Loading...
HomeMy WebLinkAboutResolution 93-197 07/19/1993 .. Resolution No. 93-197 N C.S. 2 of the City of Petaluma, California 3 4 RESOLUTION ADOPTING 5 THE FIVE YEAR CAPITAL IMPROVEMENT PLAN 6 FOR STREET SYSTEM IMPROVEMENTS AND 7 FY 1992-93 AND 1993-94 BUDGET 8 9 10 WHEREAS, the City Manager has prepared and submitted to the City Council a 11 Capital Improvement Plan (CIP) for Street System Improvements for the period from 12 FY 1992-93 to FY 1996-97; and, 13 14 WHEREAS, the City Council has reviewed the Five Year Capital Improvement Plan 15 which identifies the Capital Projects for each year; and, 16 17 WHEREAS, the CIP includes an annual budget to implement the CIP and the City 18 Council has reviewed the FY 1992-93 and FY 1993-94 Budgets of the CIP; and, 19 20 NOW, THEREFORE, BE IT RESOLVED, by the City Council that: 21 22 1. The 5-Year Capital Improvement Plan for Street System Improvements 23 from FY 1992-93 to FY 1996-97 is hereby adopted subject to the 24 Planning Commission finding and determining that said CIP conforms 25 to, furthers the interests of, and helps implement the goals, objectives 26 and programs of the General Plan. 27 28 2. The amounts for each project are set forth in said CIP and summarized 29 in the attached Exhibit D. 30 31 3. The FY 1992-93 and FY 1993-94 Capital Improvement Budget for 32 Street System Improvements is hereby adopted in the amounts for each 33 project as set forth in said CIP and summarized in the attached Exhibit 34 D. ~~~s. N~~.........9.3:-.1.9.7..... N.cs. 1 2 3 4 5 6 7 8 9 10 11 4. After the above findings and approvals are completed, the CIP is to be filed with the City Clerk. STCIP/sb/agenda/a:2 Under the power and authority conferred upon this Council by the Charter of said City. REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Approved as to Council of the City of Petaluma at a (Regular) (~[~5ltt~ld~2(~~I@t'~T) meeting ~,~_ form on the .......1..~~k1..-.-..... day of ...........s1.Ua.~ ......................................... 19..~.~., by the ~ ~ following vote: .............. =. -- ••-- ------.-•--- Ci y ttorne AYES: Nelson, Sobel, Hamilton, Shea, Vice Mayor Read, Mayor Hilligoss NOES: None ABSENT: Barlas ATTEST: --•-• ... ..... ................ .. ....... ... City Clerk Mays Council Fila ................................... CA 10-85 Res. No.......9.~-.1.9.7..-.. N.C.S. DRAFT JULY 19, 1993 CITY OF PETALUMA CAPITAL IlVIPROVEMENT PLAN FOR FISCAL YEARS 1993-1997 STREET SYSTE1Vd IlVIPROV'EMENTS ~x~+iP~~~- ~ R~~~~..,J 3- 1 7 N C S Ca~ta1 Improvement Plan FY 93-97 Street:Svstem Improvements SOURCES (IN $000) PRIOR FUND YEAR FY 92-93 FY 93-94 FY`94-95 FY 95-96 FY 96-97 TOTAL Gas Tax 355.9 387.0 386.5 384.5 333.5 1,847.4 FAU 132.0 132.0 State Grants 218.0 508.0 726.0 Private Cont. 36.0 37.0 39.0 43.0 155.0 Developer Cont. S.0 142.0 411.0 1,200.0 1,758.0 Comm. Facilities. 559.6 270.0 1,027.4 295.0 103.0 103:0 2,358:0 Undetermined 357:0 357.0 3,703.0 8,425.0 12,842.0 PCDC Contribution 518.0 1,911.0 553.0 5.;000.0 7,982.0 Special Assessment 1,861.0 4,257.0 ~ 6,118.0 Other Sources 10.0 29.0 .31.0 35:0 105.0 Traffic Mitigation 20.0 6.0 263.0 1,339.0 3,596.0 4,753.0 9;977.0 TSTEA 280.0 280:0 TOTAL. SOURCES 579.6 768.9 2,740.4 6,844.5 14,654.5 18,692.5 44,280.4 FUNDED PROJECTS (IN $000) PRIOR PROJECT' YEAR FY 92-93 FY 93-94 FY 94-95 FY 95-96 FY 96-97 . TOTAL Paee N i Highway 116 Widening 359.0 205.0 787.0 2_,079.0 4,765.0 8,195:0 S Pavement Mgmt System 47.0 12.0 8.5 8.5 8.5 84.5 7 Weller Street Const. 53.0 53.0 9 Water Street Pavement Rehab 15.0 15.0 1 l Street Resurf. Program 381.9 657.0 657.0 657.0 657.0 3,009.9 13 Sidewalk/C & G Replace 25.0 106.0 110.0 1'15.0 128.0 484:0 1S Handicapped Accessibility . 