Resolution N®. 91-122 N.C.S.
of the City of Petaluma, California
1
2
3 A RESOLUTION OF THE CITY COUNCIL
4 OF THE CITY OF PETALUMA
5 ADOPTING SPECIFIC FINDINGS REGARDING
6 SIGNIFICANT ENVIRONMENTAL EFFECTS, MITIGATION MEASURES
7 AND ALTERNATIVES FOR THE PROPOSED
8 RIVER OAKS/FACTORY OUTLET VILLAGE PROJECT,
9 PURSUANT TO SECTIONS 15091 AND 15903 OF THE
10 CEQA GUIDELINES AND SECTION 21081 OF THE
11 CALIFORNIA ENVIRONMENTAL QUALITY ACT.
12
13 WHEREAS, the California Environmental Quality Act provides that all local agencies,
14 subsequent to the completion of an Environmental Impact Report, shall make one or more
15 written findings pursuant to Section 21081 of the California Environmental Quality Act and
16 Sections 15091 and 15093 of the CEQA Guidelines (14 California Code of Regulations);
17 and,
18
19 WHEREAS, the City Council of the City of Petaluma, by Resolution #90-420 adopted on
20 December 17, 1990, certified, approved and adopted the Final Environmental Impact
21 report for the RIVER OAKS/FACTORY OUTLET VILLAGE project:
22
23 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Petaluma
24 that in connection with the certification, approval and adoption of the Final Environmental
25 Impact Report on said project, hereby makes the following findings pursuant to Sections
26 15091 and 15093 of the CEQA Guidelines:
27
28 A. Potential impacts to soils and geology were identified as follows:
29
30 1. Site likely to be subject to strong ground shaking produced by earthquakes,
31 thereby possibly causing damage to structures.
32
33 2. Seasonal moisture fluctuation to subgrade beneath pavement, thereby
34 possibly resulting in cracking and/or structural problems if slabs/foundations
35 are constructed on native soils.
36
37 3. Corrosion of uncoated steel and concrete due to soil and other alluvial
38 material contact.
39
40 ~ The identified impact(s) will be mitigated to a level of insignificance by the
41 following measures to be incorporated into the project:
42
43 1. Utilization of proper design and construction techniques to minimize damage
44 from ground shaking:
45
Nes. No ............... ~............. N.C:S.
,- 4
2
4
6
8
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
a. Spread footings placed on properly compacted fill for buildings. Wall
and column footings should be at least 18 inches wide and placed at
least 18 inches below the lowest adjacent subgrade, subject to
checking by qualified professional and City staff.
b. Bridge abutment supports to gain primary support from end-bearing
in the mudstone bedrock underlying the alluvium at about 30 foot
depth, subject to checking by qualified professional and City staff.
2. Utilization of proper engineering techniques during design of excavation,
grading and site preparation improvements:
a. Mitigation of effects of expansive soils, including moisture
conditioning or excavation of expansion materials, with replacement
of non-expansive material, subject to review and approval of City staff.
b. Design of drainage system. to provide that no ponding of surface water
and runoff occurs, except where ponding occurs in parking area as
intended for stormwater management. Runoff from roofs shall be
directed away from structures and routed in a closed pipe to a suitable
outlet, collector or detention pond, subject to review and approval of
City staff.
3. Underground utility improvements shall be constructed of corrosion-resistant
pipes, materials subject to review and approval of City staff.
B. Potential impacts to flood control, drainage and water quality were identified as
follows:
1. Decrease in water quality of local runoff. due to high levels of urban
contaminants.
2. Stormwater runoff increase due to development of the site, thereby adversely
affecting up and/or downstream properties.
3. Alteration of the water surface elevation of the Petaluma River and Capri
Creek from existing conditions.
4. Channel ovoe o~ed d e elo mentathan under existing cond~itionsly on the site,
with the p p P
5. Possible erosion of river banks, thereby intruding into riparian buffer zone.
'The identified impact(s) will be mitigated to a level of insignificance by the
following measures to be Incorporated into the project:
Private streets and parking lots within the site shall be cleaned and swept
weekly to minimize the amount of contaminated runoff. Materials and/or
debris collected by cleaning activities shall be disposed of properly to Clty
staff approval. Stormwater detention facilities shall be designed to allow
settling of stormwater sediments. Collection and removal of sediments from
on-site detention facilities shall be undertaken by the developer/operator of
the Petaluma Factory Outlet Village as deemed necessary by City staff to
insure ongoing function of sediment collection system as long as the
2
collection system is in use for the proposed or any future land use on this
parcel. Said program shall identify cleaning schedule (including peak
cleaning demand periods prior to commencement of fall rains) and detail of
cleaning methods to be utilized for removal of hydrocarbon pollutants and
other debris from the driving/parking surfaces of the site. Sediments and
other material collected from the stormwater detention facilities and from
cleaning activities will be disposed of at appropriate waste receiving facilities.
A grogram shall be prepared by developer to set forth cleaning, and
sediment collection process and schedule for removal of possible
contaminants, subject to review and approval of City staff prior to issuance of
development permits.
