Loading...
HomeMy WebLinkAboutPlanning Commission Resolution 2012-13 08/14/2012 RESOLUTION NO. 2012-13 CITY OF PETALUMA PLANNING COMMISSION APPROVING SITE PLAN AND ARCHITECTURAL REVIEW FOR THE DEER CREEK VILLAGE PROJECT LOCATED AT NORTH MCDOWELL BOULEVARD AND RAINIER AVENUE APNs: 007-380-005 and 007-380-027 File No. 09-SPC-0091 WHEREAS, Merlone Geier submitted an application for Site Plan and Architectural Review for the purposes of developing a 36.55 acre property with approximately 345,000 square feet of commercial uses including retail, financial, restaurants, fitness center, and office for a development to be called Deer Creek Village, "the Project"; and, WHEREAS, at a duly noticed hearing on April 2, 2012, the City Council adopted Resolution No. 2012-040, certifying an Environmental Impact Report for the project, in conformance with the California Environmental'Quality Act ("CEQA"); and, WHEREAS, at said hearing, the City Council adopted Resolution No. 2012-041 N.C.S., making CEQA findings, adopting a Mitigation Monitoring and Reporting Program and adopting a Statement of Overriding Considerations pursuant to CEQA; and, WHEREAS, at said hearing, the City Council provided direction to the Planning Commission on items to be addressed as part of the Site Plan and Architectural Review process; and, WHEREAS, on August 2, 2012, a Notice of Public Hearing was published in the Argus- Courier and mailed to all residents and property owners within 1,000 feet of the project and all individuals on the interested party list for the project; and, WHEREAS, the Planning Commission held a properly noticed public hearing on August 14, 2012, in accordance with the City of Petaluma Implementing Zoning Ordinance, Section 24.030. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission hereby approves the Site Plan and Architectural Review for the Project and authorizes site improvements for Project contained in said plans based on the findings made below and subject to the conditions of approval attached as Exhibit A hereto and incorporated herein by reference: 1. The project as conditioned will conform to the intent, goals, and policies of the Petaluma General Plan 2025: 1-P-6 Encourage mixed-use development, which include opportunities for increased transit access. 1-P-14 Require provision of street trees, landscaping, parking and access features to help integrate land uses and achieve an effective transition between uses of disparate intensities. 2-P-5 Strengthen the visual and aesthetic character of major arterial corridors. 2-P-87 Where applicable, provide a transition in scale along North McDowell Boulevard between the industrial uses on the west side of the boulevard and the residential developments to the east, while allowing new development at intensities Planning Commission Resolution No.2012-13 Page 1 reflective of enhanced connections provided by the new cross-town connector and interchange at Rainier Avenue. 2-P-88 Provide enhanced pedestrian and bicycle network connections between the industrial, commercial, and residential clusters. 2-P-89 Allow for a range of uses, including commercial, office, and residential, in the mixed use area on the southwest corner of North McDowell and Rainier Avenue. 4-P-6 Improve air quality through required planting of trees along streets and within park and urban separators, and retaining tree and plant resources along the river and creek corridors. 4-P-9 Require a percentage of parking spaces in large parking lots or garages to provide electrical vehicle charging facilities. 5-P-23 Require the provision of pedestrian site access for all new development. 5-P-31 Make bicycling and walking more desirable by providing or requiring development to provide necessary support facilities throughout the city. 6-P-29 Integrate arts into the planning process in the City and encourage the arts as an integral part of development proposals and capital improvement projects. 9-P-1 Retain and attract 'basic' economic activities that bring dollars into the local economy by exporting products and services. The proposed project as condition is consistent with the goals, policies and programs of the General Plan in that Deer Creek Village in that the project includes a mix of uses and incorporates new transit facilities within to the site design and will convert a vacant infill site and strengthen the visual and aesthetic character of the McDowell corridor through orientation of facades toward the street, landscape buffer from parking areas, construction of a Class I pathway along the North McDowell frontage and installation of street trees and other landscaping. The commercial nature of the proposed Deer Creek Village project will provide a transition between industrial uses to the north, office uses to the south, and residential uses to the east and has been designed to transition between larger major tenant buildings along the Highway 101 frontage and the smaller individual single story buildings closer to McDowell. Significant enhanced pedestrian and bicycle connections are incorporated into the project design and link into the enhancement and preservation of the Deer Creek swale. Incorporation of support facilities such as secure bicycle parking, public plazas, drinking fountains, benches, and public art further enhance the pedestrian and bicycle connections within the project site. 2. The Project, as conditioned, will not constitute a nuisance or be detrimental to the public welfare of the community because it conforms to the Petaluma Implementing Zoning Ordinance j"110"j. The project is zoned MUIB, Mixed Use and the uses proposed for the Project are all permitted uses in the MUIB zoning district. The project landscape plan and provisions for tree preservation are consistent with IZO Chapters 14 and 17, respectively. Onsite parking is consistent with the provisions outlined in IZO Chapter 11. 