32.0 10.0 29.0 31.0 35.0 137.0 17 Rainier ExUlnterchaage 200.6 65.0 587.4 1,147.0 4,695.0 16,376.0 23,071..0 19 Undergrouttd Utility Ditatrict 2.0 5.0 5.0 12.0 21 -Old Red~llow Brook Bridga 5.0 234.0 2,056.0 2,295.0 23 Soundwalls 183.0 103.0 103.0 103.0 492.0 25 D SdPetalurtta Bridge Repair 20.0 192.0 212.0 27 Lakeville Widening-D.to Washington 2.0 59.0 369.0 430.0 29 No. McDowelllE. Washington imp. 55.0 270.0 3,425.0 3,750.0 31 Magnolia Ave.. Widening 20.0 6.0 11.0 72.0 391.0 ~ 500.0 33 Bodega Ave. Widening ~ 3.0 50.0 102.0 1,385'.0 1,540:0 35 579.6 768.9 2,740.4 6,837.5 14,661.5 18,692.5 44,280.4 I Air PROJECTS -SEE LOCATION MAP ABOVE 1. Highway 116 Widening 2. Pavement Management System 3. Weller Street Construction 4. Water Street Pavement Rehab 5. Street Resurfacing Program 6. Sidewalk/Curb & Gutter Replacement 7. Handicapped Accessibility S. Rainier Extension/Interchange 9. Underground Utility District 10. Old Redwood Highway/Willow Brook Bridge 11. Soundwalls 12. D StreeilPetaluma Bridge Repair 13. Lakeville Widening - D St: to Washington 14. No. McDowelUE. Washington Improvements 15. Magnolia Avenue Widening (Phase I) 16. Bodega Avenue Widening (Phase I) Street System Imnrovement~ Capital I,m~rovement Plan FY 93-97 Capital Improvement Plan FY 93-97 treet System Im$rovements NOTE:' Please see the Circulation 5 -Year CIP for additional projects . ANTICIPATED PROJECTS The following:projects (not funded) were identified by staff as possible future projects: Caulfield Extension to Petaluma. Blvd; So. Widen East "D." ~Stre.et from Lakeville to Petaluma Blvd. Copeland St. Transit Terminal Park & Rude Lots -Lakeville. Hi hway @ Highway 101 - Stony Point ~a Petalum`a Blvd. No. - Rainier Avenue @ Highway 101 Corona Road Wideningg - Sonoma Mountain Parkway to McDowell Blvd. No. - McDowell Blvd. No. to Petaluma Blvd. No. Bridge Replacement -Petaluma Blvd. No. (Twin Bridges) Sidewalk, Curb & Gutter Settlement Replacement in Novak Subdivision vicinity (Mar-ia, E. Madison, etc.) Cherry Street Improvements from Keokuk Street east Payran Wideningg - Washington to Caulfield E. Washington/Payran Intersection Improvements Washinggton/1,01 Intersection Improvements Lakeville Street Widening - E. Washington to Petaluma Blvd. Weller Street Improvements (Phase II) to "D" Street Pathways:.-Stony Point Enhancement Path and Willow Brook Path - Bike Path from Sonoma Mtn. Parkway to Prince Park - Capri Creek Pathway - Lynch Creek Pathway - Petaluma Blvd. No. Pathways Street Light Installation - McDowell B1vd..No. from Corona Rd. to Old'Redwood Highway - Petaluma. Blvd. No. -Sycamore to City Limits Median Installation - Casa Grande from Lakeville Highway' to McDowe l Blvd. No. - McDowell Blvd. No. from Corona Road to Old Redwood Highway Bodega Ave. Widening (Phase II) from .Howard to No. Webster Old Redwood~Highway/Highway 101 Overpass and Ramp~Replacement Replace railroad crossing on East "D" Street, @ Lakeville Magnolia Widening (Phase II) from Petaluma Blvd. no. to Keokuk ~St. 3 RESO: ~ 3~~- 1~ 7 N C~~~`f _ ,'qtr treet Svstem Improvements Capital Improvement Plan FY 93-97 PROJECT DETAILS capital Improvement Plan FY 93-97 Street` Svstem Improvements HIGHWAY 116 WIDENING !19736 PROJECT SCOPE This project.is .designed to widen Highway. 116. from two to four lanes from .Caulfield Lane to Frates Road. The plans call for the installation of new signals at the two intersections of Casa Grande and at Frates Road. Due to a priority need, a signal light .is being installed at the northbound 101 off-and-on ramp intersection in June of 1993. Medians ranging from two to fourteen feet wide will be installed (painted and curbed). A fourteen foot wide landscaped median will be installed between Marina. Avenue and Frates Road. Dual left turn lanes will be installed to the south bound on-ramp to Highway 101, and to Frates Road. Bus pullouts will be installed where possible, along with a sidewalk between Caulfield Lane and Baywood Drive. Six foot shoulders along the entire project can be used by bicyclists. On-street parking will be prohibited. This is the second phase of highway 116 improvements that began with a soundwall that was funded by the City and an assessment district. PROJECT LOCATION Lakeville Highway from Caulfield Lane to the City limits (700 feet southeast of Frates Road). 