HomeMy WebLinkAboutPLANNING COMMISSION RESOLUTION 2024-03 03/26/2024 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF ATTACHMENT 1 RESOLUTION NO. 2024-03 RESOLUTION OF THE CITY OF PETALUMA PLANNING COMMISSION APPROVING SITE PLAN AND ARCHITECTURAL REVIEW FOR THE GAKER-COSIN RESIDENCE PROJECT LOCATED AT 560 HAYES LANE, APN: 008-490-035; FILE NO. PLSR-2023-0011 WHEREAS, an application was received by property owners DJ Gaker and Emily Cosin requesting Site Plan and Architectural Review approval to construct a new single-family residence on an undeveloped 2.28-acre lot located at 560 Hayes Lane (APN: 008-490-035) (the "Project"); and WHEREAS, the Project is located within the West Hills subarea of the General Plan, is designated Low Density Residential in the current General Plan Land Use Map, and is zoned R-2 (Residential 2), which is an implementing zoning district of the Low Density Residential land use designation; and WHEREAS, the Project consists of construction of a new two-story, 30'-00" tall, three- bedroom with three-and-a-half bathrooms,detached single-family residence,with landscaping and other associated site improvements on an approximately 2.28-acre parcel; and WHEREAS, the application is subject to discretionary review before the Planning Commission as single lot development in the West Hills subarea due to the subareas hillside condition; and WHEREAS, public notice of the March 26, 2024, Planning Commission hearing was published in the Petaluma Argus-Courier and mailed to residents and occupants within 1,000 feet of the Project site in compliance with state and local law; and WHEREAS, a public hearing sign was posted on site consistent with the Petaluma Implementing Zoning Ordinance §24.100; and WHEREAS, the proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under Section 15303 (New Construction), which applies to the construction of one single-family residence located in a residential zone, and there are no cumulative impacts,unusual circumstances or other factors that would make the exemption inapplicable under CEQA Guidelines section 15300.2; and WHEREAS, the City complied with AB 52 tribal consultation requirements for the proposed project during which the City engaged in consultation with Graton Rancheria of Federated Indians and the project has been conditioned to comply with requirements resulted from the aforementioned consultation; for the proposed project; and WHEREAS,the Planning Commission held a duly noticed public hearing to consider Site Plan and Architectural Review for the Project on March 26, 2024, at which time all interested parties had the opportunity to be heard; and DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Attachment 1 March 26,2024 Gaker-Cosin Residence SPAR—560 Hayes Ln. WHEREAS, at said hearing, the Planning Commission considered the staff report, dated March 26, 2024, and all public testimony provided prior to and at the public hearing. NOW THEREFORE,BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF PETALUMA AS FOLLOWS: A. The foregoing recitals are true and correct and incorporated herein by reference. B. Based on its review of the entire record herein,the Planning Commission makes the following findings: California Environmental Quality Act The proposed project is categorically exempt from the provisions of CEQA under Section 15303 (New Construction) which applies to construction of one single-family residence located in a residential zone and there are no cumulative impacts, unusual circumstances or other factors that would make the exemption inapplicable pursuant to CEQA Guidelines section 15300.2. As such, the project complies with CEQA. General Plan a. The Project is consistent with the Low Density Residential General Plan Land Use Designation in that it provides a residential project on a property designated for residential uses with a density range of 2.6 to 8.0 dwelling units per acre. b. The Project is, for the reasons discussed in the March 26,2024 Planning Commission staff report, consistent with the following General Plan policies: Policy 1-P-2 Use land efficiently by promoting infill development, at equal or higher density and intensity than surrounding uses. Policy 1-P-3 Preserve the overall scale and character of established residential neighborhoods. Policy 1-P-16 Allow development in hillside areas that preserve ridgelines and are site sensitive. Policy 2-P-62 Preserve the rural aspect of the area by maintaining the existing density (Rural, Very Low and Low Residential) and land use patterns. Implementing Zoning Ordinance c. The project is consistent with Implementing Zoning Ordinance Section 16.060(K), in that, all required findings for single lot development in a hillside area can be made as follows: ■ The project is consistent with the objectives, standards, and guidelines of the Hillside Ordinance, Section 16.060(H), in that it conforms to the natural topography of the site which at some viewpoints makes it appear single story and minimizes grading to only those areas proposed for development. In addition, the architectural design of the structure is consistent with the guidelines of the Hillside Ordinance, specifically Section 16.060(I),in that it reduces the overall bulk and mass using grated stair railings, varied roof slopes and heights, simple building