plans, cut sheets, and
calculations. This system must comply with NFPA 13D.
Historic&Cultural Preservation Committee Resolution No.2020-01 Page 9