5 She -9 ~ - 1 ~ .7 N' C ~ avuaca.ca nnu vacs fan ww~ HIGHVYAY 116 BrIDENING PRIOR PROJECT SOURCES YEARS FY 92-93 FY 93-94 FY 94-95 FY 95-96 FY 96-97 TOTAL State Grant 218.0 508.0 726.0 Developer Cont. 100.0 100.0 Community Fac. 359.0 205.0 687.0 1,251.0 Special Assmt. 1,861.0 4,257.0 6,118.0 TOTAL 359.0 205.0 787.0 2,079.0 4,765.0 8,195.0 USES Admin/Eng/Insp 30.0. 30.0 30.0 282.0 612.0 Plan/Design 329.0 175.0 427.0 Land Acquisition 330.0 Improvements 1,500.0 3,459.0 Contingency 297.0 694.0 TOTAL 359.0 205.0 787.0 2,079.0 4,765.0 984.0 931.0 330.0 4,959.0 991.0 8,195.0 7' tr et Svstem Improvements Capital Improvement Plan FY 93-97 ~anital Improvement Plan FY 93-97 Street System Improvements PAVEMENT MANAGEMENT PROGRAM PROJECT SCOPE Develop a Pavement Management Program. for the..Cty's street system;. The purpose.., of the program is to generate 'a data base of the condition of all the arterials and collector treets, then prioritize the repairs.and maintenance based~on available funding. The program includes doing a field condition survey. This,will provide a ranking of streets as to condition, followed by recommended repairs and/or maintenance,. cost of repairs, priority list based on various levels of funding, and schedule of work. The first category of streets to be surveyed and cataloged, now underway, will be the arterials and collectors. This may be followed by the local streets. The City must.. commence a pavement management :program for the. City's arterials and collector streets in order to qualify for the next round of ISTEA funds starting in the first half of 1993. PROJECT LOCATION The City's arterial and collector streets (see map): SOURCES AND USES (IIV 5000) PAdEN4EN'f MANAGEMENT PROGRAM PWOR PROlEC1' SOt1RCES YEARS _FY 92-93 IY 93_Q~ FY 9495 FY•95-96 ~Y.~Z T~9~e t3as Tnx 47.0 12.0 8.S 8.3 8.5 84.5 TOTAL 47.0 12.0 8.S 8.5 8.5 84.5 USES Admin/Fro~ll~ S.0 2.0 .S .5 .S 8.3 Plsa/Deaga 42.0 10.0 8.0' 8.0 8.0 76.0 Land Acquisition Improvements ~r TOTAL 47.0 12.0 8.S ~ 8.S 8.5 84.5 _~ Capital Improvement Plan FY 93-97 Street Svstem Improvements WELLER ST. CONSTRUCTION . PROJECT SCOPE A portion of Weller Street (east side) has never been improved to City standards. The redevelopment agency is funding an improvement project for about half of this section of street.' Theimprovementstyill include 280 feet of curb,. gutter and sidewalk, storm drainage, and paving of the street along the new gutter. PROJECT LOCATION A portion of Weller Street between East Washington Street.and East "D" Street, from the existing parking lot on the east side, for 280 feet south toward East "D" Street. Strom vste~m Improvements anita~l I_mnrovement Plan FY 93-97 LAKEVILLE ~ ST. ••~• '., ~c~ •~., ~ ~ ~ •'. •` •`•~Q' o. WELLER ST. ~, PRU.1 EC~ . SITE ••''• ~••- ~.. ... ~~ RIVER pEtA •~••~..~..-. ~~MA '_• -••~•.~ 1st. St. ~ C Ao ~r SOURCES AND USES (IN $000) WELLER STREET CONSTRUCTION PRIOR PROJECT SOURCES YEAR FY 92-93 FY 93-94 949 9 -% EY %-97 TOTAL PCDC 53.0 53.0 TOTAL 53.0 53.0 USES Admin/Fng/Inap 6.0 6.0 Plan/Design Land Acquisition Improvements 41.0 41.0 Coatinyeacy 6.0 6.0 TOTAL 53.0 53.0 ° Reflects funds appropriated in FY 93-94 PCDC budget e ESQ.: J 3 ° 1 7 °N ~C~S io Capital Improvement Plan FY 93-97 Street'Svstem Improvements WATER STREET PAVEMENT REHAB (PHASE I) PROJECT SCOPE This portion of Water Street is severely deteriorated due to lack of maintenance; heavy . traffic; .and lack of cooperation ~on, the part of the railroad to maintain the' area around the tracks. This. work would provide pothole repair and a thin asphalt. overlay 'to improve the driving/walking surface.. The work, to be done by City crews, is a temporary solution that will suffice for three to five years.. Sewer and water mains are scheduled for replacement in the future, at-which time the street will receive a more permanent resurfacing. But, this repaving project should be done now and not be postponed until the utility- upgrade. PROJECT LOCATION Water Street from East Washington Street to Western Ave/Petaluma Blvd. ~~: 11 RESO.`~9 .=3.3®1 7 N'C, S Street Svstem Improvements .apital Imnrove•rlPnr Plan FY 93-97 • .~~~-..~..e ,~• ~~. ` .'