design, existing vegetation to screen the residence and proposes colors and materials which conform to the natural hillside environment. Planning Commission Resolution No. 2024-03 Page 2 of 11 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Attachment 1 March 26,2024 Gaker-Cosin Residence SPAR—560 Hayes Ln. ■ The proposed structure conforms to the 30-foot height limit specified in the Hillside Ordinance, is sited to avoid privacy conflicts, and proposes a farmhouse design compatible with the surrounding neighborhood's varied architectural styles. As such, the proposed residence is compatible and complementary with the surrounding neighborhood regarding scale, design, and siting. ■ The residence is situated on the upper southeastern portion of the lot and proposes to maintain the western portion in its current natural state and retain all existing and protected trees on the lot. Although the lot is larger than other developed properties in the neighborhood, the structure's siting is considerate of the site's natural topography and is positioned closer to Hayes Lane and the other residential structures in the neighborhood. As such, the design and layout of the project respect and protect the natural environment, consistent with this finding. ■ Grading on the site will be minimal and is limited to the areas proposed for development including circulation improvements and the building. The proposal includes retaining walls varying from 1.5 feet in height to a maximum of 4.5 feet along the carport. As such, the project is consistent with this finding. d. The project is consistent with Chapter 17, Tree Preservation of the Implementing Zoning Ordinance, in that measures for protected trees have been incorporated as conditions of approval in Exhibit 1, contained herein. e. The project is consistent with the Municipal Code Chapter 17.14 in that the applicant sought and received approval from the building official for an exemption from certain visibility requirements outlined in Section 17.14.150. f. The project is consistent with Implementing Zoning Ordinance Section 24.050—Site Plan and Architectural Review, in that all required findings in Section 24.050(E) can be made as follows: ■ The project proposes using colors and materials that work harmoniously with the overall design of the building and complement the hillside environment of the site. The farmhouse- style residence includes vertical siding, varied roof slopes, a subdued color pallet, black trim window casings, gooseneck lighting, a permeable paver (turfstone) driveway, and a corrugated roof. Therefore, the project is consistent with this finding. ■ The proposed residence features a pitched roof,board and batten siding, exterior staircase, a deck and stucco which are design elements that are characteristic of the neighborhood and appropriate for the hillside lot in that the combination of materials break up the building plane and reduce the building mass. As such, the architectural style and design of the residence is appropriate and compatible with the overall neighborhood and is consistent with this finding. ■ The residence is located on a 2.38-acre lot within a low density residential neighborhood characterized by single-family homes on smaller lots. Although the project site is larger than other developed residences in the neighborhood, the siting of the structure is situated closer to the public right of way(Hayes Ln)and the other residential structures to the south, which reduces the need for additional hard surfaces and grading on the hillside and allows the structure to be nestled between the existing trees and shrubs which are further used as screening. The proposed siting is consistent with the applicable setbacks while responding Planning Commission Resolution No. 2024-03 Page 3 of 11 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Attachment 1 March 26,2024 Gaker-Cosin Residence SPAR—560 Hayes Ln. to the site's natural topography. As such, the project is consistent with this finding. ■ The project does not propose any signs or advertising structures as it is a residential development, and therefore is not subject to this SPAR finding. ■ The bulk and height of the structure have been designed similar to the bulk and height of other structures in the immediate neighborhood, which feature two-story residences with varying roof heights and attached garages with main levels above. The residence utilizes light facade colors and a darker roof,similar to surrounding residences and compatible with the surrounding natural setting. Massing in conjunction with siting on the hillside lot minimizes visual obstruction. As such, the project is consistent with this finding. ■ The project does not propose any removal of trees and the work site avoids all tree trunks. The only trees near the proposed building site are relatively small and can be easily preserved using standard precautions (protective fencing at dripline). The proposed landscaping is minimal and consists of ten fruit trees to the north of the residence. As proposed, the project is consistent with this finding. ■ The residence will be accessed by a new driveway that will connect to the existing public right of way on Hayes Lane. One covered parking space will be provided within the carport with two additional uncovered parking