CITY OF PETALUMA~ CALIFORNIA ~. r
~~~~~ ~~,~ August 3, 2005
Agenda`Title: Discussion and Possible Adoption of a Resolution Approving Meeting Dater August 3, .2009
the.Project Budget and Authorizing Award of Contract for the Crinella
Drive Reconstruction Project Meeting Time: 7:00 P1VI
Category: ^ Presentation ^ Appointments ®Consent ^ Public Hearing: ^ Unfinished Business ^ New Business
Department: Dire tor: Contact Person: Phone: Number:
Public Works Vin nt rengo Larry Zimmer (707) 776-3674
Total Cost. of Proposal or Project: Name of Fund:
$1,186,000- Total project cost Gas Tax - 2410
Proposition 1B funds
Amount Budgeted: Account Number: 000501108
$916,74I.85 - .07/08 Proposition l:B allo~cat_ign
$847,322.03 - 08/09 Prop 1B allocation Current Gas Tax Fund Balance:
$46,000.00 -Gas Tax Fund As of 6/3:0/09; $402,157
$1,810,063.88 -Total Project Budget
Recommendation: It is recommended that the City Council take the following action:
Adopt a.resolution approving the project budget and authorizing, award. of contract for the Crinella Drive
Reconstruction Project.
1. ^ First:reading of Ordinance. approved unanimously, or with unanimous vote. to allow posting prior to second reading
2. ^ FirsYreading of Ordinance approved without unanimous vote: Ordinance'has been published/posted prior to second reading; see
Attachment
3. ^ Other action requiring special notice: Notice has been given, see Attachment
Summary Statement:
The Crinella Drive Reconstruction Project, as approved in the FY 09/1'0 CII' Budget, generally includes
pulverization and. recycling of existing asphalt pavement and aggregate; base material via cold-foamed asphalt
recycing:info a new structural section, the placement of an asphalt pavement wear course, miscellaneous
concrete work;-striping, traffic control,. and performing other work specified in the special provisions and as
shown,on the plans, dated 2009, .for Crinella Drive Reconstruction Project from McGregor Avenue to_Bungalow
Lane.
Attachments to AgendaPacket Item:
1. Resolution approving the project budget and authorizing,award of contract.
2. Location map
Reviewed b: Finance Director: Reviewed by City Attorney: A rov b ana er:
.
~ ~~.
.ate: ~ C 0
Date:
Date: ~j - 2 ~~~ ~'
Rev. # Date..Last Revised: File:' S:\C'IP Division\ProjectslCrinella Rehab
COI 1081Design\330 PCDC-City Council\Crinella Contract
~~ Award\2009.07.20 Agenda Bill for Crinella Co~ttract Award.doc
CITE' ®F PETAI.iJ1VIA, CALIF®RNIA
AucUST 3, 2009
AGENDA DEPORT
.FOR
I)ISCUSSIONAND POSSIBLE ADOPTION OF A RESOLUTION APPROVING THE PROJECT
~.UDGET AND AUTFIORIZING AWARD OF CONTRACT FOR THE CRINELLA DRIVE
RECONSTRUCTION PROJECT
1. RECOMMENDATION:
Adopt a :resolution .approving the project budget and authorizing award of contract for the
Crinella Drive Reconstruction Project.
2. BACKGROUND:
Proposition 1B {Prop. 1B) prodded $19.925 billion in bond funds for a variety of
transportation priorities, including $2 billion for cities and counties to fund the maintenance
and improvement of local transportation facilities. As determined by the State Controller's
Office, the City of Petaluma's appropriation totaled $1:,764,064 in Prop 1B funding. Funding
was broken out into two different allocation years: 2007-08 ($916,741:85) and 2008-09
($847,322.03). In order to, receive either allocation; the .City had to submit a planned use to
the State Department of Finance .for approval prior to disbursement of the funds.