~~~. •~' St. .. •, .e ~~® P~OJ ECT ~ zed St SITE gAt`,Q pE(AI.Uw ®'~~ 5 A11~ S~ . ~ . J~~ (( P 4th SC. E,p sr ~~~~ ~' iN 3 w, ~ ,r C AO °~ t. soURCES AND USES cnv sooo~ wAT>;It sr. PAVEI-~NT REHAB (ply n PRIOR PROJECT SOURCES . EAR b~9~ FY 93"94 949 FY 95-96 FY 96-97 T~ PCDC 15.0 15.0 ° TOTAL 15.0 IS.O ~V V Admin/Eag/Ia~Q Plan/Design Land Acquisidoa Improveauats 15.0 IS.O Contia~eacy TOTAL IS.O I S.0 ° Reflects funds sppcopristed in FY 93-94 PCDC budget M 12 Capital Improvement`Plan FY 93-97 Street System Improvements STREET RESURFACING PROGRAM #9732 PROJECT SCOPE This. project includes. the resurfacing of portions of several streets throughout the' City. City staff is currently doing a pavement condition survey for all the arterial and collector streets in the City as part of the City's. new Pavement.Management Program, The data from ahe survey will form a listing of all the streets, from those in the best condition to those in ahe worst condition. The listing and Pavement Management Program will also provide street areas; recommended method for repair or maintenance, and cost to repair: The report. and street condition listing is expected in mid 1993. From the `report; staff will make the recommendation for the specific streets to be included in the Street Resurfacing Program for future fiscal years: PROJECT LOCATION FY 92- -Petaluma Blvd. No. was resurfaced between Kent St. and Shasta Ave. (work complete). FY -94 -Recommended list will follow completion of Pavement Management Program. S6'~~r®.~V 3 ' 1{ ~.4~YkCV~ 13 ~- Street System ImvrovementS Capital Lmnrovement Plan FY 93-97 mar i iu ~ i ~ '9~ _, ~_._, •~ ~ LSO G,a..T i o _ ~ c T'o b>E a>l=T~: t~~ t ~ ~n SOURCES AND USES (IN 5000) STREET RESURFACING PROGRAM PRIOR PROJECT SOURCES YEAR FY 92-93 FY 93-94 FY 94-95 FY 95-96 FY 96-97 TOTAL Gas Tax 249.9 300.0 300.0 300.0 240.0 1,389.9 FAU 132.0 132.0 Undetermined 357.0 357.0 357.0 417.0 1,488.0 TOTAL 381.9 657.0 657.0 657.0 657.0 3,004.4 USES Admin/Eng/Insp .28.0 32.0 32.0 32.0 32.0 156.0 Plan/Design 19.0 50.0 50.0 50.0 50.0 219.0 Land Acquisition Improvements 334.9 500.0 500.0 500.0 .500.0 2,334.9 Contingency 75.0 75.0 75.0 75.0 300.0 TOTAL 381.9 657.0 657.0 657.0 657.0 3,009.9 RESO:~ 9,3 - r~ ~ rt C S 14 Capital Improvement Plan FY 93-97 Street. Svstem. Improvements. SIDEWALK/CUR'B .& GUTTER. REPLACEMENT x{9731 PROJECT SCOPE This will be a new program for .the. City to undertake. This program would' `increase efforts to improve damaged sidewalks and' curb and gutters throughout the City. Tree Damaage'Replacement Within this program, the City and; the property owners would pay 'S0 % each on. the cost of replacement' when a City tree rs the cause of damage. The entire cost of City tree root removal, if required, is on the City. Miscellaneous Replacement If the replacement; is not caused by a City tree, the. total replacement cost of `the. sidewalk will be the .property owners responsibility. In all cases, the City pays for all costs to replace curbs and gutters PROJECT LOCATION Citywide locations. ~~~,oa~n3~- ~ ~~N,C,S is . treet S~!stem Improvements Cai?ital. Lm~rovement Plan FY 93-97 r i i ~~ C~ C 1 TY W 1 pE PR~C~21aIv~ -SOURCES AATD USES (IN 5000) SIDE6VALR/CURB ~ GUTTER REPLACEMENT PRIOR PROTECT SOURCES YEAR.. FY 92-93 FY 93-94 FY 94-95 FY 95-96 FY 96-97 TOT Gas Tax 25.0 70.0 73.0 76.0 85:0 329.0 Private Cont. 36.0 37.0 39.0 43.0 ]55.0 TOTAL 25'.0 106.0 110.0 115.0 128.0 484:0 USE5 Admin/Eng/Insp 9.0 9.0 10.0 10.0 38.0 Plan/Design Land Acquisition Improvements 25.0. 88:0 92'.0 95.0 108.0 408.0 Contingency 9.0 9.0 10.0 10.0 38.0 I TOTAL 25.0 106.0 110.0 115.0 128.0 434.0 RESO.9 3 - 11 7 N C~$' 16 Capital Improvement Plan. FY 93-97 Street S:vsfeln Improvements HANDICAPPED ACCESSIBILITY PROJECT SCOPE Continuing program of installing. wheelchair .ramps in existing sidewalks. This list includes input from handicapped Petaluma citizens. During FY 92-93, 20 ramps have been installed. PROJECT' IACATION ation # of Pedestrian R~~ FY A2-93 (Completed) L D Street ~~.Edith Street 2: Petaluma Blvd. South'~~;FStreet 3. Petaluma Blvd. South@ G Street 4. Mts. View Avenue: ~`Sth Street S. Fair Street ~:Petslums,High School 6: McDowell Blvd. South @ Ama Way 7. Anas' Way @ Clelia Lana 8. McDowell Blvd. South ®Clegg Street FY 93-94 9. Petaludoa:Blvd. No. ® Oak St. 10. E. Waatiington ~ Maria 11. E. Washington (~',SUtter 12. City Hall Driveway in fmnt bf Planning FY 9495. 