Loading...
HomeMy WebLinkAboutStaff Report 4.A 05/07/2012 , Apaiefi Worn/#4A ,SAL t •_°T • • 859, DATE: May 7, 2012 TO: Honorable Mayor and Members of the City Council through City Manager FROM: Dan St. John, F.ASCE,-Director, Public Works and Utiliti:t d. 1 ' Larry Zimmer;-P.E. Capital Projects Manager SUBJECT: Resolution Approving the Project Budget and Authorizing Award of Contract for 'the Petaluma River Trail Enhancement Project: • RECOMMENDATION It:is recommended-that the City CounciLadopt the attached resolution;approving the project budget and authorizingaward ofcontract for the Petaluma River Trail Enhancement Project to Ghilotti Construction Company in the amount of$953,657,to be funded primarily by Measure M with no impact to the General'Fund. BACKGROUND The referenced project-will feature an.all-weather paved trail along the Petaluma River as part of the Lakeville.Industrial segment of the;Petaluma River Trail Access and Enhancement Plan. If ! the base bid is awarded, the trail•will start:nearthe Copeland sanitary sewer pump station, . located at the end of North Water Street, across the Petaluma River via a pre-fabricated pedestrian bridge, and continue on.the:east side along the Petaluma;River to Lakeville Street. An alternative was bidthat'Would start the trail from Washington:Street along North Water Street to the beginning of.the-proposed"base bid" trail described,above. Staff recommends award of the base bid only because,the;City has not obtained easements for the trail portion from Washington . Street along North Water Street to the pump station. The;trail will not connect to the existing river trail behind the Clover-Stornetta plant near the-Lakeville Street Bridge:because the Army Corps of Engineers "Payran`Flood.Control Project" has not closed the"gap in the flood wall adjacent to the'bridge. Ideally this project would,complete the River Trail from its existing terminus near Lakeville Street all the way to Washington Street. However, delays in the final,phase of the Payran Flood Control Project and.inability to acquire a pedestrian access-easement from two property owners on Water Street North prevent completion at this time Staff recommends proceeding with the base bid because the PUC(Public Utility Commission),approval for crossing the railroad tracks at Lakeville will expire this summer and obtaining a new approval-is uncertain. It will take � significant staff resources, and could require modification of the plans:. The remaining portions Agenda Review:• ' City Attorney - - Finance Director City,Manager 1 of path can betcompleted in the=future,at-minimal cost once,the-flood wall is completed and property'rights.are acquired. Through a design consultant, staff prepared the bid.docurnehts, and issued allotice Inviting Bids • on March 8, 2012. Seven (7)bids were received on April 4, 2012, as follows: Base Bid +Bid Name of Bidder Base Bid Amounts Alternate Amounts • Ghilotti Construction Co $953,657 $1,064,344 JFC Construction *$974,177 *$1,104,743 Team Ghilotti $991,216 $1,182,384 W. R. Forde $1,025,930 $1,243,720 Ghilotti Bros. Inc. $1,029,053 $1,166,097 Maggoria & Ghilotti $1,059,059 $1,257,455 Michael Paul Company *$1,237,245 *$1,486,465 * Errors in totals were corrected`in accordance with bid documents The engineer's estimates for construction are $1,200,000 and $1,450,000 for the"base bid" and the "base bid plus the additive bid"respectively. Ghilotti Construction Company (GCC) is the apparent low bidder. Staff has verified that GCC possesses a valid California Contractor's License, Class A, number 644515 that is appropriate for the type of construction to be performed. GCC has satisfactorily completed similar work for various public agencies includingthe recently-completed Lynch Creek Trail Project for the City of Petaluma. The City did receive two protests for the impending bid award. DISCUSSION The third apparent low bidder, Team:Ghilotti, Inc. filed a bid protest(see attachment 3) because the low bidder, GCC, did not list subcontractors for the following items of work:hazardous hauling/trucking, chain link fence; concrete pumping, and crane services. Team Ghilotti also protested award to the second low bidder,'JFC Construction,for not listing subcontractors for the following items of work: striping&;signage, hazardous hauling/trucking, rebar, chain link fence, and concrete pumping. JFC Construction also protested award.to Ghilotti Construction, essentially on the same basis. The City's,bid documents provide,that ifthe•general contractor