spaces provided in tandem within the driveway. The proposed driveway has been designed consistent with applicable City standards. As such, the project is consistent with this finding. ■ The design is thoughtful of the existing building and the surrounding area and was prepared by architect Morse & Cleaver Architects Based on its review of the entire record herein, including the March 26, 2024, Planning Commission staff report, all supporting, referenced, and incorporated documents, and all comments received, the Planning Commission hereby approves Site Plan and Architectural Review to construct a new single-family residence and associated site improvements, subject to the conditions of approval attached hereto as Exhibit 1. Planning Commission Resolution No. 2024-03 Page 4 of 11 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Attachment 1 March 26,2024 Gaker-Cosin Residence SPAR—560 Hayes Ln. ADOPTED this 26th day of March 2024, by following vote: Commission Member Aye No Absent Abstain Bauer N Chair Hooper X McErlane X Vice Chair Racusen X Whisman X Vice Mayor Cader X Thompson Mozes X EocuSilsned by: hbptr 4/23/2024 saawrai... Blake Hooper, Chair ATTEST: APPROVED AS TO FORM: DocuSigned by: EDOcuftned by:�G td , 7--; 4/10/2024 ,1( a,(u4/10/2024 EdG9�b`�L8E6F zsaai,ssato-'z"._..� Andrew Trippel, Planning Manager Dylan Brady, Assistant City Attorney Planning Commission Resolution No. 2024-03 Page 5 of 11 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Exhibit 1 SPAR CONDITIONS OF APPROVAL GAKER-COSIN RESIDENTIAL PROJECT 560 HAYES LANE APN: 008-490-035 FILE NO.: PLSR-2023-0011 Planning Division 1. Plans submitted to the City of Petaluma for purposes of construction shall be in substantial conformance with the Architectural Plans on file with the Planning Division dated July 18, 2023, and the Civil Plans on file dated September 18, 2023, except as modified by these conditions of approval. 2. Prior to the issuance of any construction permits, these conditions of approval shall be included with the plan set. A copy of the approved plans shall be maintained on-site when construction activities are occurring. 3. The colors and materials shall be in substantial conformance with those noted on the architectural plans except as modified by these conditions of approval. 4. The day following approval, the applicant shall provide a check made payable to the Sonoma County Clerk, in the amount required and published by the Sonoma County Clerk to file the CEQA Notice of Exemption("NOE"). 5. Prior to issuance of a grading permit, the applicant shall submit materials delineating a non-development/non-disturbance zone on the construction drawings, subject to Planning approval and review by the Federated Indians of Graton. 6. If during the course of ground disturbing activities, including,but not limited to excavation, grading and construction, a potentially significant prehistoric or historic resource is encountered, all work within a 100-foot radius of the find shall be suspended for a time deemed sufficient for a qualified and city-approved cultural resource specialist to adequately evaluate and determine significance of the discovered resource and provide treatment recommendations. Should a significant archeological resource be identified, a qualified archaeologist shall prepare a resource mitigation plan and monitoring program to be carried out during all construction activities. Prehistoric archaeological site indicators include obsidian and chert flakes and chipped stone tools; grinding and mashing implements (e.g., slabs and handstones, and mortars and pestles); bedrock outcrops and boulders with mortar cups; and locally darkened midden soils. Midden soils may contain a combination of any of the previously listed items with the possible addition of bone and shell remains, and fire affected stones. Historic period site indicators generally include fragments of glass, ceramic, and metal objects; milled and split lumber; and structure and feature remains such as building foundations and discrete trash deposits (e.g., wells,privy pits, dumps). 7. Prior to building permit issuance or final inspection of building permits, all costs owed on the processing of this Site Plan and Architectural Review application shall be paid in full. 8. This approval is granted for and contingent upon construction of the project as a whole, in a single phase, with the construction and/or installation of all features approved and required herein. Modifications to the project, including but not limited to a change in Page 6 of 11 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Exhibit 1 construction phasing, shall require Site Plan and Architectural Review in accordance with IZO Section 24.050. 9. Prior to issuance of a building or grading permit, the applicant shall designate a project Disturbance Coordinator who will be responsible for responding to any complaints from the neighborhood about excessive noise during construction periods. A sign shall be conspicuously posted on the site regarding the allowable hours of construction and shall include the Disturbance Coordinator's telephone number. Proof of sign installation shall be provided to the Planning Manager prior to commencement of construction activities. Upon receipt of a complaint, the Disturbance Coordinator shall determine the cause of the noise complaint and take prompt action to correct the problem. 