13. English St. 'Baker 14. Pctetuma Blvd. No..scrose from Martha St. IS. McDowell Blvd. So. ~ McGregor 16. McDowell Blvd: So. ~ Heywood Dr. 17. McDowell Blvd. So. ~ McNeil Ave. 18. McDowell Blvd: So. ~ Betrydale Dr. 19. McDoweIl~BLyd:~So~;Evergreenlsne 2U. McDoweU BIVd: So. ~ St. Fiancis Dr. 21. McDovveU:Blvd. Sp. ®Covey 22. Anna Way ~ Damel Way 23. Bassett St.~:Fair St. 24. English:,St. ~ Fair St. 25. Sixth St. ~ B St. 26. Sixth St. ~ A St. . EY 95-96 27. Crixtla Dr: near Trellis Lax Total 20 1 2 2 2 Total T 2 1 3' 3 Z 3 2 2 1 3 4 1 1 Total 29 4 Street Svstem Imvrovements Ganital Imnrc,~vement Plan FY 93-97 ..~_ I~~ y~ c~~ W ~ nE ls~r~.-r ~o . SOURCES AND USES (IN E000) HANDICAPPED ACCESSIBILITY PRIOR ~ PROJECT SOURCES YEARS FY 92-93 9 -94 94-95 Y 95-96 PY 96.97 TOTAL Gas Tux 32.0 32.0 CBDG ~ 10.0 29.0 31.0 35.0 105.0 TOTAL 32.0 10.0 29.0 31.0 35.0 137.0 USES Admin/Eng%Insp Plan/Design Land Acquisition Improvements Contingency I TOTAL 3.5 1:0 2.0 3.0 3.0 12.5 3.5 1.0 2.0 3.0 3.0 12.5 25.0 7.0 22.0 22.0 24.0 100.0 1.0 3.0 3.0 5.0 12.0 32.0 10.0 29.0 31.0 35.0 137.0 R~~~. ~ 3 ®1 7 N` C~.S_. ,;~ .. t~ Capital Improv.em'eni Plan FY 93-97 Street SvStem Improvements RAINIER EXTENSION/ INTERCHANGE 9528 PROJEC'T` SCOPE This..project involves the construction.of anew four lane cross town connector. new roadway; an extension of Rainier Avenue, would cross overHi~" hway The g 101" a`nd t'he Petaluma River from Nor-th McDowell Blvd. to Petaluma.Blvd. North. The, project would :include a full interchange with Highway 101, bike lanes, sidewalk on one side-of the roadway.,.. bus stops, new auxiliary lanes along Highway 101 between Rai-vier Ave. and E, Washington, and;a new~soundwall along Highway 101` and the `near of, residences on Arlington Drive.. The viability and scope of this project veil`1 be~defned through the Environmental Impact Report. (E~IR) process. The EIR.s expected to be available for-publicreview in mid-1993.' PROJEC'T' I:OCA'T`TOIV Rainier Avenue, Highway 101 and Petaluma Blvd. ~~~~~0 9 3 m 1. '~ N ' :~s C~ 19 . - SOURCES AND USES (IN 50001 . RAINIER EXT/INTERCHANGE PRIOR PROJECT SOURCES Y .AF $~ FY -9 FY 93-94 94-9 FY 95-96 FY 96-97 TOTAL Developer Coat. 1,200.0 1,200.0 Coaununity Fac. 200.6 65.0 137.4 403.0 Undetermined 2,042.0 7,008.0. 9,030.0 Traffic Mit. 900.0 4,368.0 5,268.0 FCDC 450.0 1,147.0 553.0 5,000.0 7,150.0 TOTAL 200.6 65.0 387.4 1,147.0 4,693.0 16,376.0 23,071.0 USES Adroin/Eng/Inep 50.0 50.0 100.0 100.0 100.0 2,352.0 2,752.0 Plan/Deoiga 130.6 ~ IS.O 437.4 947.0 452.0 2,002.0 Land Acquisition 50.0 100.0 4,143.0 4,293.0 Improvements 11,687.0 11,687.0 Contingency 2,337.0 2,337.0 TOTAL 200.6 65.0 387.4 1,147.0 4,693.0 16,376.0 23,071.0 • FY 93-94.,amouet'reflecu Panda appropriated in FY 93-94 PCDC budget 4 Zo ~anital Imnrovement.Plan FY 93=97 Street S stem Imurovements UNDERGROUND UTILITY DIST'RICT'S PROJECT SCOPE PG&E under Public Utility Commission Rule 20A allocates approximately $176';000 each year for Petaluma ao .underground existing overhead wires. Any overhead 'PT&T' or Viacom wires are also. required ao: be undergrounded at utilities expense; when a district is formed. Tlie Petaluma.. PG&E allocation, as of December, 91 is $523,,258' with an anticipated 1993 allocation of $176,390 for a capability to construct a $69.9;:648 project.: On 12-7-92, the.'Cty Council agreed with the City,'s Underground LTdlity Committee that the uridergrounding of the overhead utilities on Magnplia Ave... are fist priority:. The cost for design and construction, estimated at $`690,000, will be paid by PG&E through Rule 20A funds.. The coordination and administering of-the underground district work for all of the utilities w-ill be:haridled by PG&E. The City is planning on-acquiring right of way over the next two years in:anticipation of .widening, Magnolia Ave. The undergrounding of. the utilities by PG&E in, FY 94=95 may also need the new right-of--way. Their utility work would occur ahead of the. road" widening project by the City. PROJECT LOCATION First Priority (FY 94-95) 1. 