Loading...
HomeMy WebLinkAboutStaff Report 4.A 06/18/2012 • ge. i iwit w#4.x,4 w • • • e A 2858. . • • a. DATE: June 18, 2012,. 'tp; TO Honorable:Mayor andMetnbers;of the CityCouncil through City Manager _ • ., • FROM Dan St.:John;F.ASCE'— Director,Public Works and Utilit P Larry Zimmer, P.E. —Manager, Capital•Projects Division SUBJECT: ' Resolution Approving the Project Budget and Authorizing-Award of Contract for the Petaluma•South Road Diet Project and a Resolution Approving the Water • Street Parking'ProjectDesign Scope • RECOMMENDATION Staffrecommendsthat the City Council adopt the two attachedresolutions: 1. Approving•the project budget and authorizingaward of contract for the Petaluma. Boulevard South Road Diet Project to Ghilotti Bros.,,Inc. in the amount of$639,876 to be funded primarily by Regional Transportation for Livable Communities (TLC) and . Proposition 1B Funding Programs.with no impactto'the General Fund. 2. Approving:the design scope for the Water Street Parking:Project. • BACKGROUND TheiPetaluma Boulevard;South Road Diet will reconfigure the current four narrow through lanes to•two;through,lanes and one two-way left•turn lane between Washington Street and Street, with a transition to E Street. The project will match up•.to a similar road diet project completed. on:the+Boulevard:north.of Washington.Street. The reconfiguration will provide lane widths that Meet City and Federal design staiidardandinclude Class3 Bike delineations to improve pedestrian safety and additional on-street.parking. The work entails restriping of the;existing • roadway andjraffic signal modifications to accommodate the new.lane configuration: Prior to striping,'a minor:non-structural pavement surface treatment will be applied'to eliminate the existing striping. Based on public input, additional bike racks, plaza benches and replacement of tree:grates were, added to the-road•diet project scope: Public input also supported the companion project to add. • Parking;on Water Street. Public outreach for the overall,project included twopublic meetings, meetings with;the'Petaluma Downtown Association, loading zone and parking;surveys and project mailings to approximately 400 nearbypropertyowners. Public?outreach began prior to the grant application, through.design, and will continue duringconstruction. Agenda;Review: City Attorney Finance Director City Manager The project can alsen?esolvera inotorcycle,iparking problein;at Center Park by adding,designated Motorcycle-parking at that location. Currently motorcycles-are:illegally parking on the pedestrian pathway oron the unpaved surface. The project as bid can create a break in the curb and gavel.a portiomof currently unpaved:_Center Park, north of tthe'crosswalk: This work will have:no impact,on the.existing redwood frees:or the park redesign. This design is collaboration between, and fully-,supported by„the Public Works;and•Utilities,staff, Police Department staff, anff the Pedestrian and Bike Advisory Committee. Discussion of the project with the Recreation and Parks Board:is currently pending. Should that body advise against-these improvements, they can-be:removed from the project scope;through the deductive change order process. DISCUSSION Staff issued a Notice:Inviting Bidson.April 25,2012. One bid was received on May 16, 2012 and compares reasonably to the Engineer's estimate, as shown below: Name of Bidder Business Location Total Bid Ghilotti Bros, Inc. San Rafael $639,876 Engineer'.sestiniate N/A $610,000 It is unusual to receive only one bid ona construction project. It is assumed the reason in this case isdue to the varied nature.of the work. A prime contractor would need to subcontract such a-large portion of the work-that it may have been deemed not worth-the effort for a project of this size. Fortunately the bid we did receive was very close to our engineer's estimate. Ghilotti Bros.,Inc. is apparent low bidder-: Staff has verified that.Ghilotti Bros., Inc.,possesses a valid • California,Contractor's.License, Class A, number 132128 that is appropriate for the type of construction to be performed. Ghilotti Bros., Inc. has satisfactorily completed similar work for various public agencies and recently completed the East Washington Street Pedestrian.Crossing for the City of Petaluma: • Staff recommends City Council authorize the City Manager to_enter into contract for the