3. The proposed project is consistent with the development standards of the MU1B zoning designation, including setbacks from property lines, height limitations, and lot coverage. 4. The vacation of the existing sewer easement on the property and relocation of the sewer main and associated easement is consistent with General Plan Policy 8-G-4 in that the segment of existing sewer main proposed to be removed is part of the City's collection system and will be replaced by the developer to the latest City and industry standards at the expense of the applicant. 5. The proposed project as conditioned conforms to the requirements of IZO Section 24.010G, Site Plan and Architectural Review Standards for Review of Applications as follows: Planning Commission Resolution No. 2012-13 Page 2 The project includes the appropriate use of quality materials and harmony and proportion of the overall design. The proposed project uses a variety of exterior materials, including stone, wood, metal, glass, plaster, tile, split face CMU, and living walls to provide visual interest and differentiation within the large development. Detailing through the use of different roof features, awnings, trellises, and finishes and accents further develop the overall design intention for the shopping center. All buildings include four sided architecture to ensure that the development orients both towards frontages such as North McDowell and interior within the development and between individual buildings. The architectural style is appropriate for the project and compatible with the overall character of the neighborhood. The architectural style of the proposed project provides transition between existing industrial development to the north, office/medical uses to the south, and residential development to the east. Additionally, the transition of the architectural style and massing from the larger tenant buildings closest to Highway 101 to the smaller individual structures closer to the McDowell frontage provide transition within the development. The intensity of the proposed project and the architectural style and siting has also been designed to enhance the future Rainier interchange and undercrossing connections. The siting of the structure(s) on the property is in harmony with siting of other structures in the immediate neighborhood. The siting of structures within the proposed Deer Creek project has been designed to transition from larger buildings closer to Highway 101 to smaller more pedestrian oriented buildings closer to McDowell and Rainier. Additionally, structures have been sited so as not to overwhelm existing office development to the south by providing parking and landscaping buffers. The siting and grouping of buildings along the north/south spine in the eastern portion of the site brings structures closer to the road to create more of a neighborhood street effect as opposed to a sprawling suburban shopping center. The size, location, design, color, number, lighting, and materials of all signs and outdoor structures are appropriate for the project's surroundings. The proposed sign program provides a cohesive and integrated approach to signage for the Deer Creek Village center as a whole. A variety of materials and colors are encouraged but the parameters of the program ensure consistency. The master sign program outlines maximum square footage for each of the 36 tenants, consistent with the parameters of the Implementing Zoning Ordinance. The freestanding signs are designed with colors, materials, and decorative features found in the architecture of the site. All signs are internally illuminated and have been conditioned to include automatic sensors to shut-off during day time hours and dim during non-business, late night and early morning hours. Landscaping shall be in keeping with the character or design of the site. Landscaping has been appropriately used throughout the project to provide buffers, soften edges, break up large parking areas, and enhance pathways and plazas/gathering space. Additionally, street trees along McDowell buffer the development from the busy arterial and enhance the Class I path along the frontage. Native landscaping is focused within the 100 foot wide Deer Creek buffer zone and enhances the experience along the pedestrian pathways along the edges of this linear open space. Existing trees along the Highway 101 Planning Commission Resolution No.2012-13 Page 3 corridor will not be removed as part of this project. The overall landscaping concept orients and connects the large development, and enhances the architectural design and siting. Ingress, egress, internal circulation for bicycles and automobiles, off-street automobiles and parking facilities and pedestrian ways shall be designed to promote safety and convenience and shall conform to City Standards. Plans pertaining to pedestrian, bicycle, or automobile circulation shall be routed to the PBAC for review and recommendation. The project has been designed to provide safe and convenient access to all modes of transportation, including bicycles, pedestrians, transit riders, and automobiles. New transit facilities are proposed to meet City standards. A Class I path is proposed across the North McDowell frontage, consistent with existing facility on the east side of McDowell. A pathway across the rear of the development connects with Lynch Creek Way. Differentiated pathways, sidewalks, and crosswalks are located throughout the development to connect