On April 7, 2008, City Council approved the $916,741:85', 2007-08 Proposition 1B allocation
for the reconstruction of Crinella Drive, from McGregor Avenue to Bungalow Lane. The
initial estimates for the project were derived from a visual inspection of the roadway, as well
as from the original record drawings dating back to the early 70's. The expected road work
was to basically remove and: replace the existing, asphalt;. but not the existing base or sub-base,
which was assumed to be adequate: As part of a thorough design, staff required the consultant
to conduct a full geotechnical investigation, including borings at six locations within project
limits. ~ The geotechrical study concluded that the pavement design used to estimate the
construction cost had -not been. adequate; and recommended more extensive (deeper)
reconstruction of the roadway: On December 15, 2008; City Council approved the use of the
200.8-09 Prop 1B allocation, also for the Crinella Drive Reconstruction Project, in order to
cover the increased. costs due to the need for ari expanded scope of work (full reconstruction
of the roadway).
Two alternatives were investigated in_early design: one was, a typical roadway reconstruction,
which. would remove all of the existing structural ection, to be hauled off-site by the
contractor and typcally~taken to a landfill; the other was to recycle the bulk of the materials
in-place., The recycled:in-place method not only reduces the amount of material to be taken to
a landfill, but also dowers -the amount of green house gas (GHG) emissions produced during
the processing of new material and when material is trucked in and out of the construction
site. In addition, the~projeet can be completed faster with less disruption to the public using
the recycled in-place method, and completed for approximately the same cost.
C:\Documents and Settings\Skappel\Local Settings\Temporary Internet E'iles\Content:0utlook\AOCDH2IA\2009 07 20 Agenda Bill for
Crinella Contract Award.doc
A Public Works consultant prepared the plans and specifications for the project and the Notice
Inviting Bids was issued on June 18, 2009. On July 13, 2009, a total of six (6) bids were
received, .all of which were- considered responsive. Bids were received and opened as follows:
Name of Bidder Bid Total
North Bay Construction Inc $764,294.72
FEDCO Construction,lnc $818,588.00
Argonaut Constructors $:847,300.00
Team Ghilotti, Lnc $884,631:75
Ghilotti Construction Com an $.899,069.1.8
Ghilotti Brothers, Inc $956,935.33
The engineer's basebd estimate for construction is $1,370,000.
With a bid of $764;294.72, the apparent low bidder is North Bay Construction, Inc. North
Bay Construction has satisfactorily performed milar projects for other .municipal agencies.
Staff verified that North Bay Construction possesses a valid Class A California contractor's
license no. 357560; which qualifies North Bay Construction to perform the work.
DISCUSSION:
Staff recommends authorizing City.Manager to .enter into, contract with the low bidder, North
Bay Construction, Inc.,.. to construct the Crinella Drive Reconstruction Project. If not awarded
at this fume, the City will. still be accountable for spending the Proposition 1B funds in the
future or risk losing the funding by June 2011.
4. FINANCIAL IMPACTS:
The State Department of'Finance approved the City's planned use of Prop 1B funds for this
project and has deposited a total of $1,764,064 directly into aCity-designated account. The
Prop 1 B funds do not require a :local match.
The table below identifies the current approved project budget and updated estimate for the
Cririella Drive Reconstruction Project No. 000501108:
C:\Documcnts and Settings\Skappel\Local Settings\Temporary Internet Files\Content:0utlook\AOCDH21 A\2009 07 20 Agenda Bill for
Crinella Contract Award.doc '
gTses .Approved
Resolution
12/15/08.
:CIP Budget
09/10 Current
Projected CIP
Costs
De i~ ~ $ 1;03,780 $ 110,000 $ 110,000
Le al Counsel. $ '5,000 $! 5,000 $ 10,000
Plannin ~/Environmental $ 5,00.0 $ 5,000 $ 5,000
Construction Contracts
$
1,1,60,775
$
1;326,000
$ --
.7.64,294;
.Construction Mana ement $~ 1.1..6,077 $ 126,000 $ 1.14,644
.Administration ~ $ 'S,Q0~0 $ 5,00,0 $ 10,000
CIP Overhead $ 77,737 $ 42,000 $ 56,429
Pro'ect.Contin enc $ 290;695 $_ 184,000 $ 114„644
Estimated Total P,ro'ect Cost $ 1,764,064 $ 1,803,000 $ 1,1'85,011
Fundiri Sources
Gas Tax $ 4.6,000 $ 46,000 $ 46,000
Prop 1B Allocation $ 1.,764,064
Max $ 1,764;064
Max $ 1,764,064
Max
TOTAL $ 1;810,064' '$ 1,810,064 $ 1.,810,064
The :remaining Prop 1B funds can be used by the City, provided we pass a future resolution
for a new'planned'use of the funds and receive approval from the State. The-Prop 1B funding
must be expended.by June'2011.