2. Grading plans shall include provisions to avoid silt entering the Petaluma
River from graded areas during construction periods, subject to review and
approval of City staff. Grading plans shall include erosion control plan,
subject to review and approval of City staff. The erosion control plan shall
specify measures to reduce both short- and long-term erosion problems. The
plan shall address the following:
a. location of all areas where vegetation will be removed
b. location of fill
c. methods of stabilizing these areas es of ve etation and timing .for
d. areas to be revegetated, methods, typ g
revegetation after grading
e. methods to reduce runoff from graded areas
f, methods to avoid sediment accumulation in the storm drain system
3. Prior to any development on Parcel "B", environmental analysis shall be
undertaken including more specific potential impacts and mitigation
measures needed to minimize adverse impacts to Capri Creek, Petaluma
River riparian habitat, seasonal wetlands, or freshwater marsh. Mitigation
measures shall include preparation of a riparian enhancement plan, including
identification of creek setback based on environmental values. and hydraulic
constraints. It is recognized that implementation of mitigation measures for
preservation and enhancement of Capri Creek riparian habitat is dependent
upon cooperation of the land owner, Sonoma County Water Agency.
Prior to any development on Parcel "C", environmental analysis shall be
undertaken including more specific potential impacts and mitigation
measures needed to minimize adverse impacts to existing seasonal wetlands,
freshwater marsh and riparian habitats. Mitigation measures shall include
preparation of a riparian enhancement plan, including identification of
setbacks for protection and preservation of the existing habitat.
4. Development of the site shall be designed, in conformance with local City
standards and applicable FEMA constraints, and shall .result in no net
increase in flood elevations either upstream or downstream of the project
site. To avoid increases in peak flows downstream from the building and pad
area, all flows in excess of existing stormwater flows shall be detained onsite
for up to the 100-year recurrence interval storm. Outflow from the
stormwater detention facilities shall be regulated by a weir. The
configuration of the device shall be based on the 10-year, 25-year and 100-
year recurrence interval storms.
3
~~~~~~-~~~1Vr~
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
C.
No construction of buildings or placement of fill shall occur within the
floodway except as a~~roved for bank stabilization and/or erosion
protection. If said stabilization and/or protection work is proposed, work
shall be subject to review and approval of all appropriate regulatory and
advisory agencies.
The bridge, across the river, shall provide for a clear span over the floodway
and shall be designed for a minimum peak flow of 6,540 cfs. Design
constraints shall include balancing cut and;fill according to the City of
Petaluma zero net fill requirements and avoiding any increase in water
surface elevation in a 100-year event between the existing and with-bridge
configurations.
5. Setbacks from the top of bank of the Petaluma River may vary in depth with
an average in excess of 100' and a minimum area of 4 acres. Physical
improvements adjacent to the Petaluma River shall be undertaken in a
manner to restore and enhance, the riparian habitat of the River and to allow
limited passive recreational enjoyment of the river corridor, in conformance
with the details of im rovement and timing within the approved Biological
Mitigation Plan (BMP The BMP shall be subject to review and approval of
all appropriate regulatory agencies prior to issuance of the first development
permit and shall be implemented in accordance with said approved Plan.
The area adjacent to the Petaluma River, as identified within the approved
BMP as Zones A, B and C for restoration and enhancement, shall also be
referred to as the river corridor.
6. Hydraulic capacity of the Petaluma River adjacent to and/or throw h the site
shall be insured through the formation of a Landscape~Hydraulic
Maintenance Assessment District. Cost of formation shall be paid by the
developer of the Petaluma Factory Outlet Village to the City of Petaluma
with submission of the required petition prior to issuance of the first
certificate of occupancy. River corridor shall be offered to the City of
Petaluma, in fee, through an irrevocable offer of dedication prior to the
issuance of the first certificate of occupancy. Said offer of dedication shall
not inhibit or relieve the owner/operator/developer' of the Petaluma Factory
Outlet Village of the responsibilities of the five (5) year maintenance
requirement of the riparian enhancement program and improvements per
the approved BMP. It is the City's intent to accept dedication of the river
corridor and activate the Landscape/Hydraulic Maintenance Assessment
District upon completion of the planting improvements to insure monitoring
and maintenance is undertaken in compliance with the approved BMP.
Potential impacts to biological resources were identified as follows:
Parcel A (Petaluma Outlet Village):
1. Loss, isolation or substantial degradation of approximately 1 acre of seasonal
wetland habitat, a portion of which is identified as a vernal pool.
2. Loss or substantial degradation of approximately .1 acre (of which .04 acre
will be permanently occupied by bridge structure) of riparian scrub habitat.
3. Could result in indirect impacts in degradation of adjacent natural habitats.
4
~~®a ~ _4 ~ ~~ N C S
4. Impact to wildlife populations from introduction of short-term construction
noise, long-term artificial lighting and increased human activities within the
parking area, access route and riverwalk pathway.
Parcels B & C:
1. Loss, isolation and/or substantial degradation of up to .9 acre of seasonal
wetland habitat, 2 acres of riparian habitat and .1 acre of freshwater marsh
habitat along the Corona Creek remnant and seasonal wetlands in Parcel B
and the unnamed tributary in Parcel C and the Petaluma River.