1Vlagnolia Ave.-from Petaluma Blvd. No. to Keokuk Street. Second Priority 2. .Lakeville Street from Caulfield westerly,towards,Jefferson and Lakeville Highway from Caulfield to US 101. Third Priority 3. Water Street - E. Washington to Western Ave. 21 Street- System I'mDrovements CaBi'ta1~ImrDrove-merit Plan FY 93-97 _~r'`' ~~~ ° cm ,~. ~UR~>,sANDU~~~~ UNDERGROUND UTILITY DIST. PRIOR PROJECT SOURCES ~,~{A FY 2 3-!' FY 93-94 FY 9493 FY 93-% FY 96-97 TOTAL Gas Tax 2.0 5.0 S.0 I2.0 TOTAL 2.0 S.0 S.0 12.0 USES AdmidFag/IoaP 2.0 S.0 S.0 L2.0 Plaa/Deaign Land Acquisition Improvemeata Contingamcy TOTAL 2.0 S.0 S.0 12.0 RCS®: 9 3 m 1 "~ ~~ ~~CT~ 22 Caotal Imvrovernent Plan FY 93-97 Street Sv-stern Improvement OLD REDWOOD HWY/ WILLOW BROOK BRIDGE REPLACEMENT PItOJEGTSCOPE This project would widen, raise and.lengthen the bridge ove Willow Brook. Th:e developer of the Redwood Business Park is requi-red to widen the bridge .ori his developrne~nts side and commit to fair share pparticipation to~ae,commodate the ultimate street width. The fair share would be based on t°he deve,loprrient's contribution of vehicle traffic. In order tq construct 'abrid'ge that is adequate both hydraulieal`ly and traffic wise., it ins necessary to remove the~.existing-structure and replace t:with' a bridge that is higher, lon~er;and;wder. The proposed. bridge will accommodate bicyclists, pedestrians and l00 year flood flows. The developper's conditions of approval translates to a participation share of 20%, with'the City share at 80%. PItOJ°EC'I' LOCA'I'I®N Old Redwood Highway @ Willow Brook Creek. ~~s~. ,~ ~ - 1;7 N C ~3 ~ ~'~ Street Svst, em Improvements Capital Improvement Plan FY 93-97 1' ~~ \~, y 1 '1 ELr RD. ~~ .y ~~ ~~ ~ ~\ ~ s ~4~1 ~~ Py \ \\ _ _ ~ 0 z I ~ \ ~ ~ yry ~ '~ ~~ ~ c PROJECT ~ ~ ~ ~; SITE ,, <, \~°,~ I ,, !i n ;. ' ~I BAKER LN_~'1~ ==______________ r ~~= _____:_ I /r a _ _ - _ _ n uMrr - _ _ - _ _ _ ~~ R1(~'~I ~ r ' /I ~ ~a ,1 ,'"1 I ~ f~ o Reowooo wAr ` ~ ' ~. ~ / ` ORCHARD ' ~ l ~` - - ~-~~- LN. I '~~j l ~ Q il l D~ ~ 1b '~r l ~~ ~ S, ~Y c0 EST r SHOPPING CENTER y ~ ~ ~ ~~ . 7 ( SOURCES AND USES.(IN 5000) OLD RED/WILLO~fI BROOK BRdDGE PRIOR PROJECT SOURCES YEARS FY 92-93 ~FY 93-94 FY 94-9 YF 95-96 FY 96-97 TOTAL Developer Cont. 5.0 42.0 411.0 458.0 PCDC 764.0 764.0 Traffic Mit. 192.0 881.0 1,073.0 TOTAL 5.0 234.0 2;056.0 x,295.0 USES Admin/Eng/Insp 5.0 22.0 265.0 292.0 Plan/Design 212.0 212.0 Land Acquisition Improvements 1,629.0 1,629.0 Contingency 162.0 162.0 TOTAL 5.0 234.0 2,056.0 2,295.0 24 Capital Improvement Plan FY 93-97 Street System Improvements SOUNDWALLS PROJECT SCOPE Construct soundwalls along various City arterial -and .collector streets. This project would be a partnership project between the City and property owners to construct, oundwalls: City pays to construct the walls; property owners are responsible .for removing their existing fences by an agreed upon time. The installation of the soundwalls would be phased so as to construct approximately 600 lineal feet. of soundwall per year in contiguous sections. This is comparable to ten contiguous homes: The first group of ten contiguous'home owners that.etiter into an agreement to remove their fences will be the first on the priority list. Due to shorter street blocks, the following, sections may have less than ten-:homes as a project: Casa Grande: 1) between Lakeville Hwy. and Bond Ave..: minimum of six contiguous homes; and 2) between Bond Ave. and':McDowell Blvd.: eight contiguous homes; Caulfield Lane, west of'St.:Francis: ,five contiguous homes; E. Washington, west of Maria Dr.: seven contiguous homes. The partnership's arrangement between the' City :-and the home owners would .divide- into the following