10. Except as modified by the conditions herein,both construction and post-construction operations shall comply with performance standards specified in Implementing Zoning Ordinance Chapter 21. 11. All exterior lighting shall conform to the standards at IZO 21.040 (D) (Glare). 12. This approval is effective for a twelve (12)month period unless the permit has been exercised or unless an extension of time is approved in compliance with IZO §24.050(K). 13. The applicant shall be subject to all applicable development impact fees in effect at time of building permit issuance. Said fees are due prior to issuance of a certificate of occupancy. 14. The site shall be kept clear at all times of garbage and debris. No outdoor storage shall be permitted. 15. All protected trees shall be protected during construction as outlined in the Arborist Report dated July 18, 2023, created by Urban Forestry Associates, Inc. 16. Upon building permit submittal for construction of the single-family residence, plans shall clearly demonstrate that the project will be all-electric with no new gas infrastructure, consistent with City Council Ordinance No. 2775. 17. Plans submitted for building permit shall demonstrate proper screening of mechanical equipment. 18. Any solar equipment,panels, or other collectors shall give the appearance of being built into the structure. Exposed supports and excessive lengths of exposed piping shall not be proposed. 19. All standpipes, check valves, and other utilities shall be placed underground or fully screened from view by decorative screening structures or landscaping to be reviewed and approved by the Planning Manager. 20. All grading activities shall be completed prior to the on-set of the rainy season(October 15th). Time extensions for short-term grading may be allowed at the discretion of the City Engineer. Special erosion control measures may be required by the City Engineer in conjunction with any specially permitted rainy season grading. 21. As determined by the City Engineer and/or Chief Building Official, all recommendations outlined in the Geotechnical Investigation dated January 25, 2021 (revised December 22, 2022)prepared for the subject property by RGH Consultants, including but not limited to, Page 7 of 11 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Exhibit 1 site preparation and grading excavation, seismic design, and foundations system design are herein incorporated by reference and shall be adhered to in order to ensure that appropriate construction measures are implemented. Final grading plan, construction plans, and building plans shall demonstrate that recommendations set forth in the geotechnical reports have been incorporated into the design of the Project. Nothing in this measure shall preclude the City Engineer and/or Chief Building Official from requiring additional information to determine compliance with applicable standards. The geotechnical engineer shall inspect the construction work and shall certify to the City, prior to issuance of a certificate of occupancy that the improvements have been constructed in accordance with the geotechnical specifications. 22. The latest BAAQMD recommended Best Management Practices (BMPs) to control for fugitive dust and exhaust during all construction activities shall be incorporated into all construction plans to require implementation of the following: a. All exposed surfaces (e.g.,parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. b. All haul trucks transporting soil, sand, or other loose material shall be covered. c. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer's specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper working condition prior to operation. h. Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District's phone number shall also be visible to ensure compliance with applicable regulations. 23. All machinery and vehicles involved in the construction of the project shall be properly maintained and shall be equipped with appropriate mufflers. 24. The applicant shall defend, indemnify, and hold harmless the City or any of its boards, commissions, agents, officers, and employees from any claim, action, or proceeding Page 8 of 11 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Exhibit 1 against the City, its boards, commissions, agents, officers, or employees to attack, set aside, void, or annul any of the approvals of the project, when such claim or action is brought within the time period provided for in applicable State and/or local statutes. The City shall promptly notify the applicants/developers of any such claim, action, or proceeding. The City shall coordinate in the defense. Nothing contained in this condition shall prohibit the City from participating in a defense of any claim, action, or proceeding and if the City chooses to do so appellant shall reimburse City for attorneys' fees by the City. Building Division 25. Proposed project will require building permit application and construction document approval in compliance with current California Building Standards Code in CCR Title 24 as adopted by the City of Petaluma. The Building Division reviews applications and plans in accordance with these and the City municipal code. The applicant will need to demonstrate compliance with the construction documents. Full plan submittal is required as applicable to project scope.Architectural,civil, structural, mechanical, electrical, and plumbing system drawings are to are to be prepared and signed by the state licensed professional responsible for their preparation. See City file preparations standards: Electronic File Preparation Standards - Petaluma (cityofpetaluma.org). Building permit construction documents are to include occupancy classifications, design occupant load, general building area and height limitations, type of construction, and fire sprinkler provisions data for each building on the subject parcels. Each separate building and separate parcel must have a separate permit for construction. 