2. Could result in indirect impacts in degradation of adjacent natural habitats.
3. Impact to wildlife populations from introduction of short-term construction
noise, long-term artificial lighting and increased human activities within the
parking area, access route and riverwalk pathway.
The identified impact(s) will be mitigated to a level of insignificance by the
following measures to be incorporated into the project:
Parcel A (Petaluma Outlet Village):
A rare plant survey has been completed by the developer, which was subject
to review and approval of the City of Petaluma prior to certification of the
Final Environmental Impact Report. In addition, a biological mitigation
plan (BMP) shall be prepared and implemented by the developer of the
Petaluma Factory Outlet Village to create an on-site or off-site native
riparian and seasonal wetland and vernal pool habitat in compensation for
removal and degradation of the on-site habitats and wetlands. The BMP
shall be prepared by a biologist in concert with a licensed landscape architect
and shall be subject to review and approval of the City of Petaluma staff and
SPARC in consultation with reviewing agencies, prior to the issuance of any
development permits. If an off-site replacement is proposed, specific input
and assistance on site selection shall be requested by the applicant and the
City from the Department of Fish and Game prior to SPARC review. It is
the intent of the City to comply with all Department of Fish and Game
regulations applicable to native riparian and seasonal wetland replacement.
The plan shall identify measurable objectives, site locations, site preparation
techniques, planting materials and methods, performance criteria, and
maintenance/monitoring strategies. The BMP shall also include design and
location of required interim fencing and signing to protect and identify
ongoing restoration work. The BMP shall include recommended schedules
for inspection of ongoing work by a qualified biologist to insure work is
progressing in accordance with said approved plan. The restored habitat
shall be monitored and maintained for a period of five years following
completion of the restoration, as determined by City staff. All costs
associated with the monitoring, maintenance and reporting including related
City administrative costs shall be paid by the developer of the Petaluma
Factory Outlet Village. Method of assurance of payment shall be to City
staff approval prior to issuance of the first development permit. Subsequent
monitoring and maintenance (after the five year establishment period) shall.
be undertaken by a Landscape/Hydraulic Maintenance Assessment District,
5
~~~e ~ -a ~ ~ ~? ~ AT rr n
which shall be formed. at the cost of the developer of the Petaluma Factory
Outlet Village, prior to the issuance of the first certificate of occupancy.
2. The approved BMP shall be fully implemented with all planting achieved
prior to issuance of the first certificate of occupancy. The developer of the
Petaluma Factory Outlet Village shall have the option of bonding for
required improvements that have not been implemented due to weather, or
improper planting periods, subject to City staff approval.
3. Construction activities shall incorporate standard erosion and invasive exotic
plant control measures to prevent degradation of adjacent habitats.
Replanting of disturbed and/or graded sites shall occur in accordance with
the approved Biological Mitigation Plan and to City staff approval.
4. Construction activity on the site shall be limited to 6AM to 6PM, Monday
through Saturday (non-holiday). Exception to the construction activity
limitation may be approved by the City Community Development Director
for extraordinary circumstances such as traffic control; building interior work
not involving construction vehicles; or non-noise generating activities.
5. All riverwalk pathway, parking lot and bridge lighting shall consist of
luminaries that do not attract night-flying insects and to minimize off-site
glare as set forth within the approved BMP, subject to SPARC review and
approval. The riverwalk pathway shall be designed to limit the points of
access to the river by humans to identified areas, providing for substantial
setback from the river along the remainder of the river frontage, subject to
SPARC review and approval.
6. On-site native vegetation and native riparian vegetation shall be retained to
the greatest extent possible and incorporated into project design, subject to
SPARC review and approval.
Parcels B & C:
1. A rare plant survey has been undertaken by the owners/developers in
conjunction with the study undertaken for Parcel A, which was subject to
review and approval by the City of Petaluma prior to certification of the
Final Environmental Impact Report. As development of any project on
Parcels B & C requires specific evaluation to address specific applicable
impacts and appropriate mitigation measures, no direct immediate impacts
are anticipated. Any development proposed for Parcels B & C shall be
subject to the PCD modification requirements set forth in Article 19 of the
Petaluma Zoning Ordinance. When further review occurs, particular
emphasis should be placed on the need to identify, protect and enhance areas
of significant features (trees, plants, water courses, etc.).
D. Potential impacts to traffic/circulation were identified as follows:
1. Significant increase in traffic to Petaluma Boulevard North and to the
boulevard intersections as follows:
a. Boulevard/Payran Street -Magnolia Avenue
b. Boulevard/U.S. Highway 101 southbound ramp
6
~~~~. ~ ~ ~_ ~ ~~ ~ N C S
c. Boulevard/Skillman Lane/Corona Road
d. Boulevard/Stony Point Road/Industrial Avenue
e. Boulevard/U.S.101/Old Redwood Highway = aggravation of the
existing need for signals.
f. Boulevard/new east/west overpass/interchange.
2. Increase need for an additional east/west overpass/interchange overpass and
on-off ramps with H101.
3. Increase demand for transit services
4. Increase need for collector road, as identified within the Petaluma General
Plan, in vicinity of River Oaks project site.