does not specify a subcontractor fora portion of work to be performed under the contract in excess.of one-half of one percent or $10,000 whichever is greater, he/she agrees that he/she will perform that portion•himself/herself. • The low bidder, GCC, responded (attachment 4)that they listed Bay Area Welding & Maintenance from Richmond for the fence work, and that hauling/trucking, pump concrete and crane services work will not be provided by subcontractors covered by State Contractor Licensing laws, because such service providers are not required to hold a contractor license to perform these functions:, 2 The?second low bidder respohsea(attachment5) contended that he would"self-perform" the signage„hazardous,hauling/trucking and.,rebar work;in-house'with his own employees and the • sub-bid for striping, chain link fence, and concrete pumping<.issunder the $10,000 threshold needed'rto be listed as a subcontractor: Staff believes that the low bid of, GCC, is responsive based on the•GCC response and the subcontractor listing form that was used in the City's bid package. It is-true that there are no • Sate Contractor Licensing Board licensing-requirement specifically for providers of hauling, concrete pumping, and crane services,For that reason, such work-is commonly performed by service providers that are not;licensed contractors, but that are nonetheless fully qualified to perform the work. Of course, contractors are directly responsible to awarding agencies for all work-performed under the contract,:whether the work is performed by licensed contractors or by unlicensed service providers. Therefore, staff recommends that the City'Council reject the protests ofJFC Construction and.Team,Ghilotti and authorize the City Manager to enter into a contract with the low bidder, Ghilotti Construction Company, for the base_bid. If not awarded at • this time, the City will not be able to meet the California Public'Utilities.Commission (CPUC) deadline to begin construction by June• 5 2012 as required by CPUC Order GO-88B, thus requiring re-application of the CPUC Order and delaying th'e,project. FINANCIAL IMPACTS Die following isa breakdown of the current project budget: Requested Estimated Budget by this Measure M. City Resolution Reimbursement _ 'Funds Design $176;000 $176,000 Right-of-Way $30;000. $30;000 ,Construction Contract $953;657` $953,657 Construction Management $85;000 $85,000 & Inspection Geotechnical Testing $14;000 $14,000 Contingency $143;000 $143,000 CW Overhead $45,000. $45,000 TOTAL $1,401,657 $45,000. $1,446;657 • The estimated total project cost, including planning, design, construction, administration, inspection, testing, and project contingency is $1,446,657. The project is funded by Measure M cost reimbursement in an anticipated amount of$1,401,657, and $45,000 in.former PCDC funds for CIP overhead which is not eligible for Measure M reimbursement. This project will be initially funded with PCDC funding which has been set aside for this purpose and will eventually be reimbursed with Measure M funds as they become available. The CIP Overhead charge of $45,000 will not be reimbursed and is expected to be funded by PCDC,fiinds without reimbursement The full costWas included in the'Reutilized Obligation Payment Schedule (ROPS),,and was approved by the oversight board ofthe successor,agency on April 25, 2012. 3 • Measurelvl reimbursements wilhbebased on actual revenue; and on.availability of those funds for this specific program, Completirig•the project would likely put this project on a..higher • priontyand•result man earlier-reimbursement. 'The use of former PCDC funds for this project isrincluded in the recommended Recognized Obligations Payment Schedule that City 'staff will submit to the Oversight.Board approval at its April 25 meeting. A project budget of $1,741,000 was approved in the 2011/2012 CIP'budget. ATTACHMENTS 1. Resolution 2. Location Map • 3. Bid protest from Teath Ghilotti 4. Low bidder response to the bid.protest. 5. Second low bidder responseto the bid protest. 