Loading...
HomeMy WebLinkAboutResolution 6462 N.C.S. 11/27/1973 esolutionNo. 646'2 N C }EER:mi 11:-21-73 ORIGINAL RESOLUTION. AJTHOPIflNG THE. EXECUTION OF AN. AGREEMENT. . WITH LAMPMAN .& ASSOCIATES AS CONSULTING ENGINEERS: FOR THE EAST WASHINGTON STREET—MARIA DRIVE. TRAFFIC SIGNAL U .ct 'X INTRODUCED BY COUNCILMAN.._ .. S -- - Ltt t'--�- and % .7 � SECONDED BY COUN L N / 9. at a Adj.Quzned Meeting of the City Council of the City of Petaluma, on the 27th day of NQ.v.ember , 19.13. WHEREAS , the City of Petaluma' desires :to upgradethe- flashing light school traffic signal at the .intersect'ion pf East Washington Street and November 16 , 1973 , Maria Drive ,. and a letter proposal has been received from Lampman & Asso- ciates. detailing engineering services they. will- render. in the preparation of the necessary- design for the traffic signal upgrading which 'this Council: finds acceptable,'. _ NOW,. THEREFORE;' BE IT RESOLVED that the Mayor be.,. and she is hereby :authorized to execute, an agreement with Lampman & Associate's for profes- sional traffic engineering services., for the design of an upgraded traffic signal at the inter-Section of East Washington Street and Maria Drive :under the cpower and authority conferred upon this Council by the Charter of said City. I hereby certify that the foregoing Resolution was duly and regulary introduced and adopted by the Council of the City of Petaluma on the 27th day of- November , 19 73 , by the following votes: AYES: Councilmen Brunner , Cavanagh, Jr. , Daly, Harberson, Mattel , Perry, Jr. , and Mayor Putnam. NOES: None. ABSENT None / ATTEST: C (� . D -rt--7, ,.,.al •Z/ ! I / J L /:/ City Clerk Mayor . FORM CA 10-73 C 446 , • November 16 , 1973 RF_.t..E14` =. 1 p;' I :) • Mr. Dave Young Director of Public Works PUBC!C . . bal. City of Petaluma P.D. Box 61 Petaluma, CA 94952 Dear Mr. Young: We are pleased to submit this proposal to provide professional traffic engineering services to upgrade the flashing light school traffic signal at the intersection of Washington Street and Maria Drive . . It is proposed that this modernized signal on Washington Street initially be a two-phase , fully actuated installation with a Type 70, 3 phase controller that has the capability of accommodating left turn movements in the future . We propose to complete the design of this project in accor- dance with standard practices essentially as outlined below . 1. Field review existing facilities and obtain all available data, including base maps , traffic counts , utility loca- tions , etc. 2 . Prepare a preliminary report containing a generalized • sketch of the proposed improvements , type and location o'f signal standards , recommendations regarding phasing,, type of traffic actuacted controller , vehicle detection , vehicle and pedestrian signal heads., and cost estimates for all :improvements for review and approval by the City . 3. Prepare final plans , estimates and, contract documents in accordance with standard procedures of the City . • 4 . Coordinate the project as necessary with other affected . agencies . 5 . Analyze the construction bids and prepare recommendations . 6 . Provide general supervision and advice during construction. ..... .,.air,;