The identified impact(s) will be mitigated to a level of insignificance by the
following measures to be incorporated into the project:
Note: The mitigation measures set forth in this section do not correspond
numerically with the identified impacts section. Physical improvement conditions
shall be satisfied with timing and standards of construction subject to approval of
the Director of Engineering. Timing and method of payment of proportionate share
of improvements set forth as conditions shall be determined by the City prior to
issuance of development permits.
The Petaluma Factory Outlet Village shall contribute a proportional, fair
share, of traffic signal installation and/or upgrade costs at the following
intersections:
a. Petaluma Boulevard North at Stony Point Road/Industrial Avenue.
b. Corona Road at Industrial Avenue.
The proportional fair share contribution shall be based upon the project
related increase in PM peak hour traffic volume at the intersection, as
determined by the City Traffic Engineer and shall be incorporated into
project conditions of approval.
The following improvements shall be designed and installed, with all
associated costs to be paid by the Petaluma Factory Outlet Village
developer:
a. All necessary physical improvements and/or signal upgrades to the
Payran Street/Magnolia Avenue/Petaluma Boulevard North
intersection.
b. Shoulder widening (paving) and associated improvement adequate to
provide off-street bus pull-out area for two school bus stops along
Petaluma Boulevard North (just south of Jesse Lane, and just north of
Pine Tree Lane)..
7
Developer of the Petaluma Factory Outlet Village may request
proportionate reimbursement from previously constructed projects who
contributed to these .specific improvements and/or future developments
which are shown to have a proportionate impact to the need for these
improvements, subject to approval of the City Council.
Developer of the Petaluma Factory Outlet Village shall design and install the
following improvements, subject to review and approval of City staff and
other appropriate agencies, prior to issuance of the first certificate of
occupancy.
a. Installation of interim traffic signals at the Petaluma Boulevard
North/Old Redwood Highway/U.S. Highway 101 freeway southbound
and .northbound on-off ramps.
Developer's fiscal responsibility toward this overall improvement project
shall be limited to the proportionate fair share applicable to the projected
traffic volumes from the Petaluma Factory Outlet Village project.
2. The Petaluma Factory Outlet Village developer shall participate in the cost
of construction of the proposed collector street connecting the proposed
east/west overpass/interchange extension or other east/west overpass to
Corona Road. The amount of participation shall be determined through the
fundin mechanism put in place to fund the construction of said collector
road ~e.g.: assessment district). The Petaluma Factory Outlet. Village
developer shall execute a binding agreement, prior to issuance of a
development permit, acknowledging and agreeing to participate in said
funding mechanism to the extent of the appropriate proportionate fair share..
3. The Petaluma Factory Outlet Village shall provide, prior to issuance of the
first Certificate of Occupancy, a temporary secondary emergency and
construction vehicle access to Corona Road, until access is provided by the
completion of the required collector road.
4. The project developer(s) of the Petaluma Factory Outlet Village shall
contribute to the proposed east/west overpass/interchange and connectors
project overall project costs. To comply with this obligation, the Petaluma
factory outlet village developers have offered 1.2 million dollars. Method
and timing of payment shall be agreed upon between the developer and City
staff prior to issuance of the first development permit.
5. Bus pull-outs and bus stop shelters shall be provided on Petaluma Boulevard
North, one each for northbound and southbound traffic, in the vicinity of the
access drive concurrently with construction of public improvements for the
factory outlet village. Location and design shall be subject to City, Sonoma
County Transit and Golden Gate Transit staff review and approval.
6. The Petaluma factory outlet village developer(s) shall contribute toward the
costs of a City-wide TSM feasibility study (estimated 1991 cost of $20,000).
Amount of contribution shall be determined by the City Traffic Engineer
based on % of trips per day generated by project vs. total City-wide trips
prior to issuance of a development permit. Project specific TSM will stand
independent of City-wide study because of unique use of project site.
8
7. Specific, vicinity and area-wide impacts and mitigations associated with
proposed projects on Parcels B and C shall be identified and implemented
concurrent with environmental analysis of specific project proposals for these
sites. Development of Parcels A, B & C shall include provision. of mutual
parking and circulation easements prior to issuance of development permits.
8. The following modifications to Petaluma Boulevard North shall be
incorporated into public improvement plans and construction for the first
phase of development (Petaluma factory outlet village), subject to review and
approval of the appropriate reviewing agency (City and/or County):
a. The southbound to northbound U-turn lane along Petaluma
Boulevard North just north of the project access shall be eliminated,
modified and/or relocated. If eliminated, alternative improvements
to provide for turning movement needs of large rigs shall be
incorporated into the public improvements undertaken by the
Petaluma Factory Outlet Village developer, subject to review and
approval of City Traffic Engineer.
b. Lower foliage on the trees lining the southbound lanes of Petaluma
Boulevard North just north of the project access shall be selectively
thinned, subject to direction by a certified arborist selected by the City
and paid for by the developer of Parcel A, in order to provide clear
sight lines to southbound drivers to see the new signalized
intersection.
c. A northbound to southbound U-turn lane on the Petaluma Boulevard
North northbound approach to the Outlet Village access shall be
provided.