the project to off-site circulation. The project's pedestrian connectivity through the site improves the network between commercial, office, residential and medical uses in this area of the McDowell corridor. ADOPTED this 14th day of August, 2012, by the following vote: Committee Member': , _ Aye. No = Absent" Abstain Abercrombie X Elias X Herries X Johnson X Kearney X Chair Pierre X Vice Chair Wolper' X .S -.a -.pierre, '•ir ATTEIA , , APPRO S TO FORM: a ; J �J\ He. er Hines, Commis:on Secretary Eric Danly, Clty Attorney Planning Commission Resolution No.2012-13 Page 4 Exhibit A SPAR CONDITIONS OF APPROVAL DEER CREEK VILLAGE INTERSECTION OF NORTH MCDOWELL AND RAINER APNs: 007-380-005 and 007-380-027 File No. 09-SPC-0091 Planning Division 1. This Site Plan and Architectural Review authorizes construction of an approximately 345,000 square foot commercial shopping center as shown on plans dated stamped July 25, 2012 and located at North McDowell and Rainier, APNs 007-380-005 and 007-380-027. 2. Plans submitted for building permit review shall be in substantial conformance with the approved plan set dated stamped July 25, 2012. 3. Prior to issuance of a building permit/grading permit revised plans shall illustrate the following modifications: a. All conditions of approval and mitigation measures from the Mitigation Monitoring and Reporting Program in the Deer Creek Village Final Environmental Impact Report (SCH No. 2004092093) ("FEIR") shall be listed on the first sheet of the office and job site copies of the building permit plans. b. Modify the south elevation of the Bank building to provide more interaction along the interior Main Street (A-14); c. Revise the north elevation of the Grocery Store to increase interaction and pedestrian orientation along North McDowell (A-8); d. Revise landscape plan to add appropriate landscaping of the corner City parcel at the intersection of North McDowell and Rainier and along the future Rainier frontage and provide continuity with the project (LP-01); e. Employee showers shall be illustrated for all applicable tenant spaces in compliance with the requirements of Section 11.090C of the IZO and all employee showers shall have interior access and include bathroom facilities. Buildings that are 10,000sq ft or more and then divided to accommodate more than one tenant, shall have shared showers accessible to all tenants to encourage employees to use their bicycles to get to work or allow them to shower after exercise to comply with the spirit of the city code. f. At least ten electrical vehicle charging stations shall be shown on site improvement plans and shall be distributed in groups around the site to provide convenience in all areas of the shopping center; g. Increase the number of preferential parking spaces in key quadrants of the project and especially adjacent to the office buildings; h. Revise landscape plan to increase tree planting along Highway 101 corridor to further screen the buildings; i. Redesign conflicting parking spaces at corners of interior parking lot to ensure unrestricted access (A-1); j. Eliminate freeway oriented signage on the rear facades of the major tenants (A-3A and A-5); k. Increase three tier landscaping along North McDowell frontage; I. Incorporate greater building articulation between Majors 2, 3, and 4; and m. Incorporate greater articulation on the south elevation of the Fitness Center. 4. Particular attention shall be paid to architectural detailing to improve four sided architecture on all buildings. Planning Commission Resolution No. 2012-13 Page 5 5. The project shall be subject to all applicable development impact and other City fees. 6. All mitigation measures as adopted in conjunction with the FEIR are herein incorporated by reference as conditions of project approval. 7. Prior to issuance of a building permit, the plan shall note the installation of high efficiency heating equipment (90% or higher heating/furnaces) and low NOx water heaters (40 NOx or less) in compliance with policy 4-P-15D (reducing emissions). 8. No business identification signs shall be permitted on the back/rear of the buildings facing the freeway. 9. Upon approval of project entitlements, the applicant shall pay the Notice of Determination fee to the Planning Division. The check shall be made payable to the County Clerk. Planning staff will file the Notice of Determination with the County Clerk's office within five days of project approval. 10. Prior to the issuance of a building or grading permit, all plans shall include the following requirements and all construction contracts shall include the same requirements (or measures shown to be equally effective, as approved by Planning), in compliance with General Plan Policy 4-P-16: • Maintain construction equipment engines in good condition and in proper tune per manufacturer's specification for the duration of construction: • Minimize idling time for construction related equipment, including heavy-duty equipment, motor vehicles, and portable equipment; • Use alternative fuel construction equipment (i.e., compressed natural gas, liquid petroleum gas, and unleaded gasoline); • Use add-on control devices such as diesel oxidation catalysts or particulate filters; • Use diesel equipment that meets the CARB's 2000 or newer certification standard for off- road heavy-duty diesel engines; • Phase construction of the project; • Limit the hours of operation for heavy duty equipment. 11. Prior to the issuance of a building or grading permit, the applicant shall provide a Construction Phase Recycling Plan that would address the reuse and recycling of major waste materials (soil, vegetation, concrete, lumber, metal scraps, cardboard, packing, etc.) generated by the construction of the project and in compliance with General Plan Policy 2-P-122 for review by the planning staff. 