HomeMy WebLinkAboutStaff Report 3.E 04/16/2012 • ge'vi da/it.P,w 1#3 .E
zALU�
/sae,
DATE April 16 ,2012
TO: Honorable Mayorand,Members,ofthe City:,Council through.City Manager
FROM Dan St,John, E:ASCE - Ditec ul Works &.Utilities
SUBJECT: Resolution Accepting Completion.ofthe.Sewer:Manhole:ReplaccmentProject,
Various Locations=- 2011
RECOMMENDATION
It is recommended that theity,Cottnciladopt the attached,Resolution accepting completion Of
the Sewer Manhole Replacement Project,Various Locations-2011.
BACKGROUND
To maintain.and improve the condition of the City's wastewater system, the Public Works &
Utilities Department annually r'eplaces•or"rehabilitates deteriorating sanitary sewer facilities
throughout the City. The City currently has approximately 1'50 manholes m need of
replacement. Many of the City's older`manholes were constructed with brick'and mortar. These
brick manholes area significant cause of high infiltration and;mflows,;(I&I);'in part due,to the
deterioration of interior surfaces°and eroding mortar allowing groundwater to enter the system.
This project removed and replaced ten existing.brick manholes in various locations on the west
side of Petaluma. The manhole;locations are shown on Attachment 2. The inanholeireplacement
• program is the first of an annual effort.to.'address the I&I situation'through manhole
replacements. •
Bids were opened on.JuneJ 5;.2011. On July 11, 2011,•the;:City Council awarded the
construction contract to'W.R._Forde'Associates of Pleasanton, CA, in the amount of$82,850, and
approved a project.budgettof$131,850. Construction was successfully completed on February
24, 2012.
DISCUSSION.
Project costs-included construction inspection performed by'P,ublic Works stafatacostof
approximately$5;000, and a Professional;:Services;Agreement for geotechnical and materials
testing with Miller Pacific, Inc: att,mcost of$2,022: Project design-wascompleted in house-by
PW&U-staff designcosts are captured in,the'CIP administration budget:
•
Agenda Review:
•
,
City.Attorney. _ Finance Director City-Manag
The:final construction contract cost is $_104,016; which ihcludes•change.orders totaling $21,166.
The,approved project t;budget establishedia-change order contingency of$25,000 for unforeseen
conditions. Extra-work included,revisionsto rpcecast,manholebases;due to existing field.
conditions; modification of precast manhole tops to facilitate access,due to depth constraints;
extra work to conforin.to.differing site conditions at existing sewer mains; and extra work for
removal of excess concrete and asphalt.
FINANCIAL.IMPACTS
The Manhole Rehabilitation.Project Number 066501003, was approved in the:Wastewater CIP
with a'budget of$390,000.. $258,150 has been set-aside for future manhole rehabilitation
projects. The intent is to manage ten to twenty sites per phase until all failing manholes have
been replaced.
The budget for this phase, Sewer,Manhole Replacement Project, Various Locations— 2011, was
approved by City Council in the,amountof$131,850. With-the.construction contract, change
order contingency, construction°inspection, and geotechnical andntaterials testing, the total
expended cost for the-project Was'$111,038. The remaining;account.balance for the project is
$20,812. At project closeout, all remaining funds will return to the Wastewater CIP Project
Number,C66501003''to be(used on future manhole rehabilitation.projects.
Following the acceptance of the project, the City Clerk will.file a Notice of Completion with the
Sonoma County Recorder and the,Finance Division will release the retention money
($10,401.60)to the contractor Within 60-days.
ATTACHMENTS
1. Resolution
2. Location Map
2
Attachment 1
RESOLUTION ACCEPTING'YCOMPLETION'OF THE
SEWER:MANHOLE,REPLACEMENTPROJECT, VARIOUStLOCATIONS— 2011
WHEREAS,,in accordance With Section 68 of Article X of the City of Petaluma.Charter,
Section 20162 of the:'California'Public Contract Code and other applicable laws, the City of
Petaluma solicited bids for theSe wer'Manhole.ReplacementProject, Various Locations —2011
("Project"); and
WHEREAS; bids for the Project were opened on June 15,2011 in accordance with
California Public.Contract Code Section 4104.5 and other applibable laws; and
WHEREAS, the apparent;low'bid for the Project was thebid•of W.R. Forde Associates
(W.R. Forde) in the amount of$82,850; and
WHEREAS, by Resolution No. 2011-105 N.GS. adopted JUly 11,2011, the City
Council of the City of Petaluma found the bid of$82,850 for the Project to.be the lowest
responsive bid and awarded thesP.roject to W.R. Forde Associates in the amount of$82,850
conditioned on W.R. Forde's timely executing the Project contract and submitting all required
documents and authorized'"and;directed the City Manager to sign the Project contract on behalf of
the City upon,such timely submissiomand;to execute on behalf of the City any amendments°to
the Project;contract that are necessary to effectively complete the project and/or to realize•the
Project and/or cost benefits for the City;and •
WHEREAS;;the following change orders (CO) affecting the Project amount have;been
approved:
CO No 1: Differing site conditions and revisions to manhole bases and tops $16,187.87
CO No 2: Differing site conditions and revision to manhole No 2 $ 4,978.13 •
Total Change Orders: $21,166.00; and
WHEREAS,the final contract amount as amended including all change orders is
$104,016; and
WHEREAS;,City staff has inspectedthe Projecband.determined that it has.been
completed iri"accordance With the contract req'ui'rements subject to the Contractor's continuing
warrantyand:other obligations.pursuant to the(contract; and
WHEREAS,,based on the foregoing, staff recommends.acceptahce-ofthe Project on
behalf of the City;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Petaluma
as follows:
1. The contract entitled Sewer Manhole Replacement Project; Various Locations - 2011,
City,ProjectNurnber C66501003 with a final contract amount of$104,016, is
3
:accepted as complete subject to the.Contractoes continuing warranty and d other
obligations pursa nt:to the contract:
2. The City Clerk/Recording Secretary,is hereby authorized and directed to.file a Notice' •
of Completion concerning the Project.with the Sonoma County Clerk's Office within
ten(10)'days of the date of this Resolution.
3. Staff is hereby authorized_and,directed to release all-undisputed retention•not subject
to pending,change orders within sixty (60) days ofthe date of this Resolution and in
accordance:witfithe terms of the Project contract, California Public Contract Code •
Section 7107 and applicable.law'.
4
Attachment 2
SEWER MANHOLE REPLACEMENT
VARIOUS LOCATIONS - 2011
PROJECT NO . C66501003
LOCATION MAP
Iirr0 \ 0 v -
S
1 301°
, c---
/
IrY . 4
'\
rci 1 V
\ • --.
o 11P . ilz /9
c S
Pk-7,
iC12
vi ‹,41/414::7
e\ IC
4- ‘r
\ S AINCR\4 6/QO7$PCI41
44C Sti?4-Q /
MANHOLE LOCATIONS TYP. fr- i4 11
ss /
■ X_ t i
[CITY OF PETALUNO'l
N
'It w*E
((Si . c S •
,LVIS=6 5