9. Public access easements shall be provided from Petaluma Boulevard North,
across the access bridge and extending along the project circular, frontage
road to provide access to shared property lines with Sonoma County Water
Agency land and Parcel C. Location and specifics of easements shall be
subject to City staff approval. Offer of easements shall be provided to the
City prior to the issuance of the first building construction permit.
E. Potential impacts to Visual Quality/Aesthetics were identified as follows:
1. Loss of views from Highway 101 and Petaluma Boulevard North to existing
open landscape of site.
2. Partial alteration of existing views of waterway corridor.
The identified impact(s) will be mitigated to a level of insignificance by the
following measures to be incorporated into the project:
Design of all proposed development shall incorporate the following:
a. Preservation of the natural features of the site, particularly the large
tree(s), and incorporation of the features into the development,
subject to SPARC review and approval.
9
b. Design development within the River Oaks project to reflect the
landscape, roof shapes, materials and colors to lend an agricultural
flavor to the development. The intent of the outlet village project is
to simulate the design of Petaluma's agricultural buildings and retain
Petaluma's rural agricultural image, and reduce apparent height, bulk
and mass of structures through the application of design principles
which integrate buildings with natural amenities.
2. The developer of the Petaluma Factory Outlet Village (Parcel A) will create
a riverwalk consistent with the approved BMP, which will include
enhancement of riparian habitat along the Petaluma River and provision of
public access for passive recreational activity, i.e., walking, biking, sitting.
The riverwalk will be designed to be extended through Parcels B and C at the
time those parcels are developed. The proposed riverwalk improvements
will be subject to review and approval by SPARC, with review and comments
from the Departments of Community Development, Parks and Recreation,
Police and the State Department of Fish and Game.
3. Any existing overhead and all proposed utility lines traversing, adjacent to
and/or serving the project sites shall be undergrounded as development
occurs (except where utility lines cross the River under the bridge), unless
exempted by City code, to reduce visual and aesthetic impacts.
F. Potential impacts to Public Services were identified as follows:
Water Service:
Need to update Water Master Plan which does not provide for intensity of
proposed project.
1. Project requires major line extensions to sustain fireflow demands of 2,500 to
5,000 gallons per minute.
Sewer Service:
1. Need to update Sewer Master Plan which presently shows low-intensity uses
on the site.
Note: Since preparation and distribution of the Draft Environmental Impact
Report, the City has undertaken the replacement of the pump at the
Wilmington Pump Station with a larger pump which is adequate, at this time,
to handle anticipated project flows.
3. Potential cumulative impacts to trunk line and plant capacities.
Police Protection:
Generates need for additional police services at buildout of project site.
Fire Protection:
1. Project generates need for extension of water mains and installation of
hydrants and associated improvements to provide adequate fire flows to meet
fire suppression needs.
10
1
2 2. Peak fl o erflownlnt lghelparking area, thereby ctrea ing potent al ha and to
3 and/o
4 life and/or property.
5
6 3. Shlatst n res one and/or evacuagon times entry point into site could create
7 de Y P
8
9 4. Additional traffic on Petaluma Boulevard North, generating need for signa
10 at entry point, could cause significant delay to through traffic movements by
11 emergency vehicles.
12
13 Telephone/Gas/Electric/Solid Waste
14
15 1. Generates need to extend existing facilities to serve site.
16
17 2. Need to provide adequate on-site areas to insure operation of a successfu
18 recycling program.
19
20 The identified impact(s) will be mitigated to a level of insignificance by t e
21 following measures to be incorporated into the project:
22
23 Water Service:
24
25 1. The applicants/developer(s}, of the River Oaks project site (Parcels A, B an
26 C), shall be responsible for submission of relevant information and
27 calculations for the updating of the Water Master Plan, prior to issuance of
28 any development permits, to lnsure provision of adequate water service for
29 the proposed project as well as the properties within the potential service
30 area under the general plan and zoning land use designation, subject to
31 review and approval of Clty staff. The possible need for looping of the
32 present water main system shall be determined as a function of this plan
33 update.
34
35 2. Applicants/Developer(s), (Parcels A, B and C), shall be responsible for the
36 extension of all water mains needed to serve that specific project site,
37 providing sizing as dictated by the Director of Engineering. Extension
38 improvements shall include provision of stub-outs to property lines for future
39 extensions as deemed appropriate by the City of Petaluma to serve future
40 needs. A payback agreement may be requested by the developer to provide
41 for proportionate reimbursement from remaining River Oaks projects and
42 other future development benefitting from utility line extension and upsizing
43 beyond those improvements needed to serve the remaining projects, subject
44 to approval of the City Council.
45
46 Sewer Service:
47
48 1. The developer(s), of the River Oaks project site (Parcels A, B and C), shal
49 be responsible for the submission of relevant information and calculations
50 for updating of the Sewer Master Plan, prior to issuance of any development
51 permits, to lnsure provision of adequate carrying and servicing capacity for
52 the proposed project and surrounding sewer basin, subject to review and
53 approval of City staff.
