HomeMy WebLinkAboutPCDC Resolution 2011-16 09/19/2011 RESOLUTION NO. 2011 -16 PETALUMA COMMUNITY DEVELOPMENT COMMISSION ACCEPTING COMPLETION OF THE CONSTRUCTION CONTRACT FOR THE AUTO CENTER DRIVE EXTENSION PROJECT NO. C53101002 WHEREAS, in accordance with Section 68 of Article X of the City of Petaluma Charter, Section 20162 of the California Public Contract Code and other applicable law, the City of Petaluma solicited bids for the Auto Center Drive Extension Project ( "Project "), and, WHEREAS, bids for the Project were opened on September 29, 2010, in accordance with California Public Contract Code Section 4104.5 and other applicable law; and, WHEREAS, the apparent low bid for the Project was FEDCO Construction, Inc. in the amount of $557,391; and, WHEREAS, by PCDC Resolution No. 2010 -14, adopted on October 18, 2010, the PCDC approved the project budget of $1,485,000 with a contingency amount of $395,579, found the bid of $557,391 for the Project to be the lowest responsive bid, awarded the Project to FEDCO Construction in the amount of $557,391, conditioned on FEDCO Construction's timely executing the Project contract and submitting all required documents and authorized and directed the Executive Director to sign the Project contract on behalf of the PCDC, upon such timely submission; and, WHEREAS, consistent with the approved project budget and City contracting procedure, the Executive Director is authorized to execute on behalf of the PCDC any change orders and other amendments to the Project contract that were necessary to effectively complete the Project and /or to realize the Project and /or cost benefits for the PCDC, so long as such change orders or amendments were within the budgeted contingency amount; and, WHEREAS, the following contract change orders (CCO) affecting the Project amount have been approved: PCDC Resolution No. 2011 -16 Page 1 Change Description Amount Order # CCO# 1 Modify manifold water service $6,371.89 CCO #2 Move soil stockpile around to provide equipment access $7,368.12 CCO #3 Substitute drain rock bedding due to unsuitable subgrade $1,318.96 CCO #4 Substitute ductile iron pipe for sewer pipe $4,496.57 CCO #5 Delay /down time due to incorrect cleanout invert $1,222.75 CCO #6 Dewater site to allow construction of sewer & water mains $3,393.58 CCO #7 Add concrete cap to storm drain pipe $1,200.00 CCO #8 Staking the gas & diesel signs at Gas Outlet $300.00 CCO #9 Lime treatment of subgrade $85,045.00 CCO #10 Upgrade lime treatment material to high calcium lime $2,746.00 CCO# 1 1 Temporary stockpiling of excavated soils $768.14 CCO# 12 Temporary repair of unmarked sewer lateral $135.97 CCO# 13 Lower water main to clear conflict with storm drain $10,292.22 CCO #14 Re -route sewer lateral $16,048.97 CCO# 15 Replace two existing storm drain junction structures $26,122.12 CCO# 16 Credit for elimination of guard rail ($4,905.00) CCO# 17 Re- negotiate price of hydro seeding due to quantity variation in ($1,287.82) excess of 25% CCO# 18 Revise striping& signing $1,120.00 CCO# 19 Re- configure the driveway at Victory Chevrolet $46,344.51 CCO #20 Conform paving behind driveways $4,997.38 CCO #21 Credit for deletion of signal conduit & traffic signal loops [$3,264.00) Total change orders: $209,835.36 Sum of over -runs: $16,044.35 ; and, WHEREAS, the final contract amount, as amended, including all change orders, is $783,270.71; and, WHEREAS, the estimated total cost of the Project is $1,300,000, within the approved Project budget; and, WHEREAS, PCDC staff have inspected the Project and determined that it has been completed in accordance with the contract requirements, subject to completion of punchlist PCDC Resolution No. 2011 -16 Page 2 work and the Contractor's continuing warranty and other obligations pursuant to the contract; and WHEREAS, based on the foregoing, staff recommends acceptance of the Project on behalf of the City. NOW, THEREFORE, BE IT RESOLVED by the PCDC as follows: 1. The contract entitled Auto Center Drive Extension, Project No. C53101002, with the final contract amount of $783,270.71, is accepted as complete, subject to the Contractor completing the punchlist work prior to the release of the retention, and the Contractor's continuing warranty and other obligations pursuant to the contract. 2. The City Clerk /Recording Secretary is hereby authorized and directed to file a Notice of Completion concerning the Project with the Sonoma County Clerk's Office within ten (10) days of the date of this Resolution. 3. Staff are hereby authorized and directed to release all undisputed retention not subject to pending change orders within sixty (60) days of the date of this Resolution and in accordance with the terms of the Project contract, California Public Contract Code Section 7107 and applicable law. ADOPTED this 19th day of September, 2011 by the following vote: Commissioner Aye No Absent Abstain Albertson X Barrett X Chair Glass X Harris X Vice Chair Healy X Kearney X Renee X D s 'e David Glas air PCDC Resolution No. 2011 -16 Page 3 ATTEST: Ol cuLL) Claire Cooper, CMC, Recording cretary APPRO ii A TO FORM: 1 Eric W. Danly, General Counsel EXHIBIT 1 Project PCDC Funding for Other Funding in Source FY 2011 -2012 FY 2011 -2012 State Local Old Redwood Highway Interchange $1,258,000 $3,000,000 Partnership Funds (SLPP) Auto Center Drive Extension $177,000 $139,000 Prop 1B 101/E. Washington Interchange $1,1 12,000 $0.00 Rainier Ave. Crosstown Connector $1,356,000 $355,000 Traffic Mitigation Impact Fees River Trail - Washington to Lakeville $1,407,000 $283,000 Measure M TOTAL $5,310,000 $3,777,000 PCDC Resolution No. 2011 -16 Page 4