12. The applicant shall apply for and obtain a sign permit prior to installation of each sign and in conformance with an approved master sign program for the shopping center. 13. Subject to applicable law, the Project shall not include any retail use that contains book sales as a primary use and is larger than 5,000 square feet of gross floor area. 14. Issuance of a building permit is conditioned upon approval by the City Council of vacation of an existing sewer easement which underlies a portion of the proposed Friedman's building (C-2 on the project plans), consisting of approximately 7350 square feet, ("the Easement"), dedication of a new sewer easement by the applicant over the project property which is satisfactory to the City Engineer and relocation of the existing sewer main located in the Easement to the new easement, all at the expense of the applicant. Planning Commission Resolution No.2012-13 Page 6 15. Approval of the on-site parking layout is contingent on Planning Commission approval of a Conditional Use Permit for a parking reduction of 10%. If said Conditional Use Permit is not approved the site plan shall be revised to accommodate on-site parking consistent with the parking requirements as outlined in the I/O and as required to accommodate all individual uses on the site. 16. All work within the public right-of-way requires an encroachment permit from the Public Works department. 17. In the event that archaeological remains are encountered during grading, work shall be halted temporarily and a qualified archaeologist shall be consulted for evaluation of the artifacts and to recommend future action. The local Native American community shall also be notified and consulted in the event any archaeological remains are uncovered. 18. Improvement plans shall include appropriate tree protection measures consistent with General Plan policies and all applicable City regulations to ensure adequate protection of the existing Oak trees along the southern property line adjacent to.Highway 101. 19. The applicant shall defend, indemnify and hold harmless the City and its officials, boards, commissions, agents, officers and employees ("Indemnitees") from any claim, action or proceeding against Indemnitees to attack, set aside, void or annul any of the approvals of the project. The applicant's duty to defend, indemnify and hold harmless in accordance with this condition shall apply to any and all claims, actions or proceedings brought concerning the project, not just such claims, actions or proceedings brought within the time period provided for in applicable State and/or local statutes. The City shall promptly notify the applicant of any such claim, action or proceeding concerning the project. The City shall cooperate fully in the defense. Nothing contained in this condition shall prohibit the City from participating in the defense of any claim, action, or proceeding, and if the City chooses to do so, applicant shall reimburse City for attorneys' fees and costs incurred by the City. 20. No storage, racking, or uncovered sales area shall be visible from outside of the Friedman's yard enclosure at any time. 21. Operation of the security entrance/exit to the Friedman's yard shall not include cashiers or provisions for payment for merchandise, but shall act only as a security check for outgoing merchandise. Patrons shall be required to turn off their engines during loading. 22. The applicant shall continue to work collaboratively with staff and the Petaluma Public Art Committee to finalize the master art program for the Project and shall submit the necessary documentation prior to issuance of a building or grading permit that all criteria for public art as outlined in Chapter 18 of the IZO has been satisfied. 23. The applicant shall be responsible for construction and limited term maintenance of a fence and associated landscaping along the rear property lines of those residential properties backing onto the east side of North McDowell between the southern edge of the Sandalwood Mobile Home Park and Professional Drive and along both sides of Rainier Avenue from North McDowell to Prince Albert. The ultimate design of the fence shall be determined by staff after outreach to said residential neighbors. The fence shall be shown on improvement plans and shall be part of the initial phase of construction. The applicant shall be responsible for one year maintenance of all new fencing and five year maintenance of all new landscaping located in the public right-of-way. 24. The applicant shall obtain and install benches from the Petaluma High School metal shop program for incorporation into the project. Planning Commission Resolution No.2012-13 Page 7 25. Enhanced paving shall be used for all pedestrian walkways and crosswalks to further enhance the pedestrian amenities. 26. Loading areas, vehicles, parking lots, meters, outdoor storage, etc., shall be adequately screened to the extent possible. 27. All planting shall be maintained in good growing condition. Such maintenance shall include where appropriate, pruning, moving, weeding, cleaning, fertilizing, and regular watering. Whenever necessary, planting shall be replaced with other plant materials to insure continued compliance with the approved landscape plan. 28. Building permit plans shall include installation of electrical conduit in all buildings to facilitate solar installation. The fitness center building shall also be preplumbed for solar. 