54
11
1 2. Developer(s), of the Petaluma Factory Outlet Village shall be responsible for
2 all main extensions to serve that specific project, including pump stations
3 (excluding new pump stations beyond that which is required for development
4 of Parcels A, B and C), to be sized and designed to handle sewage flow from
5 the service sub-area boundaries (specifically CS8 and CS9, City of Petaluma
6 Sanitary Sewer Master Plan). Sewer line shall be extended to the project
7 boundaries at Petaluma Boulevard North, and utility easements for a future
8 pump station site shall be granted, to provide for extensions without future
9 disruption to developed properties within the River Oaks area. A payback
10 agreement may be requested by the developer to provide for proportionate
11 reimbursement from future development benefitting from utility line
12 extension and pump station upsizing beyond capacity needed for the River
13 Oaks projects, subject to approval of the City Council.
14
15 Police Protection:
16
17 1. Incorporation of Police Department recommendations into development
18 improvements, including but not limited to:
19
20 a. Provision of secondary access point to serve project(s).
21
22 b. Location of security office on an outside perimeter line of the project,
23 to all extent possible (Factory Outlet).
24
25 c. Inclusion of routine crime prevention features into project (Factory
26 Outlet) such as lighting, vandal resistant fixtures, locks.
27
28 Fire Protection:
29
30 1. Provision of adequate water main extensions to provide necessary fire flows.
31 Developer of the Petaluma Factory Outlet Village shall be responsible for
32 the installation of all required fire hydrants and related improvements,
33 subject to review and approval of City staff:
34
35 2. A relocation plan shall be developed by the Factory Outlet Village
36 proponent to include an early warmng device, monitored by the on-sate
37 security to provide a timely evacuation of persons and/or vehicles at time of
38 inundation of the parking area(s). Relocation plan shall be subject to review
39 and approval by City staff prior to issuance of the first certificate of
40 occupancy. An indemnification agreement, subject to approval of the City
41 Attorney, shall be executed prior to issuance of the first Certificate of
42 Occupancy to hold harmless the City in the event damage or loss of life
43 occurs in spite of or due to failure of the relocation plan.
44
45 3. A temporary emergency access road from development areas shall be
46 constructed, to provide for emergency ~ evacuation needs. Timing of
47 improvements, location and design shall be subject to City staff review and
48 approval. The temporary access road maybe eliminated, subject to City staff
49 determination, at such time as the collector road is constructed and available
50 for public access.
51
52 4. Project applicants shall purchase a transmitter and radio equipment to allow
53 emergency vehicle override of the new signal at Petaluma Boulevard North
54 and the project access. Timing of purchase and specific brand of equipment
12
~~~~. 9 ~ ®~ ~ ~ ~ C
shall be as deemed appropriate by the City Fire Chief and shall be completed
in conjunction with signal improvement installation.
5. All projects shall be required to meet current Building and Fire Code fire
protection requirements, in effect at time of building permit issuance, subject
to City staff review and approval.
Telephone/Gas/Electric/Solid ~1Vaste:
1. All required utility facilities shall be extended to serve the project site, at the
cost of the developer of the Petaluma Factory Outlet Village, or whichever
River Oaks project to first obtain development permits. All existing and new
utility lines serving or crossing the project site shall be converted to and/or
installed underground, except where lines cross the Petaluma River under
the bridge crossing. Public improvements shall include providing stub-outs to
project boundaries, as deemed necessary by City and utility company staff, to
avoid disruption of developed areas in the future.
2. A recycling program shall be developed by the Factory Outlet Village
developer to provide for adequate, convenient facilities to promote an active
tenant recycling program, subject to SPARC review and approval (with
review and comments requested from the local waste management company)
prior to issuance of first certificate of occupancy. If local, regional or state
guidelines are adopted which relate to improved recycling procedures, the
project shall comply with all applicable measures.
G. Potential impacts to Fiscal/Economic were identified as follows:
1. Increase to existing demands on municipal services and existing public
improvements.
2. Potential loss of revenue to existing retail businesses.
3. Potential reduction in available employment generating business
opportuiuties.
The identified impact(s) will be mitigated to a level of insignificance by the
following measures to be incorporated into the project:
The payment of Community Facilities Impact Fees by all development within
the River Oaks project site.
2. The payment of proportionate, fair share contributions by the developers of
the Petaluma Factory Outlet Village to offset identified impacts to specific
public facilities (e.g.: signalization and roadway improvements, public utility
upgrading, etc.).
3. Defining minimum percentage requirement for occupancies within. Petaluma
Factory Outlet Village to be manufacturer's outlets.
4. Consideration of providing restrictions or minimum re ttirements for
proposed development on Parcels B and C to encourage and/or require high
employment uses.
13
H. Potential impacts to Noise Quality were identified as follows:
1. Generation of noise during construction periods.
2. The DEIR concludes that "As the project site develops noise levels should be
monitored along Petaluma Boulevard North to determine potential impacts
upon rural residences. If necessary, noise walls and other sound buffers
should be constructed to minimize potential noise impacts. If such sound
buffers are demonstrated to be necessary or desirable, the developers of the
Petaluma Factory Outlet Village and River Oaks should contribute a
proportionate share of the cost of such buffers. It should be noted, however,
that the proposed project in itself does not precipitate the potential noise
problem. All development contributes to the increase of traffic along arterial
streets and the accompanying noise impacts on houses on or near those
arterial streets. Also, long stretches of walls along streets without room for
adequate landscaped setbacks can present a dreary streetscape.
