HomeMy WebLinkAboutRESOLUTION 2024-068 N.C.S. 06/03/2024 DocuSign Envelope ID:615B504C-56D7-477F-905B-9178294BB6CE
Resolution No. 2024-068 N.C.S.
of the City of Petaluma, California
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PETALUMA TO APPROVE THE
PROPOSED PROJECT LIST FOR FISCAL YEAR 24/25 FUNDED BY SB 1: THE ROAD REPAIR
AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of
2017), was passed by the Legislature and Signed into law by the Governor in April 2017 to address the
significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the
City of Petaluma are aware of the projects proposed for funding in our community, which projects have been
completed each fiscal year; and
WHEREAS, the City of Petaluma must adopt by resolution a list of projects proposed to receive fiscal year
funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include
a description and the location of each proposed project, a proposed schedule for the project's completion, and the
estimated useful life of the improvement; and
WHEREAS, the City of Petaluma will receive an estimated $ 1,530,832 in RMRA funding in Fiscal Year
2024/2025 from SB 1; and
WHEREAS,this is the FY 2024/2025 in which the City of Petaluma is receiving SB 1 funding and will
enable the City of Petaluma to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options for the
traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City of Petaluma has undergone a robust public process to ensure public input into our
community's transportation priorities/the project list; and
WHEREAS, the City of Petaluma used a Pavement Management System to develop the SB 1 project list to
ensure revenues are being used on the most high-priority and cost-effective projects that also meet
the community's priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City of Petaluma maintain and rehabilitate three major
collector roads that include active transportation infrastructure throughout the City of Petaluma this year; and
WHEREAS, the 2021 California Statewide Local Streets and Roads Needs Assessment found that the City
of Petaluma's streets and roads are in"Good" condition, and this revenue will help us increase the overall quality
of our road system and over the next decade to help keep our streets in"Good" condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure,
focusing on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge
technology, materials, and practices will have significant positive co-benefits statewide.
Resolution No. 2024-068 N.C.S. Page 1
DocuSign Envelope ID:615B504C-56D7-477F-905B-9178294BB6CE
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby:
1. Declares the above recitals to be true and correct and are incorporated into the resolution as findings.
2. Finds that the action of proposing and submitting a list of projects to be funded by RMRA funds is not a
"project"pursuant to the California Environmental Quality Act(CEQA)Guidelines Section 15378,as this
is a fiscal and administrative activity. If the City receives RMRA funds,the City will analyze the specific
projects for CEQA compliance. However, the use of the RMRA funds for the specific projects will likely
be categorically exempt pursuant to the California Environmental Quality Act and Title 14,the California
Code of Regulations ("CEQA Guidelines"), Section 15301(c), because the project consists of the repair,
maintenance, and minor alteration of existing public facilities involving negligible or no expansion of
existing or former use,including existing highways and streets, and the mitigation of pavement conditions
to enhance the safety for motorists and bicyclists. Accordingly, there is negligible or no expansion of use
beyond what currently exists,and there are no cumulative impacts,unusual circumstances,or other factors
that would make the exemption inapplicable.
3. Approves the proposed project, attached hereto as Exhibit A, for the use of RMRA funding for FY 24/25.
4. Directs the City Manager to submit the proposed project list to the California Transportation Commission.
5. Approves a quarterly budget adjustment to appropriate RMRA funding and carries forward unused budget
appropriations from the prior year to FY 24/25.
Under the power and authority conferred upon this Council by the Charter of said City.
REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Approved as to
Council of the City of Petaluma at a Regular meeting on the 3rd day of June DocuSigned€grm:
2024,by the following vote: FAQ,
ity Attorney
AYES: McDonnell,Barnacle,Cader Thompson,Healy,Nau,Pocekay,Shribbs
NOES: None
ABSENT: None
ABSTAIN: None
DocuSigned by: uSigned
�by:
ATTEST: FIT�`�y/ ��
City Clerk Mayor
Resolution No. 2024-068 N.C.S. Page 2
DocuSign Envelope ID:615B504C-56D7-477F-905B-9178294BB6CE
Exhibit A
Exhibit A - Project List
r
City of Petaluma,Department of Public Works and Utilities
202 N.McDowell Blvd,Petaluma,CA 94954
Department Contact: Jeff Stutsman
City Project Number: C16102139
Legislative District: 2"d
Avg.Network PCI(4/16/24): 2024:PCI=54
Fiscal Year: 24/25
Pavement Restoration 24/25(LSR-2024-5022) Project(Update)
Proposed Street List
Includes the design and construction of North McDowell Complete Streets from Sunrise Parkway to Old Redwood Highway North and Garfield Drive from Washington Street to Wren Way. The work
includes the reconstruction including curb ramps,pedestrian crossings,and bike facilities.
Estimated
FY Street Name Begin End Description RMRA Construction useful Life
Priority Completion
(years)
24/25 Maria Drive Rainier Avenue McDowell Boulevard Full Depth Reclamation Cement Yes 24/25 20
24/25 Howard Street West St A Street Full Depth Reclamation -Cement Yes 24/25 20
24/25 Rainier Sonoma Mountain and Parkway North McDowell Blvd Full Depth Reclamation -Cement Yes 24/25 20
24/25 Pavement Preservation Various Streets in Petaluma Various Streets in Petaluma Various Streets in Petaluma Yes 24/25 7
Pavement Restoration 25/26-(LSR-2025-5022) Project
Proposed Street List
Includes the design and construction of Casa Grande Road from Ely Boulevard to McDowell Boulevard South and Howard Street from West Street to A Street. The work includes the reconstruction
including curb ramps,pedestrian crossings,and bike facilities.
RMRA Construction Estimated
FY Street Name Begin End Description useful Life
Priority Completion
(years)
25/26 Caulfield Lane Payran Street Ely Blvd South Pavement Rehabiltation Yes 25/26 20
25/26 D Street Petaluma Blvd South City Limits Full Depth Reclamation Cement Yes 25/26 20
25/26 St Francis Drive Caulfield Lane South McDowell Blvd Full Depth Reclamation Cement Yes 1 25/26 1 20
7