Petaluma Boulevard South Road Diet.Project with the,apparent low'bidder, Ghilotti Bros., Inc. Construction is tentatively scheduled,to begin in August 2012, and is expected to last approximately forty-five'days: Staff is also requesting approval.of the Water Street Parking project scope. During public outreach, downtown businesses voiced an overwhelming;concein for additional parking and. requested that Water”Street be used Staff evaluated re-opening Water Street to Western Avenue as a separateprojectand received-input from the City Manager, City Traffic Engineer and Police Department. Staff estimates the Water Street".Parking project will cost approximately $40';000 including parking bollards, striping, signageand;accessibility improvements. The existing signal at Western would•be modified to allow use of Water.Street as a'through way and signs-would be placed to,state the area maybe closed for special events. The Water Street project would follow construction of the-Petaluma Boulevard South Road Diet because the planned traffic signal modifications•afWestern Avenue"are^•needed prior to reopening Water Street. The Water Street project is included in the FY 12/13 CIP budget-approved by City Council on May 21, 2012. 2 • • ,The;proposed actions'meet Council Goal:"Pl'an.for{and implement priority capital projects as funding permits:" FINANCIAL IMPACTS On June21, 201,1, City Council authorized a revised Petaluma Boulevard South Road Diet project budget of$906,239,which consists of approximately 80% of TLC and 20% Prop 1B grant•funding,.and $29,000 from-th&Street Maintenance fund,for overhead. The current estimated total,project cost including planning, design, construction,.administration, inspection, testing, and project contingency is $959,530. The project budget, see table below, exceeds the June 20, 2011 staff report estimate by$53,291 for the following reasons: 1. Design cost overrun due to unexpected environmental requirements by Caltrans. 2. Staff and consultant timefor additional public outreach and requested design modifications. 3. The single bid exceeded estimate. Some savings are projected for-construction management. If there are grant funds still remaining by the end of project, it is possible that-Caltrans could approve a higher design reimbursement up to 25% of the total construction cost. Staff recommends an increase in the amount of Proposition 1B funds used for the project by $52,041 and an increase in the total project budget to $959,530. Petaluma Boulevard South Road Diet Budget _ ;Eshinated • • 6/20/11 Contract, 'MTGCaltrans :Uses _ • ,Budget; • Award;; Reimbursement_ Design $53,500 $93,891 $52,392 Planning/Environinental $78,150 $78,150. $43,608 Construction Contracts $600,000 $639,876 $511,901 Construction.Management/Staff $80,000 $61,124 $48;899 CIP Overhead @ 2.4% $21,239 $22,489 Construction Contingency $73,350 $64,000 $51,200 TOTAL $906,239 $959,530 $708,000 Sources forMatching Funds Street Maint Operating Budget $21,239 $22;489 (2.4%Overhead) Street Maint Operating:Budget $7;600 $7,600 Prop;1B;Funding $169,400 $221;441 TOTAL MATCHING'`FUNDS $198,239 $251,530 The Water Street Parking project.budget is $40,000 as shoivn.below, and is included in the FY 12/13 CIP budget approved by'City Council on May 21, 2012,(CIP Project Number: C161013.02). There is no fiscal iinpactof approving the design scope;of this "companion" project. 3 • • Water Street ParkingrProject4Budget Estimatedr User - Budget'. • Construction Contracts $ '33,000 Construction Management/Staff $ 3,000. Project Contingency $ 4,000 TOTAL $ 40,000. Funding Sources Street Maint Operating Budget $ 40,000 TOTAL $ 40,000. ATTACHMENTS • 1. Resolution:Petaluma Bouleyard,South Road Diet 2. Location Map:,Petaluma:Boulevard South Road Diet 3. Resolution: WaterSttëet Patting 4. Location Map:'WatecStreet Parking • 4 • • • • • 4 Attachment 1 • • RESOLUTION APPROVING THE PROJECT'BUDGETAND AUTHORIZING THE AWARD OF CONTRACT FOR THE PETALUMA BOULEVARD SOUTH ROAD DIET PROJECT TO GHILOTTI BROS.,INC. WHEREAS, City staff has prepared construction bid documents and advertised for construction of this Project; and • WHEREAS, in accordance with.the City of Petaluma'Charter and Municipal Code, California Public Contract Code Section20162 and other applicable law, City staff solicited bids • for the Project; and WHEREAS, the Projectwas-bidon-May 16, 