29. The Deer Creek Swale and 50 foot development buffer shall be clearly identified on plans and all amenities, including walkway, art installation, benches, water fountains, bike parking, and kiosks shall be outside of said buffer. 30. Truck traffic for Major tenants shall enter and exit the site on Lynch Creek Way or North McDowell Boulevard and shall not use internal bridges. 31. The project applicant shall work with city staff to explore opportunities for a lighted crosswalk on Rainier Avenue at either Prince Albert or Rushmore. 32. Gooseneck or similar lighting for freestanding signs shall be considered to minimize potential lighting impacts and full use of halo lighting for signs is encouraged. Fire Marshal 33. Provide fire truck turning templates on construction drawings to demonstrate adequate turning for emergency vehicles. Modify site access as necessary to accommodate adequate fire truck turning and access in coordination with the City Engineer and the Fire Marshal. 34. For the area within the Major 1/Friedman's yard; a "20 foot wide EVA" shall be lined (lines showing 20 foot limit) on the pavement and marked at intervals with "No Parking/Fire Lane". We expect the EVA will need to run outside the proposed outside storage piles and will need clarification/verification regarding the "Loading Berths", grade change, and that the EVA will be able to pass through this area unimpeded. No storage shall be allowed over the EVA and a revised Site Circulation System Map including the proposed EVA with signage shall be submitted for review. We understand that the area between "Major 1 and Dry Shed" is open and drivable and the "hashed area" at one end is a valley gutter not a wall. 35. Minimum fire flow for buildings shall be calculated as specified in the 2010 California Fire Code Appendix B, "Fire Flow Requirements for Buildings". Please be advised that if building fire flow calculations cannot be made at the time of project submittal, the following fire flows shall apply: Commercial, Industrial, and Multifamily Residential: 2500 GPM at 20 psi residual (available for firefighting). When building fire flows are submitted, these flows shall be adjusted in accordance with Appendix B. Planning Commission Resolution No.2012-13 Page 8 36. Proof of the required fire flow shall be provided to the Fire Marshal's Office prior to issuance of the building permit. The FMO shall not accept less than minimum fire flow and pressure. It shall be the developer's responsibility to make private and/or public improvements to the system to meet the water flow demands of the project. 37. The two fire hydrants marked along North McDowell that are shown as "Existing Fire Hydrant to be Relocated" shall be moved the appropriate distance necessary to avoid the "road cutaway". This will necessitate adding two hydrants within the Deer Creek development at or near the inbound lanes near the Bank and Pharmacy. This better balances hydrant resources within the development and has been discussed with the Project Engineer (Mr. Wayne Leach). An additional hydrant needs to be added back to the plans along the interior road near the Bank's northwest, as shown on previous plans. Hydrant locations for the rest of the site generally look acceptable, but we still reserve the right to adjust and or add hydrants depending on possible changing conditions. The Fire Marshal's Office will work cooperatively with the developer to provide comments as the site improvement plans are developed. 38. The plans submitted show the approximate "rough" locations where fire department connections (FDC) and post indicator valves (PIV) locations may be located. Revised site improvement plans shall include more detailed information such as cut sheets for double detector check valves, FDCs/PIVs, along with precise locations. As a reminder FDCs and PIVs should be within approximately 50 feet of a hydrant and it may be necessary to add hydrants and/or move FDCs; and locating these will need to be coordinated with the Fire Marshal's Office. 39. All commercial building/s (or portions thereof) shall be protected by an automatic fire sprinkler system as required by the City of Petaluma Municipal Code and shall conform to NFPA 13 requirements. The fire sprinkler system shall be provided with central station alarm system designed in accordance with NFPA 72 and addressable to each building. A local alarm shall be provided on the exterior of the building AND a normally occupied location in the interior of the building. All systems require 3 set of plans to be submitted to the Fire Marshal's Office for review and approval. If any of the structures are three stories or taller; Class One standpipes will be required. 40. The Friedman's store and "Dry Shed" will have "high pile storage" and we require any proposed high pile or higher hazard commodities to be reviewed independently by a Qualified Professional Engineer (QPE) or Fire Protection Engineer (FPE). Rack storage and all areas must be fully compliant with the California Fire Code Chapter 23 (High-Piled Combustible Storage) and NFPA 13 (Standard for Fire Sprinklers). The QPE or FPE must submit a detailed report to the Fire Prevention Bureau verifying the fire sprinkler systems (including rack storage area) are compliant with all Chapter 23 and NFPA 13 requirements. Please be advised, this is a requirement and plans submitted without the required FPE report will be delayed. 41. A plan showing all fire lane signs and red-curbing shall be submitted to the Fire Marshal's Office for approval. This can be integrated with parking/stripping plan. Be advised, we reserve the right to request that "No Parking Fire Lane" where no curbs exist or if other visibility issues arise and warrant this requirement. 