The identified impact(s) will be mitigated to a level of insignificance by the
following measures to be incorporated into the project:
1. Limit of construction hours and days, as previously noted in listed mitigation
measures.
I. Potential impacts to Air Quality were identified as follows:
1. Increased traffic emissions from additional traffic generated from developed
project site.
2. Increase of dust particulates during construction phases.
3. Increase of noticeable odors in vicinity of developments.
The identified impact will be mitigated to a level of insignificance by the following
measures to be incorporated into the project:
1. Payment, by the developer(s) of the River Oaks projects (including Parcels
A, B and C), of the City Traffic Facilities Mitigation Fee, in effect at the time
of building permit issuance.
2. The following construction practices shall be implemented for construction
of the Petaluma Factory Outlet Village project, subject to staff review and
approval:
a. Contractors shall water exposed dust generating surfaces in late
morning and at the end of the day. Additional watering activity may
be deemed necessary when wind speeds exceed 15 miles per hour.
b. Soil piles and/or other construction materials shall be protected by
berms, where deemed necessary by staff, to avoid spillage onto traffic
lanes.
c. Haul and/or construction roads shall be watered as frequently as
necessary for dust suppression.
~~S~e c~ 14 ~ `~ c N C S
d. All trucks hauling soils or similar dust generating material shall utilize
tarpaulins or sinularly effective covers to reduce dust generation along
routes traveled. If deemed appropriate in response to complaints
received by City staff, work areas shall be swept or washed down and
truck tires leaving the site shall be hosed off to avoid tracking of
debris off the site.
e. Disturbed, graded, or exposed soil areas shall be replanted or paved
as soon as practical.
f. The developer of the Petaluma Factory Outlet Village shall designate
a job superintendent or responsible person to monitor the above dust
control program, authorized to order increased watering, if deemed
necessary by City staff.
g. All restaurants located on the project site (Petaluma Factory Outlet
Village) shall utilize processes that .insure compliance to BAAQMD
Regulation No. 10 and City performance standards relative to odor
emissions.
J
The identified impact(s) will be further addressed on a City-wide basis b~ City
Council discussion and consideration of the following measures during review of
specific projects:
1. Direct staff to assess feasibility of the formulation and implementation of a
City-wide TSM program, requiring developments to participate in financing
the feasibility study, plan formulation or implementation costs.
2. Identification of possible locations for light rail transit and related shuttle
service facilities. This may be particularly applicable to development of
Parcel B.
3. Identification of possible locations for development of park-and-ride lots.
Potential impacts to Energy were identified as follows:
Short-term significant use of energy during construction periods; and long-
term consumption from operation and maintenance of development.
The identified impact(s) will be mitigated to a level of insignificance by the
following measures to be incorporated into the project:
Project shall comply with California Energy Code Title 24.
K.
2. Project shall be designed to utilize solar exposure to assist heating and/or
cooling of buildings, to all extent possible and to incorporate use of energy-
efficient building materials and energy-conserving features. Project shall be
designed to provide for natural ventilation and lighting, to all extent possible.
Potential impacts to Agricultural Issues were identified as follows:
1. Permanent loss of agricultural land.
15
1 The identified impact(s) will be mitigated to a level of insignificance by the
2 following measures to be incorporated into the project:
3
4 1. Restriction of urbanized development to areas set forth within the Petaluma
5 Urban Limit Line, thereby insuring continuing protection of outlying
6 agricultural areas (see also biological resources, visual quality/aesthetics
7 sections).
8
9 L. Potential onsite and offsite alternatives were identified as follows:
10
11 Onsite alternatives
12
13 1. No project
14
15 2. Higher Density (Regional Shopping Center)
16
17 3. Reduced Density (Business Park)
18
19 4. Kortum/Waxman Concept Plan
20
21 Offsite alternatives
22
23 5. W. Railroad Avenue/Stony Point Road site
24
25 6. McDowell Boulevard North
26
27 7. Willey Creek (Sonoma Wine Country Gateway)
28
29 BE IT FURTHER RESOLVED THAT in accordance with Section 21081(c) of the
30 California Environmental Quality Act and Section. 15091(a)(3) of the CEQA Guidelines,
31 the above alternatives are found to be infeasible due to economic, social, environmental,
32 legal, technological and other factors:
33
34 1. No Project. This alternative provides little or no potential for increased
35 revenue generation for the City of Petaluma from either sales tax or property
36 tax. This alternative would not meet the City's goal of increasing
37 employment. This alternative would provide no way of paying for riverwalk
38 amenities. This alternative is contrary to the General Plan's designation of
39 this site for urban development.
40
41 2. Higher .Density (Regional Shopping Center). It is unlikely that this
42 alternative would be economically viable in this location due to inadequate
43 retail market demand related to retail competition from the new Rowland
44 Plaza in Novato and existing retail. centers in Santa Rosa and Corte Madera.
45
46 3. Reduced. Density (Business Park). This alternative would not provide the
47 City of Petaluma with a significant amount of sales tax or property tax
48 revenue increase in contrast to the proposed project.
