HomeMy WebLinkAboutResolution 91-018 N.C.S. 01/22/1991ReS®luti®n N®. 91-18 N.C.S.
of the City of Petaluma, California
1 RESOLUTION ESTABLISHING WATER CONNECTION FEES
2 FOR PRESSURE ZONE IV AND ZONE I
3
4
5
6
7 WHEREAS, the City is constructing a new water system
8 pressure Zone IV in order to provide water service above a 60 foot
9 elevation east of Ely Blvd. and in the Corona-Ely Specific Plan area, and
10
11
12
13 WHEREAS, the new improvements will use a portion of the
14 existing Zone I facilities and will improve the remaining Zone I storage
15 capacity, and
16
17
18
19 WHEREAS, the financing of the improvements are funded
20 from previously collected connection fees for Zone I improvements and a
2.1r , new debt issue to be repaid from special connection fees applied to new
2~ development in Zone IV and the in Zone I;
23
24
25
26 NOW, THEREFORE BE IT RESOLVED by the City Council
27 of the City of Petaluma that the following water service special connection
28 fees~b,e established pursuant to Section 15.08.010 of the Petaluma
29 Municipal Code:
Under the power and authority conferred upon this Council by the Charter of said City.
REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Approved as to
Council of the City of Petaluma at a (Regular) (AC$,~~T~~K~$$~~ meeting f °~
on the 2-2nd__.•.-.-.-_,._. day of ...........Jrall.Ur~1:~ 19..x.1.., by the
following vote:
ity Attorney
AYES: Read, Davis, Sobel, Nelson, Vice Mayor Cavanagh, Mayor Hilligoss
NQES: ~
ABSENT: So ~ el
ATTEST : .. ................................................................. ......... ......:...
City Clerk Mayor
(bunch File ....................•--.°•-•---•-•-
CA 10-85 Res. No. ... 9.1....1 ~............ N.C.S.
..
`' ~ 1 1 F:or connect'i~on to Zone .IV water service as determined; by the Director
2 of Public` Works:
3
4 1~%i'eter
~ _ Zone .IV
5. ~
Size ~ Special
6 In Meter Connec:t~on
7 Incfies Type Fee
8
9
~
10 3/4 _ Displacement 3,435
. 11 1 D'is:placemen 5,840
12 ~ -11./2 ~ Displacement. 11,336
- 13 2 ~ ~ Displace~men:t ~ 18,206
14 2 Compound 18,206
15` 2, Turbine, 18,206.
.. 16 3 Di;splaeement, . ~ .~~ 34,350
' 17 3 Compound:.. ~ ~ 36,755
" 18 3~ ~ ~ Turbine 4.0;190
19 4 Compound * ~ .
20 4 Turbine ~ *
21 6 Compound ~. *
22~ 6 Turbn'e~ ~°
23 ~ ~ ~ Comp:ou~nd`. ~ ~ *
24
_
._
25 * T:o be defe_rmined by Director of Pubtic Works.
2b
~ ~.
,,
27 ~
2. For.connection to Zone-I water, service; as determined by the Director of
. `2:8 PubTic'Works:
29
_
' , 3,,0, Meter _ ~ -
.3:1 S;i'Ze, .. Zone I
.32 'In Meter - ~ C.onnection~
33 Inches Type Fee
~3~4
. -
35 _ -
3:6 3'./4 ~ ~ Disp aceme.nt 2;310
- ~ 37 1 °Dsplace`ment: 3'°,927
38 1 1/'2 Di'splaceme~nt , ~ 7,723
' . 39' ~ 2 Displacement. ~~` 12,423
4,0 2 ~ ~ Compound. ~ 12,423
4~1 ~ 2 Turbine 12,423
42.- 3 ~ Displaceme-nt 23,L00
~43 3 ~
~ Compound 24,717
44 3 Turbine 27,027
45
~ - 4 ~~ ~. Compound ~ *
4'6 4 ~ ~Turbm;e
47 6 Compound'
4.8 6 . _ - Turtine~ .. *
49 8 ~ Go.mpound ~ ~ *
50
51 * To be determined by Director of Public Works
'w .. ~;~_
~ _
1. 3. The zone connection fe;es.i`n paragraphs 1 and 2 above are estimated.
2 bas:e;d on:pro~ected 'development. The 'e.es w.i~ll..be reviewed and amended
3 from time to time. based' on actual developme;ni from:Dec'e'mbe,r 1990 and
4 revised ~projecte.d development.
.5
6
~ 4. The fees were es"t"imate'd wifh a.3/4 inch water meter capacity.equalling .
he
i
h
~
'
e
7 meter
w
es;ze o t
th t
ncreas
s
one resrd'ential dwe ling,unit. The fee i
8 in pr.op~oti'on to tfieincre:ased meter flow capacity from a 3/4 inch meter.
9
10
5. The r:evenue_s collected' from the fees a tablished by,'this':resolution shall
11
12 be u~sed'to pay for the debtM1serv~ice and the related.debt administrative
enses of the Certificates of Participation author-ized by Resolution 90-
ex
p
.
13 349 and capital improvements.
14
15
6. The fees established in this resolution shal''1 t~a~ke effect on January 23,
lb 1991. ~ _