HomeMy WebLinkAboutResolution 90-346 10/15/1990FZesolution No. 90-346 N.C.S.
of the City of Petaluma, California
RESOLUTION AMENDING RESOLUTION OF INTENTION
ASSESSMENT DISTRICT NO. 21
CORONA-ELY ASSESSMENT DISTRICT
The City Council of the City of Petaluma resolves:
On. January 16, 1990, this Council adopted its Resolution
of Intention No. 90-25 to order improvement in Assessment District
No. 21, Corona-Ely Assessment District, City of Petaluma, County of
Sonoma, State of California.
This Council hereby deletes the following description of
improvement in said Resolution of Intention No. 90-25:
The construction of Sonoma Mountain Parkway from the end of
the existing full street improvements on Ely Road
(approximately 700 feet north of Washington Street) to Corona
Road, Ely Road from Sonoma Mountain Parkway to Corona Road and
Corona Road from Sonoma Mountain Parkway to approximately the
railroad crossing easterly of McDowell Boulevard including
associated curb, gutters, utilities, street lighting, railroad
crossing signalization, traffic signals at Rainier Avenue,
Maria Drive and Corona Road, landscaped medians, right-of-way
or easement acquisition, and all other appurtenances required
as a condition of the approval of the Corona-Ely Assessment
District Plan Line.
The following description of improvement is inserted in
replacement of the above:
1. The construction of Sonoma Mountain Parkway from the end of
the existing full street improvements on Ely Road
(approximately 700 feet north of East Washington Street to
Corona Road along the interim alignment for a distance of
approximately 11,000 feet). Improvements to consist of a
street section with four 11-foot wide travel lanes, two 5-foot
wide bike lanes, and a 16-foot wide landscaped median as shown
on the adopted Sonoma Mountain Parkway Plan Line along the
interim alignment through Lands of Brody. Joint utilities'
trench (for electric, gas, telephone, T.V., street lighting
and traffic signal interconnect) with all conduit and boxes
ready .for wiring includes the undergrounding of the existing
overhead telephone line along the east side of Ely Road.
ORBGINAL
90-346 Page 1 of 3
Hes. No . .............................. N.C.S.
2. The construction of Ely Road -from Sonoma Mountain Parkway on a
curve for approximately 9:00 feet to the existing Ely Road.
Improvements to consist of a street section width of 48 feet
to 40 feet curb to curb allowing for two travel lanes and two
bike lanes.
The work in the above-d'es'cribed improvements in Paragraphs 1
and 2 to include clearing, grading, Subbase, base, paving,
monuments, curb and gutter, a system for domestic water supply
including fire hydrants where none exist, storm drainage
facilities, sanitary sewers and appurtenances where none
exist, undergrounding existing, utility services to the. east
side of Sonoma Mountain Parkway as required, street lighting
including conduit, wiring. and appurtenances where none exist,
landscaping irrigation of median islands, sign-ing and striping
and related incidentals, traffic signals at Rainier Avenue and
Maria Drive intersections with Sonoma Mountain Parkway and
conduit for future signals at the Ely Road and Junior College
intersections. Joint utilities' trench with all conduit and
boxes ready for wiring.
3. Construct Corona Road improvements where Sonoma Mountain
Parkway intersects Corona Road to two travel lanes to allow
for interim signal and traffic movements as shown on the Plan
Line.
Work to include improvements necessary to widen Corona Road
including clearing, grading, subbase, base, paving, a 12-inch
water line from present 12-inch stub at railroad tracks to
Sonoma Mountain Parkway, storm drainage facilities, a 12-inch
sewer pipe and appurtenances from present stub in manhole
located on the east side of the railroad tracks to Sonoma
Mountain Parkway, traffic signal, signing and striping and
appurtenances.
4. The construction of Maria Drive from Morning Glory to Sonoma
Mountain Parkway for a distance of approximately 200 feet.
Improvements to consist of realignment., removal,
reconstruction and new construction including clearing,
grading, subbase, base, monuments, paving, curb and gutter,
sidewalk, water lines and appurtenances, storm drainage
facilities, street lighting, landscaping and related
incidentals. Joint utilities' trench with all conduit and
boxes ready for wiring.
5. Construction.. of Lynch Creek, Capri Creek, and Corona Creek
drainage structures and appurtenances crossing under Sonoma
Mountain Parkway.
6. Construction of Corona Creek channel and appurtenances from
Sonoma Mountain Parkway to McDowell Boulevard North for
approximately 1,600 feet, including conduits under the
Northwestern Pacific Railroad tracks, landscaping, irrigation,
Page 2 of 3
90-346 N.O,S
fencing, a gravel roadway or path and an interim creek
crossing to rear part of Brody parcel.
7. The construction of a sanitary sewer line and appurtenances
from Sonoma Mountain Parkway to Ely Road along the future
Corona Creek area.
8. Construction of a 12-inch water main and appurtenances from
Zone 4 Pump Station at Corona and Ely Roads along Ely Road to
Sonoma Mountain Parkway.
9. The acquisition of all lands, easements, rights-of-way,
franchises, licenses, permits, fees and the performing of all
work necessary or convenient to complete the above.
In all other respects Resolution of Intention No. 90-25
remains unchanged.
Under the power and authority conferred upon this Council by the Charter of said City.
REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Approved as to
Council of the City of Petaluma at a (Regular) (t~jii~~j3iaifi~l) meeting °-~ form
on the ....----15th..... day of ............Q~~_Q~?~~ ........................... 19~.Q.., by the r ~. '~
following vote:
City Attorney
AYES: Sobel, Davis, Woolsey, Tencer, Vice Mayor Cavanagh, Mayor Hilligoss
NOES: ~
ABSENT:
ATTEST:
~;ity t;lers
CA 10-85
Mayor
Council File ....................................
ReS. No..90-.34.6....._..... N.c.s. Page 3 of 3