HomeMy WebLinkAboutResolution 6462 N.C.S. 11/27/1973 esolutionNo. 646'2 N C }EER:mi 11:-21-73
ORIGINAL
RESOLUTION. AJTHOPIflNG THE. EXECUTION OF AN. AGREEMENT. .
WITH LAMPMAN .& ASSOCIATES AS CONSULTING ENGINEERS: FOR
THE EAST WASHINGTON STREET—MARIA DRIVE. TRAFFIC SIGNAL
U .ct 'X
INTRODUCED BY COUNCILMAN.._ .. S -- - Ltt t'--�- and
% .7 �
SECONDED BY COUN L N / 9. at a
Adj.Quzned Meeting of the City Council of the
City of Petaluma, on the 27th day of NQ.v.ember , 19.13.
WHEREAS , the City of Petaluma' desires :to upgradethe- flashing light
school traffic signal at the .intersect'ion pf East Washington Street and
November 16 , 1973 ,
Maria Drive ,. and a letter proposal has been received from Lampman & Asso-
ciates. detailing engineering services they. will- render. in the preparation
of the necessary- design for the traffic signal upgrading which 'this
Council: finds acceptable,'. _
NOW,. THEREFORE;' BE IT RESOLVED that the Mayor be.,. and she is hereby
:authorized to execute, an agreement with Lampman & Associate's for profes-
sional traffic engineering services., for the design of an upgraded traffic
signal at the inter-Section of East Washington Street and Maria Drive
:under the cpower and authority conferred upon this Council by the Charter of said City.
I hereby certify that the foregoing Resolution was duly and regulary introduced and
adopted by the Council of the City of Petaluma on the 27th
day of- November , 19 73 , by the following votes:
AYES: Councilmen Brunner , Cavanagh, Jr. , Daly, Harberson, Mattel ,
Perry, Jr. , and Mayor Putnam.
NOES: None.
ABSENT None
/
ATTEST: C (� . D -rt--7, ,.,.al •Z/ ! I / J L /:/
City Clerk Mayor .
FORM CA 10-73 C 446 ,
•
November 16 , 1973
RF_.t..E14` =. 1
p;' I :) •
Mr. Dave Young
Director of Public Works PUBC!C . . bal.
City of Petaluma
P.D. Box 61
Petaluma, CA 94952
Dear Mr. Young:
We are pleased to submit this proposal to provide professional
traffic engineering services to upgrade the flashing light
school traffic signal at the intersection of Washington Street
and Maria Drive .
. It is proposed that this modernized signal on Washington
Street initially be a two-phase , fully actuated installation
with a Type 70, 3 phase controller that has the capability of
accommodating left turn movements in the future .
We propose to complete the design of this project in accor-
dance with standard practices essentially as outlined below .
1. Field review existing facilities and obtain all available
data, including base maps , traffic counts , utility loca-
tions , etc.
2 . Prepare a preliminary report containing a generalized
• sketch of the proposed improvements , type and location
o'f signal standards , recommendations regarding phasing,,
type of traffic actuacted controller , vehicle detection ,
vehicle and pedestrian signal heads., and cost estimates
for all :improvements for review and approval by the City .
3. Prepare final plans , estimates and, contract documents in
accordance with standard procedures of the City .
•
4 . Coordinate the project as necessary with other affected .
agencies .
5 . Analyze the construction bids and prepare recommendations .
6 . Provide general supervision and advice during construction.
..... .,.air,;