42. All buildings shall include lighted address numbers that are clearly visible from the street. Numbers are to be a minimum of six inches (6") high with contrasting background. 43. A Knox box for fire department access for each building shall be provided. Location of the Knox box shall generally be near the sprinkler/riser exterior door and shall be verified by the fire inspector during inspection. Planning Commission Resolution No.2012-13 Page 9 44. Provide one (1) fire extinguisher with a minimum 2A1 OBC-rating for each 3000 square feet of office space and no more than 75-feet travel distance from any location to a fire extinguisher, and/or Provide (1) fire extinguisher with a minimum 2A20BC-rating for each 1500 square feet of warehouse space and no more than 50-feet travel distance from any location to a fire extinguisher. Fire extinguishers shall be visible and easily accessible, located in egress pathways, and mounted no higher than 5' from top of extinguisher to finished floor. 45. This review was conducted for the preliminary plan set dated 12/21/12 and if significant changes are made to buildings, EVA's, or access that require additional review; we reserve the right to modify and/or add conditions of approval. Public Works All conditions shall be addressed at the time of improvement plan review by the City and prior to issuance of any construction permits, unless otherwise noted. Street and Frontage Improvements 46. Street and frontage improvements shall be constructed as proposed on the application plans and consistent with project phasing, according to City standards and as directed by these conditions of approval. Improvements shall include but not be limited to pavement, curb, gutter, sidewalk, traffic islands, traffic signals, traffic signs, pavement striping and markers, pedestrian ramps, bike lanes, street lights, etc. Improvements shall meet accessible standards. Pavement conforms shall be completed to the satisfaction of the City Engineer. The decorative crosswalks at the project access points shall be constructed on private property, maintained by the property owner and designed to support vehicle traffic loads. 47. Modifications to intersections, traffic signals and traffic lanes shall be subject to the project traffic study, environmental impact report and the direction of the City Engineer. 48. The minimum pavement section shall be 6-inches of asphalt concrete over 21-inches of class 2 aggregate base for McDowell Boulevard North and Rainier Avenue. 49. "No Parking" signs shall be placed along McDowell Boulevard North and Rainier Avenue. 50. Street lights shall be installed and/or relocated as required by the City Engineer along McDowell Boulevard North and Rainier Avenue. As an option and at the discretion of the City Engineer. the City may require LED street lights. 51. Traffic control plans shall be prepared in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and be submitted and approved prior to the start of construction. 52. Remove and replace any broken or displaced curb, gutter and sidewalk along the entire North McDowell Boulevard frontage. 53. Any proposed Monument Signs for the Deer Creek Village shall be located such that they are out of the required sight distance triangle. The applicant's engineer shall provide sight distance calculations, per Caltrans standards, with the improvement plan and building permit submittals. No monument signs shall be located in the area designated for future widening of the intersection of N. McDowell and Rainier for Route 101/ Rainier Interchange or Undercrossing Project. Planning Commission Resolution No.2012-13, Page 10 54. A Class I Bike/Pedestrians path (10 feet wide) shall be constructed along the N. McDowell frontage of the project. 55. A traffic signal shall be installed at N. McDowell and Professional Drive for mitigating the traffic impacts of the proposed project. 56. Raised median islands shall be installed between Rainier Avenue and Professional Drive and Professional Drive and Lynch Creek Road to prohibit left turns out of the two proposed right in /right out driveways for Deer Creek Plaza on N. McDowell. 57. Rainier Avenue extension on the west side of N. McDowell shall be constructed up to the proposed driveway to the Deer Creek Village, consistent with project phasing. The west end of this extension shall be constructed as a cul-de-sac (50 feet radius) based on City of Petaluma standards to facilitate Petaluma Transit Buses to make U turns coming out of the Transit Yard. No parking signs and red curb shall be installed within the cul-de-sac area. The traffic signal at N. McDowell and Rainier intersection shall be modified to accommodate this extension. 58. Provide truck turning templates on the construction drawings for the proposed pharmacy and demonstrate adequate turning for the appropriate delivery truck vehicle. Modify parking in the area as necessary to accommodate adequate truck turning area. 59. Provide the proposed truck route for the grocery store on the signing and striping plans submitted with the construction drawings. 60. No utility vaults or trees shall be installed on the northeast corner of the Deer Creek Village project since the intersection of N. McDowell and Rainier will be widened for the Rainier Avenue Interchange/ Undercrossing. Grading 61. Grading, excavation and compaction shall conform to the soils report prepared for this site. 62. All above-ground or below-ground structures (buildings, fences, pipes, conduits, etc.) that are not necessary for the project shall be removed. 