4 Attachment 1 RESOLUTION APPROVING THE PROJECT BUDGET AND AUTHORIZING THE AWARD OF CONTRACT FOR THE PETALUMA RIVER. TRAIL ENHANCEMENT PROJECT TO GHILOTTI CONSTRUCTION COMPANY. WHEREAS; City staff has prepared construction bid documents and advertised for construction of this Project; and WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, City staff solicited bids for the Project;and WHEREAS, the Project was bid on April 4, 2012, and seven(7) bids were received and opened in accordance with applicable law; and WHEREAS, the lowest bid for the Project was from Ghilotti Construction Company ("GCC")for $953,657 for the base bid; and WHEREAS, staff has determined that GCC's bid satisfies the bidding requirements for the Project; and WHEREAS; staff has verified that GCC possesses a valid California Contractor's License, Class A, number 644515 that qualifies GCC to perform the Project; and WHEREAS, protests concerning award of the Project contract to GCC were received from JFC Construction and Team Ghilotti asserting that the GCC bid failed to list subcontractors as required; and WHEREAS, staff have concluded:that the objections of JFC Construction and Team Ghilotti relate to service providers not subject to subcontractor listing law requirements; and WHEREAS, the Project has environmental clearance (the Mitigated Negative Declaration) pursuant to California Environmental Quality Act ("CEQA"), by Resolution no. 96- 138N:C.S. adopted on May:20, 1996. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City hereby: 1. Approves the Project Budget in the amount of$1,446,657 including a contingency of $143,000. 2. In accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, rejects the bid protests received from JFC Construction and Team Ghilotti, Inc:; and waives any and all non-conformance in the bid of GCC`for the Petaluma River Trail Enhancement Project, finds the bid of 5 $953657 to be thelowest;responsive bid and further find's tfiat'GCC is the lowest responsiblebidder. 3. Awards the contract for the>.Petaluma River Trail'Enhancement Project to Ghilotti Construction Company, in the amount of$953,657, the"amount of the lowest responsive. bid, conditioned on Ghilotti Construction,Company timely`executing the project contract and submitting,all required;documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 4. Directs staff to issue,a notice of award to GhilotthConstruction Company. • 5. Authorizes and directs the City Manager to execute the,project contract°on behalf of the City of Petaluma upon timely submission by Ghilotti'Construction Company of the signed project contract and all other required documents, including but not limited to, executed bonds, certificates:of insurance, and endorsements, in accordance with the • project bid documents. • • 6 't \ : . - 1 ' •• �' - 9 `, 44,1 0..fr..7 e ,...Oyu "'� ^ . . or f' V . .0"t°11" ,\,,-,. ..-....„ :.,,,,,,o\i, C. \ il �! * i • / 7744.: ,•. . i. ,•...• 1.4;6640:000/04010' , ,r. ,--.. -• .,4" . .6 \ , -r.),, ' .. , ■ • '44 \-...V. , .. fi : • , /' r f I tM ii0,0k n. l J t� , .:r.,18::, �} V ti. 1 ' ! 'AL c f ` d ' . C14, ,i 12 j lit 401 ',.••• -- 7 . ' . ' a4!'" M W u . r.: 44 ''.. $ ' X m tom : I Z ,i4.: i '�,j ., .,... .,.,, / „is, .. ,...eta! ,. .•-4 i Ti ,�1/`� J i 4, , v .. , • A ti :v. \ts f Q '�F� ,*mot° � lit )4‘144/11.111%t,' i \ i 4. • - N t .{ -i lej ,- ,../i . -^...,...... , •■ ... / . ‘... C CO n r 2 i m D z 73 i O /..Npo SIC: �� �� Al -a m �/ / -4 ./ / S F m O . m z 41 ✓ • '/ v n m k. .It i 70 H d+ + ` / N • Attachment 3 ?,t L�11 AYR 1Z L • *1! !! PUBLIC WORKS - . " ENGINEERING April 9,2012 Fleming Nguyen, P.E. City of Petaluma • Department of Public Works&Utilities 11 English;Street Petaluma, CA 94952 Reference: The Petaluma River`Trail Enhancement project Washington Street to Lakeville Street • Subject: Protest of Bid•Submitted by Ghilotti Construction'Company & JFC Construction Dear Mr.Nguyen, In accordance with the City of Petaluma's Instructions To Bidders, Section 16: Bid Protest, Team Ghilotti submits this formal protest of the apparent low:bidder'Ghilotti Construction and apparent second low bidder.JFC Construction per the following specifics: instructions to Bidders: "The Bid must set forth the'name and location of the place of business of each subcontractor who will perform work or labor or render services to the prime:contractor in or about the construction of the WORK, or a subcontractor'licensed by the State of.California who under subcontract to the prime contractor, specially fabricates and installs'a portion of the WORK according to detailed Drawings contained in the plans and specifications, in an amount in excess of one-half of I percent of the prime contractor's total bid or in'the caseof bids or offers for the construction of streets and highways, including bridges, in excess of one-half of 1 percent of the prime contractor's total biddor ten thousand dollars ($10,000), whichever is greater." Team Ghilotti'contends that both Ghilotti.Construction and JFC Construction