Construction is tentatively scheduled to begin in date. August and expected to be completed by
November, weather permitting
C`.ADocuinents~and:Settings\Sl:appel~,o~cal Settings\Temporary liiternet Piles\Content.0utlooklAOCDH21fC\2009 U7 20 Agenda Bill for
Crinella Contract Award.doc
ATTACHMENT '~
RESOLUTION
APROVIN-G THE PROJECT'BUD,GET ANl) AU.T->EIORIZI'NG AWARD. OF'CONTRACT FOR
THE CRINELLA DRIVE RECONS7CRiJCT'ION PdZO,IECT
PROJECT 'NO'. 000501108
WI~E~REAS; through a design consultant, City staff :has prepared construction bid documents and
advertised for construction of this Project; and
WI~EREAS, in accordance: with the City of Petaluma Charter and 1Vluncpal Code, California Public
Contract Code Section 20162 and other applicable law, City staff solicited bids for the Project; and
WI=IE'REAS, the project was bid on Tune 18, 2009; and six (6j. bids were ,received and opened in
.accordance with applicable' law; and
WHEREAS; the lowest bid for the Project was from North Bay Construction, Inc. for $764,294:72; and
WHEREAS, the 2007-08 and 2008=09 Proposition 1B Loca_1 'Streets and Roads Improvement Funds
have been deposited to the City of Petaluma m the amount of $1~,764;Q64 for the construction of Project
No. 000501108,; and
W>FIEREAS, staff .has determined that :North Bay Construction, Inc.'s bid satisfies the bidding
requirements'for the;Project; and
WHEREAS, staff has verified that North Bay Gonstrucfion, Inc. possesses a valid California
Contractor's License; Class A, number 357560, that qualifies North. Bay Construction, Inc. to perform
the Project; and
WHEREAS, the Project :has a Categorical:Exempfion pursuant fo the California Environmental Quality
Act ("CEQA") pursuant. to Article 19, Section 15301, of Title 14 of'the California Code of Regulations
("CEQA Guidelines").
NOW, THEREFORE, BE IT RESOL ,VELD that ahe City :Council' of "the City of Petaluma hereby:
1. Approves the proj ect budget ;in the amount of $:1..,.186,000.0.0.
2. In accordance with -the City of Petaluma Charter and Municipal Code, California Public Contact
Code Section 20162 :and other applicable law, waives any and all non-conformance in the bid of
North Bay Construction, Inc: for the Crinella Drive. Reconstruction Project, finds the bid of
$764,294.72 to be the lowest responsive bid, and further` finds tha_tNorth Bay Construction Inc is the
lowest responsible bidder.
3. Awards the contract for the Crinella Drive Reconstruction Project to; North Bay Construction. Inc; in
the amount of $764;294.72, the amount .of the lowest responsive bid, conditioned on North Bay
Construction, Inc. timely executing the project contract and submitting all. required documents,
including; but, not. limited to, executed bonds; certificates of insurance, and endorsements, in
accordance with the prgj ect bid documents.
4. Directs. staff to 'issue a:notice of award to North Bay .Construction, Inc.
5. Authorizes and directs the 'City Manager to execute the project contract on behalf of the City of
Petaluma upon. timely ~subrnission by North Bray Construction, Inc. of the signed project contract and
all other ;required documents, ;including: but not limited to, executed bonds, certificates of insurance,
and endorsements,,inaccordancc with the project bid documents.
C:\Documents acid Settings\Skappel\Local Settings\Temporary Internet Files\Content:0utlczok\tAOCDH2]A\2009 07 20 Agenda Bill for
Grinel la;Contract. Award: doe
ATTAC F~ nA E'Ad'T 2
Z
O
v
N
Z
0
V
L.B~
W
Q
J
_O
~ ~.
_'
~L
® ~.
®Q~
e
V L
u
O
s
rn
c
_~
.c
`m
d
O
O
~o
_~
0
E
~X
O
Q
Q..
a
0
3 W
0
~~ O ~O
~ O O
~ O M
.r O O
O h
~ ~~ O
~ ~
E ~
O N .C
d ~ C
N V ~-
Q In d
ti~
d
ti
6