26. Effective June 16, 2021, new buildings are required to have all electric construction as defined in Petaluma Municipal Code 17.36 and permanent supply of electricity as the source of energy for all space heating, water heating (including pools and spas), cooking appliances, and clothes drying appliances, and has no natural gas or propane plumbing installed in the building. 27. For the 2022 Building Standards Code cycle the City of Petaluma has adopted CalGreen at the Tier 1 level, with the exception Energy Efficiency, which is adopted at the mandatory level only. Current code adoption at time of building permit application will govern requirements. 28. The City of Petaluma has adopted a Universal Access and Visitability Ordinance effective April 20,2022, applicable to new dwelling units. Due to the existing hillside lot conditions Visitability is to be provided to the maximum extent possible and with the intent that future improvements can be made to complete Visitability conditions. 29. Civil and grading plans in compliance with CBC Appendix J will be necessary for construction. Construction plans shall indicate how the site grading or drainage system will manage all surface drainage and water flows. Where a structure permit and plans include grading requirements in accordance with Appendix J, no separate permit is necessary. Construction plans shall indicate how the site grading or drainage system will manage all surface drainage and water flows. Page 9 of 11 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Exhibit 1 30. The subject property has a floor level located below the public sewer and requires compliance with the CPC Section 710 regarding applicable backflow protection, sump or receiving tank (with dual pump and alarm), and discharge line requirements. Provide appropriate general notes and details for work included in the public right of way. Where backflow protection, sump, or receiving tank are located on the subject property include notes to this effect and provide a detail in compliance with 710.4 specifying pressure rated piping material and the method of connection from the top of the horizontal public sewer pipe through a wye branch fitting. 31. This project is within the very high hazard fire severity zone and shall be compliant with CRC Section R337 or CBC Chapter 7A. 32. CRC R401.4 and CBC 1803.1 require soils investigation for foundation design in Petaluma based on local conditions. Such investigation is to be prepared by a state licensed civil engineer. The investigation shall indicate preparations, recommendations, and corrective actions to prevent structural defects for each lot and dwelling. Public Works &Utilities 33. Install driveway approach as per current Americans with Disabilities Act (ADA) requirements that provides a 4' wide ADA compliant sidewalk behind the driveway apron and connect new sidewalk to existing driveway. 34. The line from meter to backflow is to be flushed prior to setting backflow. If the initial test of the backflow by the city fails at the time of CO the contractor/developer will be charged for that time and the contractor/developer is responsible for the cleaning of the device. No CO will be signed off until the backflow passes the test. 35. The owner and contractor are responsible to perform Erosion Prevention and Sediment Control in accordance with chapters 15.80 and 17.31 of the City's Municipal Code and other applicable City of Petaluma regulations, and section 20 of the Caltrans Standard Specifications. Please submit the Construction Erosion and Sediment Control Plan Application Package. 36. Encroachment permits are required for all work within the public right of way or within a City Utility Easement. 37. Fire line service sizing and installation is subject to an approved underground permit from the Fire Prevention Bureau. 38. A separate permit is required from the fire department for the private fire line installation. 39. If applicable, any project with a landscape area of 500 square feet or greater shall submit to the City a complete landscape and irrigation documentation package consisting of all the required elements found in the Landscape Water Use Efficiency Standards located in the Petaluma Municipal Code (PMC) Section 15.17.050. 40. New water services shall be 1.5-inches in diameter with a one-inch meter. Page 10 of 11 DocuSign Envelope ID:216E1C18-8704-4857-BBBD-1D385E8DE3AF Exhibit 1 Fire Protection Bureau 41. Smoke and carbon monoxide detectors must be installed per the California Residential Code. Page 11 of 11