do not meet the requirements as listed above-as they did not.list the necessary subcontractor to perform the work stated in the specification and-plans for the above named-project. As per the Bid Forms, Ghilotti Construction and.JFC should have listed any subcontractor performing work in excess of$10,000. Below is a schedule indicating the various items of work 2531 Petaluma`Blvd South • Petaluma, CA_94952'• FAX: 707-763-8711 www.TeamGhilotti.com. STATE CONTRACTORS LICENSE#895384 CLASS: A • 8 • and,the minimum cost associated-.with them where,Ghilotti Construction and/or JFC failed to list. subcontractors. Sub Listed Sub Listed Minimum. By Ghilotti by JFC Cost Construction Construction • $ Striping& Signage 10,600100 . . No ' $., I-Iaz 1-lauling/Trucking 61,288.00 j No No $ 4 I Rebar 27,499.40` I No Chain Link Fence '12,740:00 No No Pump Concrete 21.455.00' No No $ Crane Serves 12,000.00 No , We therefore request the City of Petaluma find the low bid and the second low bid non- responsive and award the contract to Team Ghilotti inc. Please contact us with any questions. Respectfully, L Team Ghilottii . i e, en G4 Ian Preside t (707) '3=8700 4 Ghi ‘tti Construction Company J ' Construction 9 Attachment 4 w_ ;CONSTRUCTION since;' C'0 M P'A'N Y 1914 April 12, 2012 Fleming Nguyen, P.E. City of Petaluma Department of Public Works&Utilities 11 English Street Petaluma, CA 94952 Reference: The Petaluma River Trail Enhancement-Project Washington Street to Lakeville Street Subject: Protest of.Ghilotti Construction Company, Inc.'s bid by Team Ghilotti Dear Mr. Nguyen, In response to:the letter dated_April 9, 2012 by Team Ghilotti; GCC is responding to the accusation that we did not properly list all required subcontractors per the project specifications. Specifically, Team Ghilotti names the following scopes as not having been accounted for by listed subcontractors:-'I laz Hauling/Tracking, Chain Link Fence,Pump Concrete and Crane Services. Ghilotti Construction listed'a Chain'Link Fence sub on.our List of Subcontractors. We named Bay Area Welding & Maintenance out of Richmond. CA for the Fence and Metal Railings. The other scopes Of work, specifically I laz Hauling/Trucking, Pump Concrete and Crane Services,.are"not,subcontractors (These companies do not'have Contractors State License Numbers), and therefore were not listed in,the List of Subcontractors. Ghilotti Construction is the lowest responsible bidder on the Petaluma River Trail Enhancement Project. . Sinc rely, o tI Thomas Smith Estimating Manager — Engineering Contractor — • 246 GHILOTTI AVENUE•SANTA.ROSA,;CA•95467•707—.585-1221 •FAX:707-585-0129 STATE CONTRACTORS LICENSE#644515 1.0 Attachment 5 r ' JFC CONSTRUCTION, INC-. • April 12.2012 Fleming Nguyen;P;E.,. Sr.Civil Engineer • City of Petaluma Public Works&Utilities Department • 11 English St.,Petaluma,CA 94952 Reference: The Petaluma Riveitrail Enhancement project Subject: Team Ghilotti Bid:protest respnce Dear Mr.Nguyen: We are in receipt of Team Ghiiottirs bid protest of our bid for the above referenced project Below are the reasons why we did not list subcontractorsfor the items of work they claim we should have listed: 1) Stripping&Signage: JFC bid to perform the signage scope of the project in-house with our own employees. The sub-bid we used for stripping was.below$10,000. 2) Haz Hauling/Trucking:.JFC bid to perform this scope of work in-house with JFC employed certified truckers &trucks. No sub needed • 3) Rebar: 1FG bid to perform this scope of work in-house with 1FG employed workers. No sub.Needed. • 4) 5) Chain Link Fence: The subcontractor bid we used for this scope of work was under$10,000,no need to list sub. • 6) Pump.Concrete: JFC bid to only use a concrete pump for the drilled.piers. This amount was under$10,000, no need to list sub. We do not feel a protest of our bid is valid per.the above explanation. However,we would like to formally protest Ghllotti Constructions bid because they failed(per the instruction to bidders)to list a crane company(craning& rigging)to set the bridge: This is a critical component oftbe'pro)ect and I highly doubt Gilotti Construction has"in- house capacity"to complete this scope of work. We therefore request the City of.Petaluma find:the low bidders(Ghilotti Construction);bid non-responsive and award to JFC Construction Inc. Sincerely, • Steve.Goldsworthy JFC Construction, Inc. Project Manager (925)260-0914 4901 Pacheco Blvd. • Martinez, CA 94553-4324 • Phone: (925)228 70924 • Fax: (925)228-0477 • CA LIC# 592562 11