63. The applicant shall submit erosion and sediment control plans, a storm water pollution prevention plan SWPPP) and provide a copy of the signed Notice of Intent (NOI) submitted to the State Water Resources Control Board. A Notice of Termination (NOT) shall be submitted to the SWRCB upon completion of the project. 64. The applicant is required to fund erosion control and storm water quality inspections by City public works inspectors throughout the life of the construction project, as part of the cost recovery application. Water and Sanitary Sewer Systems 65. Relocate the existing sanitary sewer main as proposed on the site plans and dedicate a new public sewer easement prior to issuance of any building permits. The applicant has submitted an application for abandonment of the portion of the existing public sewer easement that is no longer needed (application number 12-ABN-0417). The Planning Commission Resolution No.2012-13 Page 1 1 abandonment is a City Council approval process and shall be approved prior to issuance of any building permits. 66. All on-site sewer systems except the existing and relocated City trunk main shall be privately owned and maintained and labeled as such on the construction drawings. 67. The trash enclosures with sanitary sewer drains shall be covered and not allow rain water to enter the sanitary sewer system. 68. The on-site water system shall be public and constructed as proposed on the application plan per City standards. 69. Provide signed grant deeds, legal descriptions and plats for all public easements to the City of Petaluma for the water main system, including fire hydrants, meters and services prior to issuance of a building permit. The easements will be recorded by the City after construction of the utility is complete. 70. The water system shall be capable of delivering a continuous fire flow as designated by the fire marshal. Provide final fire flow calculations for review and approval prior to issuance of a building permit. 71. Show gate valve locations and profiles on new City maintained facilities (water and trunk. sewer). 72. All landscaping shall meet City Standards for low water use. Storm Drain System 73. The applicant shall submit detailed, construction plan level hydraulic and hydrology calculations for the on-site storm drain system for review and approval by the Sonoma County Water Agency (SCWA) and City of Petaluma. The calculations shall include the two new proposed bridges/culverts over Deer Creek. The preliminary storm water calculations submitted as part of the environmental review process concluded that storm water detention should probably be avoided because detention may slow on-site peak runoff and increase downstream peak flow in the Petaluma River. The calculations shall assess the need for on-site storm water detention, subject to the review and approval by the City of Petaluma. Should the calculations determine that on-site detention is necessary, the applicant shall install a storm water detention system designed to detain the 100-year event. The applicant's civil engineer/hydrologist should contact the City Engineer to discuss the scope of the peer review prior to preparing the final storm water calculations. The final calculations are required to be peer reviewed by the City's storm water model consultant. The City will manage the peer review process. The applicant shall be responsible for funding the peer review process including all time and materials for City staff and its consultants. 74. All storm Water systems and calculations shall include detention and treatment systems that meet the requirements of the NPDES, City of Petaluma Phase II Storm Water Regulations including Attachment 4 requirements for post construction storm water runoff, as well as City standards. 75. All on-site storm drain systems are to be privately maintained including Deer Creek. Dedicate a hydraulic easement to the City of Petaluma allowing continued use of Deer Creek to accept runoff from upstream public storm drain systems. Planning Commission Resolution No.2012-13 Page 12 Miscellaneous 76. Existing overhead distribution utilities, 12kv or less, along the street frontages and/or traversing the site shall be placed underground. 77. Dedicate the required public street right-of-way to construct the proposed street, sidewalk and landscaping improvements, etc. required to serve the project, on North McDowell Boulevard and Rainer Avenue. 78. Dedicate the required public easements for the proposed traffic signal infrastructure and loops at the project entrance on Professional Drive. 79. The existing irrevocable offer of dedication for public streets and utilities, as described in Petaluma Parcel Map 170, shall be vacated prior to issuance of any building permits. The vacation requires approval by the City Council. The applicant has submitted application number 12-ABN-048 on 07/24/2012. 80. Dedicate as public right-of-way, the portion of Parcel B to provide the City's ultimate right of way necessary for buildout of Rainier Avenue, subject to City approval, per the existing plan line for the future Rainier crosstown connector and roadway project as well as Parcel C for North McDowell Boulevard, per the City of Petaluma Ordinance 1991 N.C.S. 81. A 10-foot wide public utility easement (PUE) shall be dedicated adjacent to and along all public street right-of-ways as required by the City Engineer. 82. Record a lot line adjustment or merge the two existing properties (APN 007-380-005 & 027) prior to issuance of any building permits. 