49
50 4. Kortum/Waxman Concept Plan. Some of the property included in this
51 alternative is not owned or controlled or otherwise available to the project
16
~~®e ~ ~ ° .~ `? `~ N C ~
developers. Delaying the development of the project until after the City
completes the River and open space plan, as proposed by the proponents of
this alternative, could jeopardize the financial feasibility of the project. With
an expanded river corridor and other design changes, this alternative could
reduce the area allowed for the outlet village project which could result in
the project being financially infeasible. The applicant states that based on
prior experience, 190,000 to 200,000 square feet is necessary to finance and
maintain a successful project of this kind. Some vendors require being in a
complex of that size to even consider leasing space. In addition, the
substantial up-front costs to build require a certain square footage to assure
lenders that the completed project will generate revenues that can sustain the
total project financing costs. This alternative's placement of the outlet village
on Parcel C would require fill of wetlands on Parcel C that the Draft EIR
recommends for protection.
5. W. Railroad Avenue/Stony .Point .Road site. This alternative site is not
owned, controlled or otherwise available to the project developers. This site
is under Williamson Act (agricultural land) contract and the Sonoma County
band Trust holds a conservation easement over the site. The site lies entirely
outside of the City of Petaluma city limits and outside of Petaluma's Sphere
of Influence boundary. This site is designated in the Sonoma County general
plan as a "Community Separator" to provide space between urban areas and
to retain Sonoma County's countryside atmosphere with low-density rural
uses, predominantly agriculture and open space.
6. McDowell Boulevard North. This site is not owned, controlled or otherwise
available to the project developers. This site has adjacent land uses that are
less compatible and less aesthetically desirable than those of the project site
or project to be on the project site. This site does not offer the opportunity
far a riverwalk as part of the project nor does it offer the appropriate setting
for a farm structure design theme. Development of this site requires
construction of the east/west overpass/interchange to relieve congestion on
Washington Street and McDowell Boulevard. Development of this site
requires substantial up-front costs to resolve access and transportation issues.
7. Willey Creek (Sonoma Wine Country Gateway). This site is not owned,
controlled or otherwise available to the project developers. This site has
several parcels with multiple ownerships and multiple potential developers,
making the development more complicated. This site is only 21.7 acres and
would not accommodate the outlet village and other compatible uses
anticipated in the overall River Oaks project. Development of this site
would be constrained by onsite utility easements. The parcel size and shape
would not lend itself to the clustered, village design proposed by the
developers of the Petaluma Factory Outlet Village.
In conclusion, the following irreversible adverse impact is identified that cannot be
significantly a?leviated by the mitigation measures recammerded in the repart:
1. Agricultural Land. Conversion to non-agricultural uses will have a small but
irreversible impact on the City's and region's inventory of agricultural land (see
Section IV. K. of the DEIR).
17
~~'~~ ~ - ~ ~ ~. ~ N C S
1 BE IT FURTHER RESOLVED THAT in accordance with Section 15093(b) of the CEQA
2 Guidelines, the adverse impact identified above can be found acceptable based on the
3 following overriding considerations:
The project site is and has been within the recognized General Plan Urban Limit
Line and, therefore, considered by the City as sultable for urban development at
some point in time consistent with the General Plan and related City development
policies. The site was not designated for either open space or agriculture but for
lndustrial development similar in intensity to the proposed project.
2. The City's policy decision reflected in the previous statement recognizes that some
loss of agricultural land, such as would result from the development of the proposed
project, is acceptable in order to achieve the social and economic benefits
associated with urban development of agricultural land. Such benefits in this
instance include the net positive fiscal impact to the City from retail development
which generates sales taxes. The resulting revenue stream to the City may be used
to fund capital improvements and social service programs benefitting residents and
businesses within the City.
20 BE IT FURTHER RESOLVED THAT implementation of the specific findings of
21 mitigation contained herein shall be accomplished through the conditional approval of the
22 PCD Master Plan Program for the River Oaks/Petaluma Outlet Village project and hereby
23 incorporates, by reference, the Resolution setting forth said conditional approval.
24
25
26 rofindin /ro disc2
Under the power and authority conferred upon this Council by the Charter of said City.
REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Approved as to
Council of the City of Petaluma at a (Regular) (Adjourned) (Special) meeting ā------~,b form
on the ......~i .................. day of ...---.May............................................., 19...x.1., by the - ' -
following vote.: .. ~ā¢.._..:.
City Attorney
AYES: Read, Davis, Woolsey, Sobel, Vice Mayor Cavanagh, Mayor Hilligoss
NOES: Nelson
ABSENT: ~ ~~ ~~{¢--,, ~
ATTES'T' : .............~{.1..c.e~I...IrC~ . .. ...........---........................ ........:..
City Clerk g ~ /~ /~1 ~`g~ Mayo
CA 10-85 ®~~1.~'~'iā~~ R..~E.~.~~~ cNilFi19.1~~.2~......-[v.C.s.