HomeMy WebLinkAboutResolution 2023-089 N.C.S. 06/05/2023 DocuSign Envelope ID:527B540E-AC34-435E-B155-6851AB611960
Resolution No. 2023-089 N.C.S.
of the City of Petaluma, California
TO APPROVE THE PROPOSED PROJECT LIST FOR FISCAL YEAR 23/24 PER THE
REQUIREMENTS OF SENATE BILL 1 TO OBTAIN ROAD MAINTENANCE AND
REHABILITATION ACCOUNT FUNDS
WHEREAS,on April 28,2017,the Governor signed Senate Bill 1 (SB 1),which is known as the Road Repair
and Accountability Act of 2017, to address basic road maintenance, rehabilitation, and critical safety needs on
both the state highway and the local streets and road system; and
WHEREAS, by Streets and Highway Code, Section 2034, the City shall submit to the California
Transportation Commission (Commission) a list of projects proposed to be funded with these funds pursuant to
an adopted City budget,and projects proposed to receive funding shall be included in a City budget that is adopted
by the City Council at a regular public meeting; and
WHEREAS, SB 1 funding will enable the City to continue essential road maintenance and rehabilitation
projects, safety improvements, and increase access and mobility options for the traveling public; and
WHEREAS, a proposed project list consisting of pavement rehabilitation on various streets to be submitted
to the Commission has been compiled for the use of$1,478,666 made available by SB 1 and supplemented by
Street Maintenance Fund for the current fiscal year and due on July 1, 2023; and
WHEREAS, the Road Maintenance and Rehabilitation Account (RMRA) funds are categorically exempt
pursuant to the California Environmental Quality Act ("CEQA") Title 14, of the California Code of Regulations
Section 15301, because the project consists of the repair, maintenance, and minor alteration of existing public
facilities involving negligible or no expansion of existing or former use, including existing highways and streets,
and the mitigation of pavement conditions to enhance the safety for motorists and bicyclists; accordingly, there
are no cumulative impacts, unusual circumstances, or other factors that would make the exemption inapplicable;
and
WHEREAS,the RMRA funds will be combined with the current Capital Improvement budget for the projects
listed in the FY 23/24 Capital Improvement Program budget.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby:
1. Declares the above recitals to be true and correct and are incorporated into the resolution as findings.
2. Finds that the action of proposing and submitting a list of projects to be funded by RMRA funds is not a
"project"pursuant to the California Environmental Quality Act (CEQA) Guidelines Section 15378 as this is
a fiscal and administrative activity. If the City receives RMRA funds, the City will analyze the specific
projects for CEQA compliance. However, the use of the RMRA funds for the specific projects will likely be
categorically exempt pursuant to the California Environmental Quality Act and Title 14, the California Code
of Regulations ("CEQA Guidelines"), Section 15301(c), because the project consists of the repair,
maintenance, and minor alteration of existing public facilities involving negligible or no expansion of existing
or former use, including existing highways and streets, and the mitigation of pavement conditions to enhance
the safety for motorists and bicyclists. Accordingly, there is negligible or no expansion of use beyond what
currently exists and there are no cumulative impacts,unusual circumstances, or other factors that would make
the exemption inapplicable.
Resolution No. 2023-089 N.C.S. Page 1
DocuSign Envelope ID:527B540E-AC34-435E-B155-6851AB611960
3. Approves the proposed project, attached hereto as Exhibit A, for use of RMRA funding for FY 23/24.
4. Directs the City Manager to submit the proposed project list to the California Transportation Commission.
5. Approves a quarterly budget adjustment to appropriate RMRA funding and carries forward unused budget
appropriations from the prior year to FY 23/24.
Under the power and authority conferred upon this Council by the Charter of said City.
REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Approved as to
Council of the City of Petaluma at a Regular meeting on the 5'day of June Doc edMiin;
2023,by the following vote:
v
city tt iney
AYES: Mayor McDonnell,Vice Mayor Cader Thompson,Councilmembers Barnacle,
Healy,Nan,Pocekay,Shribbs
NOES: None
ABSENT: None
ABSTAIN: None
DocuSigned by: DocuSigned by:
ATTEST:
�aasasaa!9E4492... City Clerk Mayor
Resolution No. 2023-089 N.C.S. Page 2
DocuSign Envelope ID:527B540E-AC34-435E-B155-6851AB611960
Exhibit A
Exhibit A - Project List
r
City of Petaluma,Department of Public Works and Utilities c
202 N.McDowell Blvd,Petaluma,CA 94954
IggO
Department Contact: Ken Eichstaedt
City Project Number: C16102139
Legislative District: 2"d
Avg.Network PCI: 2023:PCI=42
Fiscal Year: 23/24
Pavement Restoration 23/24(LSR-2024-5022) Project(Update)
Proposed Street List
Includes the design and construction of North McDowell Complete Streets from Sunrise Parkway to Old Redwood Highway North and Garfield Drive from Washington Street to Wren Way. The work
includes the reconstruction including curb ramps,pedestrian crossings,and bike facilities.
Estimated
FY Street Name Begin End Description RMRA Construction useful Life
Priority Completion
(years)
23/24 North McDowell Blvd.Complete Sunrise Parkway Old Redwood Highway North Cold Central Plant Recycling Yes 2023/24 20
Streets
23/241 Maria Drive Rainier Avenue McDowell Boulevard Full Depth Reclamation -Cement Yes 1 2023/24 1 20
23/24 Garfield Drive Washinton Street Wren Way Full Depth Reclamation -Cement Yes 2023/24 20
Pavement Restoration 24/25-(LSR-2025-5022) Project
Proposed Street List
Includes the design and construction of Casa Grande Road from Ely Boulevard to McDowell Boulevard South and Howard Street from West Street to A Street. The work includes the reconstruction
including curb ramps,pedestrian crossings,and bike facilities.
Estimated
FY Street Name Begin End Description RMRA Construction useful Life
Priority Completion
(years)
24/25 Casa Grande Ely Boulevard McDowell Boulevard Full Depth Reclamation Cement Yes 2023/24 20
24/25 Howard Street West St A Street Full Depth Reclamation Cement Yes 2023/24 20
7