83. Utility trenching in any new street construction and/or pavement overlay shall require pavement grinding and repaving as described by City Ordinance No. 2266 NCS. 84. Maintenance of the water quality treatment system and any required storm drain detention system shall be the responsibility of the property owner(s). A financial and operation plan for maintenance, inspection, reporting, etc., shall be submitted for review and approval by the City of Petaluma, and recorded, prior to issuance of a building permit. 85. Public improvement plans shall be prepared for the construction of improvements in the public right-of-way and City utilities on private property. All improvements shall be designed in accordance with City Standards and Specifications. Joint trench plans shall also be submitted. A public improvement agreement, bonds, insurance and fees shall be required. Provide scanned record drawings prior to the release of the performance bond. The public improvements shall be complete and accepted prior to any final inspection or the issuance of any certificate of occupancy. Planning Commission Resolution No. 2012-13 Page 13 Pedestrian and Bicycle Advisory Committee 86. The number and type of bicycle racks as shown on plans reviewed by the PBAC shall be shown on final plans prior to issuance of building permit. A minimum of 150 bicycle racks shall be provided, including 80 covered and 70 uncovered. The bicycle racks shall be in generally the same locations as reviewed by the PBAC and should be kept away from trash receptacles, dispersed throughout the larger development, and include separate racks to serve individual buildings. Post and loop bike racks shall be installed as shown on plans labeled M/SA-05, and meeting City standards. Applicant is encouraged to use a variety of rack models and styles with artistically interesting designs, showing creativity and reflecting the character of the city and complementing the building designs, while meeting city specifications. Whenever possible, the applicant shall locate racks near doors and with adequate lighting. 87. Signage shall be installed at drive and street entrances along North McDowell alerting vehicle traffic to Class I users. 88. A minimum 8-foot wide Class I shared use path shall be constructed along both sides of the Deer Creek swale buffer and a loop path around the dog walk area shall be installed as an interim use of property within adopted plan line for Rainier interchange project. 89. A minimum 8-toot decomposed granite pathway shall be constructed to the rear of the Major tenant buildings, connecting with Lynch Creek Way. The pathway shall be elevated from the adjacent parking area by 6 inches. The PBAC recommends signage at drive and street entrances to the project alerting users to the existence of the Class I paths especially the route behind the Majors, to Lynch Creek Drive Class II facilities, which lead to the Lynch Creek cross town connecting path. 90. Crosswalks interior to the project shall be installed as shown on plans and including at south side of Major 1 and Lynch Creek Way, near the fitness center, across parking lots between Shops D and Grocery, and southern exit from project turning right onto McDowell. These crosswalks shall be differentiated through the use of colored or marked pavements. 91. To enhance safe pedestrian access to the project's McDowell frontage/village aspect of the project adjacent to "Shop C and Medical Building 2", clearly defined crosswalks, signage and barricades shall be installed to guide pedestrians. 92. To the greatest extent feasible, all walkways within the project shall be a minimum of 6- feet wide. 93. The three separate, designated walkways located in the parking areas in front of the Major buildings as shown on the plans shall be constructed with raised/colored pavement to provide safe convenient passage for shoppers/pedestrians in the east/west directions from Major 1 to the Medical Office building and from Major l's garden center to Shops B and Major 3 to Shops A. These walkways shall have a minimum clearance width of 6-feet (after consideration of vehicle overhang) but ideally 8-feet if it can be accommodated, between parked cars to allow movement of shoppers with carts and pedestrians and strollers. 94. The applicant shall install signs at the intersection of Rainier and McDowell alerting cyclists to use the Class I shared facility instead of riding in the street. 95. Signs indicating "employee and truck delivery passage only" shall be installed at Major Tenants 1, 2 and 4 to discourage public traffic on the west side of retail buildings. Planning Commission Resolution No. 2012-13 Page 14 96. Signs shall be installed at the rear of project alerting through truck traffic to pedestrians/bicyclists using the Class I pathway to Lynch Creek Drive. 97. Exterior lighting shall be high quality and specifically placed within the development to guide the way to and near exterior bike rack and bike locker locations, along the dog walking loop, along the Class I path to the rear of the major tenant spaces, and along the Deer Creek swale paths. 98. All exterior lighting shall provide a "soft wash" of light against the wall and shall be hooded and directed downward with no direct glare. 99. Water fountains, accessible to people and their dogs/service animals shall be installed at the dog walking loop, along the Class I path along Deer Creek, in the plaza areas between Professional Building and Medical Office, Between Shops A and B, and near Restaurant A. 100. Public benches shall be installed along Deer Creek, at the dog-walking loop, and behind Major 3 and 4. 101. Outdoor seating shall be provided with benches or through other means at Professional Building and Medical Office, Between Shops A, B and C, and near Restaurant A, and in areas expected to be used for farmer's markets or other outdoor events. Planning Commission Resolution No.2012-13 Page 15