responsibilities: - The City would pay the cost to design and construct the soundwalls in 600 foot .sections (one side of side): The City :also would remove the existing brick column posts of the existing fences. - The property owners would agree to enter an agreement with the City that the property owner would remove- their fences prior to the installation of the souridwall (brick column posts removed. by City).;- be.responsible for,pets, children, and home security in between the time. their fences are removed. and the new soundwall is installed; reconnect side yard. fences to new soundwall; and grant City temporary construction access or.an access easement is required. For estimating=purposes, the wall is 8 feet. above the top of curb. at street, estimated for one side of a street,- and when completed will be maintained by the City. PROJECT LOCATION Examples of locations (not in any priority.): 1. Casa Grande. Rd. -Lakeville Hwy, to 1VIcDowell Blvd. So. 2. Caulfield - US l0'1 to McDowell.Blvd: So. 3. E. Washington -from 500' feet west of Maria Drive. S $6~~~syV .CJ y • ~ ~~' ~: ~Y 25 , _ .~ , . ' SOURCES AND USES (IIV 5000) SOUNDWALLS PRIOR PROJECT SOURCES YEARS FY -9 FY 93-94 949 FY 93-96 FY 96-97 TOT .LA Community Fac. 183.0 103.0 103.0 103.0 492.0 TOTAL 183.0 103.0 103.0 103.0 492.0 USES Admin/F~/Imp 17.0 11.0 1'1.0 1.1.0 50.0 Plan/DesiQa 23.0 9.0 9.0 9.0 50.0 Lend Acquiaidon . ImQroveaeeats 119.0 73.0 75.0 73.0 344.0 contu~gmxy 2a.o a:o s.o s.o as.o TOTAL 183.0 103.0 103.0 103.0 492.0 Y, RES4.9 3 ®1 7~Na-C. i 26 capital Improvement Plan FY 93-97 Street System Improvements "D" ST/PETALLTMA RIVER BRIDGE REPAIR PROJECT SCOPE The "D" Street Bridge over the Petaluma River is in need of repairs: The bridge has a recent .history of -not opening when `required to open for passing. boats: The mechanical gear system and electrical controls, that raise the bridge need to' be overhauled. PI~O,j~ECT I.OC~iTION "D" Street ~ the Petaluma River: 27 RESOo 9 '3 ~ 1 :'~. N. C reef System Imnrovem_ents Ca it~vrovement Plan FY 9.3-97 ~i - ,/ . PROJ EGZ SITE SOURCES AND USES (IN 5000) D ST/PETALUA[A BRIDGE REPAIR PRIOR PROJECT SOURCES YEARS FY 92-93 FY 93-94 FY 94-95 FY 95-96 FY 95-97 TOTAL Community Fac. 20.0 192.0 212.0 TOTAL 20.0 L92.0 212.0 USES ~ Admin/Eng/lnsp 27.0 27.0 Plan/Design 20.0 20.0 Land Acquisition Improvements 150.0 150.0 Contingency I5.0 15.0 TOTAL ~ 20.0 192.0 212.0 Q~• " . n 5 ~K Capital Improvement Plan FY~93-97 Street.Svstem Imnrovemenrs LAKEVILLEST. WIDENING - E. WASHINGTON~TO EAST'"D'' ST. PROJECT SCOPE Widen Lakeville St-.,from2 to 3 lanes to ~royde an additona~l~turning.lane at E. Washington and at'Easf "D" S, t. The project will include a sidewalk on the northeast side. Improvements are needed to relive backups on Lakeville. PROJECT LOCATI®N Lakeville St. - E. Washington to East "D" St. ~9 ~ li.. LAIKEVILLE ST. NIDENING ` PRIOR PROJECT SOURCES Y R FY 92-93 Y 93-94 FY 94-95 FY 95-96 FY 96-97 TOTAL Traffic Mit. 2.0 59.0 89.0 150.0 ISTEA 280.0 280.0 TOTAL 2.0 59.0 364.0 430.0 USES Admin/Eng/Insp 2.0 3.0 45.0 50.0 Plan/Design 56.0 56.0 Land Acquisition Im~rovemenis 280.0 280.0 Contingency 44.0 44.0 TOTAL 2.0 59.0 369.0 430.0 DIES®.'~9 `3 _ ~ -'a'~N`~~, ?c~ treet.Systprovements Capital Improvement Plan FY 93-97 Capital Improvement Plan FY 93-97 Street System Improvements MCDOWELL BLVD.. NO._ IMP. (~? E. WASHINGTON PROJECT SCOPE This project would involve widening and adding two-new approach.lanes: one in>No. McDowell :Blvd. in, the southbound direction to E: Washington, and :one. in McDowell Blvd: in the northbound direction toward E. Washington,. These improvements which would :help maintain the- existing level of service at this. critical intersection, .would involve right-of-way acquisition, widening. the existing McDowell Blvd. box culvert over Washington Creek, and utility relocation. A pre-design study would be done in 93-94 to explore the feasibility' of adding both lanes, the cost, and: sources of funding; One; ounce of funding for the project may be an assessment district formed by the nearby shopping centers. PROJECT' I.OCAT'ION On McDowell Blvd. No. (southbound direction) and on McDowell Blvd. (northbound direction) at E. Washington. 