2012, and one (1)bid was received and opened in accordance with:applicable law; and WHEREAS, the lowest bid for the Project was'fromGhilotti Bros., Inc. ("GBI") for $639,876; and WHEREAS, staff has+determined that GBI's bid satisfies,the bidding requirements for the Project; and WHEREAS, staff has verified that GBI possesses a valid California Contractor's License, Class A, number 132128 that qualifies GBI to perform the Project; and WHEREAS, the Project has a Categorical Exemption pursuant to the California Environmental Quality Act ("CEQA") pursuant to Article 19, Section 15302, of Title 14 of the California Code of Regulations("CEQA Guidelines"); NOW, THEREFORE, BEIT RESOLVED"that the City Council of the City of Petaluma hereby: 1. Approves the Project Budget in the•amount of$959,530 including a contingency of $64,000. 2. In accordance.with-the City of Petaluma Charter:and Municipal Code, California Public Contract Code;Section'.20162 and other applicable law, waives any and all non- conformance in the bid•of Ghilotti Bros., Inc: for the Petaluma Boulevard South Road Diet Project, and finds the of$639,876 to bethe,lowest responsive bid, and further finds that Ghilotti.Bros.,'Inc. is`the lowest responsible bidder. • 3. Awards the contract.fot the Petaluma Boulevard'South.Road Diet Project to Ghilotti Bros., Inc., in,thd.amount of$639,876, the amount of.the;lowest responsive.bid, conditioned on Ghilotti"Bros., Inc. timely executing the project contract and submitting all required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 4. Directs staff to issue a notice of award to Ghilotti Bros., Inc. 5 . • • 5. Authorizes'and directs the City'Manager,to execute'the project contract onibehalfof the City'of Petaluma upon timely submission by Ghilotti Bros., Inc. of the::signed project. contract.and all other required documents,'including but not limited`to, executed bonds, certificates;of insurance, and endorsements, in accordance with the project bid • documents. • 6 N C o : _ - :_ Y la w • C = C/) L V .i N J -1 0 Q I Z • w I < F----- 'I .. ' J t._ i' s_ /► E rI4 . ,,. A poi tv. 4 . , > . , ,,,,,,.a. ,„ 4,,, . „.„,st _ # 4.:.ft p G , ' <ea* 4 St • < E 0 L . 1 2 NV 47, 44*s 1 H ‘ '441,k, .9 1 .1 , -c/ t. , + % s• ii, ° , . 8 ve ., , a . N . a. . • IttA:trati . ..w.4. / : , , / s • Attachment 3 RESOLUTION APPROVINGTHEWATER.STREET'PARK!ING PROJECT ;DESIGN SCOPE . • WHEREAS, the proposed projecfwill add vehicle and motorcycle parking to Water Street;.and • WHEREAS, the project was developed by theCity'in partnership with the Petaluma Downtown Association and downtown merchants as a result of public meetings and surveys;and WHEREAS, the Project was reviewed by the City Engineer and Police Department for ,safety•improvements;and WHEREAS; necessary traffic signal modifications at intersection of Western Avenue and Petaluma Boulevard South•will be completed by a sep arate project prior to this project moving forward; and WHEREAS, $40,000 is estimated to be the total project costs for implementing design and construction of this project;:and WHEREAS, sufficient funds for this purpose were approved in the FY 12/13 CIP budget on May 21,.2012; and WHEREAS, the Projecthas a Categorical Exemption.pursuant to the California • Environmental Quality Act (`-`CEQA")pursuant to Article 19, Section 15301, of Title 14 of the California Code of Regulations("CEQA.Guidelines"); NOW, THEREFORE,BE IT RESOLVED that the City'Council of the City of Petaluma hereby approves theWater Street Parking Project Design Scope. 8 • rn 1 cn -r, w N I ' *N. : AN, ;;E:- /it - . .,, , ,..,..... \ ' 0 . % 4 4/10, di r . .:,rr... mm o ��zm a 0 o r- ► o ;o . (nQAZm . : . .?gip, a xZ ZO D -. ti. oat i j zz z i z h.--N c o r:. :,* 0 1 w t ‘ , .„4.. ' rp r ,�. o o w ■ x r! • d m ' ,., C ` + C) ... " . 'Oil 0 �y g .1b J z -H N r rn ' . alb . Af � _ A .. , ., till Ai #, -n c, ..ter , v P r"44 o C c eo• Z� + • Z ao _. zz ,,1 �� m , , .\ , . O m C ^" } . t -,- , .001;4146, •-r,' ---,.aag9 o P' 0 c *NI T Z m r 4 rrl—1 E --? z x,z N D •. Z O p A C . - 1 N• mo cziN • . w ' 1 A . y ..444.4 — di' F • : . ' a Ci WATER STREET C 1 T y O F P E T A L u M A DATE MARCHl2012 PROJECT ND. CKWJ( DESIGNED BY EAS --- ' PUBLIC WORKS AND UTILITIES DEPARTMENT PARKING PLAN 11 ENGLISH STREET,PETALUMA,CALIFORNIA,94952 DRAWN BY.EAS PH.707.778.4303 FAX.707-776.3602 CHECKED BY:L2 Q1 I CJI I 4 W N I