31 ~ ~~---~- ~~. ~ ~~;~ y ~,O Ci0 SOURCES AND USES (IIY-50001 MCDOWELL BLVD/ E. R+ASFiINGTON IMI'ROVFAZFIV'fS PRIOR PROJECT' SOURCES YEAR ! IY 92-93 FY 93-94 FY 94-95. I'Y 95-96 . FY 96_97 T~ TreP6c Mit. SS.O 277.0 2;114.0 2,446.0 Undetermined 1,304.0 1,304.0 TOTAL _ SS.O 277.0 3,418.0 3,730.0 USES Admio/Eog/In~p S.0 20.0 325.0 350.0 Plen/Deagn 50.0 250.0 300.0 Lend Acquisition 350.0 350:0 lmprovetaente 2,500.0 2,500.0 Continge~y 250.0 250.0 TOTAL SS.O 270.0 3,425.0 3,750.0 -~ r. R.~~O.9 w3 ®1 '3' N'.C:~S' 32 vital Improvement Plan.. FY 93-97 Street System Improvements. MAGNQLIA AVE. WIDENING PHASE I #9734 PROJECT SCOPE This project is the first;phase of_the widening of Magnolia Ave. to •a uniform ,width (two lanes),., plus, bike Ganes. The widening .project is~. based upon the modif ed pian line approved by the City Council during the.review-of the:'Magnolia Hills .subdivision project. The widening of Magnolia will be done. i 'n .phases in order to match incoming funding sources Phase I work is an interim project. that. will .include right-of wa .acquisition for both utility .relocaton'.and roadwork, Thee road wok in Phase I would focus.on• widening the narrow portion of the street near Petaluma Blvd. No. Phase II work would finish out the widening- as needeii, `but .would' be` timed as funds become available. In addition to street widening,. the City Council ..identified (on 12-7=92) :Magnolia .Ave. as the priority project for°undergrounding of overhead utility lines. Preparation of the undei round utili' laps and construction b` the'utility cornpan~es_is expected to~be g t3! `P . y .completed by Jan 1996. The City will be. acquiring right-of--way for the road widening work prior to thee, undergrqunding. by the iTrhty Companies: The widening of Magnolia Ave. by the City, will then follow the utility company work. PROJECT ~CATI®1V Magnolia Ave/Petaluma Blvd. No. ~to Keokuk Street. Street Svsteln Improvements Capital Improvement Plan FY 93-97 ®® ®® ®.®®® PAC S.i;G ~~ e ~® ~® ~® U s ~P~ Q P~ AFT - PJF, -9~G ~q LPG PR~ECT ~ .SITE ; SOURCES AND USES (IN 3000) I1~AGNOLIA WIDENING PRIOR PROJECT SOURCES Y AR FY 92-93 FY 93-94 FY 94-95 FY 9 -96 FY 96.97 3'OTAL Traffic Mit. 20.0 6.0 11.0 72.0 391.0 500.0 TOTAL 20.0 6.0 11.0. 72.0 391.0 500.0 USES Admin/Eng/Insp 5.0 1.0 1.0 2.0 46.0 55.0 Plan/Design 15.0 5.0 10.0 15.0 45.0 Land Acquisition 55.0 55.0 Improvements 300.0 300.0 Contingency 45.0 45.0 TOTAL 20.0 6.0 11.0 72.0 391.0 500.0 RED®:~~3-1 '7NCS 34 Capital Improvement; Plan FY 93-97 Street Svstem Improvements BODEGA .AVE. WIDENING (PHASE I) PROJECT SCOPE Widen Bodega Avenue from No. Webster to City limits in accordance with. planline study which will determine.geometrics based upon. public fiearings and environmental review. The proposed project would include two Through. lanes, and one dual. left turn center lane, including bike lanes on both sides of the street. Staff will be seeking: Federal "(ISTEA) funds to supplement a portion of, or all of the undetermined source of funds. Phase II, the widening from Howard to No. Webster, is included in the .anticipated project list. PROJECT IACATION Bodega Ave. from No. Webster to the westerly City limit line between Bantam Way and Paula Lane. ~~~Oo ~ -3 - ~ ~.~7 -,N~C~ S 35 a Street SvS~em Irnnrovements Ca itD~nrovement Plan FY 93-97 ~4BER~ ST f~~f P R ST t4,~ 02 C ~.. HOWARD ST. ~ ys 3< WARD SL ~Q R~11ECT ~ A Q' n SITE - ~ QD~ Pu AsE I [~L] D O a C ~o ~ e '~. .~ oo~~~ 6 ~ P o ~G,~ ~ ~dC~r CA SOURCES AND USES (IN $000) BODEGA AdE. 9YIDENING PRIOR PROJECT SOURCES E R FY 92-93 93-9 94-9 FY 95-96 YF 96.97 'I_O~L Traffic Mit. 3.0 50.0 102.0 385.0 540.0 Undetermined 1,000.0 1,000.0 TOTAL USES I Admin/Eng/Insp Plan/Design Land Acquisition Improvements Contingency 3.0 50.0 102.0 1,385.0 1,540.0 3.0 - .10.0 10.0 175.0 198.0 40.0 92.0 132.0 1,100.0 1,100.0 1.10.0 110.0 TOTAL 3.0 50.0 102.0 1,385.0 1,540.0 RESO.9 3 - 1~ ~ ri C S 36