HomeMy WebLinkAboutPlanning Commission Resolution 2012-14 08/14/2012 RESOLUTION NO. 2012-14
CITY OF PETALUMA PLANNING COMMISSION
APPROVING SITE.PLAN AND ARCHITECTURAL REVIEW FOR THE
BARD RESIDENCE, LOCATED AT 520 FIRST STREET
APN 008-192-017
Project File No: 12-SPC-0322
WHEREAS, Wayne Miller, on behalf of the property owner, submitted an application for
Site Plan and Architectural Review for the purpose of constructing a single-family house and
accessory structure located at 520 First Street and within the boundaries of the Central Petaluma
Specific Plan (the "project"); and,
WHEREAS, the project has been reviewed in compliance with CEQA guidelines and has
been determined to be categorically exempt. The project is consistent with the impacts
evaluated in the Central Petaluma Specific Plan Environmental Impact Report certified by the
City Council on June 3, 2003. The project is categorically exempt from CEQA pursuant to
Section 15303(a) of the CEQA Guidelines because it consists of one new single-family
residence. Section 15303(a) exempts up to three single-family homes in an urbanized area; and,
WHEREAS, on August 16, 2012, a Notice of Public Hearing was published in the Argus-
Courier and mailed to all residents and property owners within 500 feet of the project; and,
WHEREAS, the Planning Commission held a properly noticed public hearing on August 28,
2012 in accordance with the City of Petaluma's Implementing Zoning Ordinance, Section 24.010F.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission hereby approves the Site
Plan and Architecture Review for the project, authorizes construction of site improvements for
the project contained in said plans based on the findings made below and subject to the
conditions of approval attached as EXHIBIT A hereto and incorporated herein by reference:
1. The proposed project, as conditioned, will not constitute a nuisance or be detrimental to
the public welfare of the community because it will be operated in conformance with
performance standards specified in the Uniform Building Code, the Petaluma
Implementing Zoning Ordinance and the Central Petaluma Specific Plan, and the City of
Petaluma General Plan 2025.
2. The project is consistent with the General Plan 2025 Mixed Use land use designation of
the subject property. A.single family residential use ai this site is appropriate for several
reasons: 1) The size of the lot (3,231 square feet) is not conducive to more than one use
on the site or a more intense use of the site; 2) The proposed single family use in concert
with surrounding uses including Luma restaurant and a light industrial use (Kresky Signs)
create a mixed use immediate neighborhood, likewise the greater area has a broad mix
of uses; and 3) the residential use in its urban, transitional style will provide a buffer to the
historic workforce bungalow residential block along Second Street.
In particular, the project is consistent with the following goals, policies, and programs of
the 2025 General Plan:
1-P-1 Promote a range of land uses at densities and intensities to serve the
community needs within the Urban Growth Boundary (UGB).
Planning Commission Resolution No. 2012-14 Page 1
1-P-2 Use land efficiently by promoting infill development, at equal or higher density
and intensity than surrounding uses.
4-P-6 Improve air quality through required planting of trees along streets.
11-P-1 Promote residential development within the Urban Growth Boundary.
11-P-1 Encourage the development of housing on underutilized land.
11-P-3 Encourage a mix of housing design types.
11-P-20 Promote the use of energy conservation features in the design of residential
development.
The project proposes a unique residence appropriate to its surrounding, includes the
planting of a street tree, and includes energy conservation features including solar
panels in Phase 2.
Compliance with policy 4-P-15D regarding reducing emissions in residential units is
achieved by way of condition 7 (requiring high efficiency heating and low NOx water
heaters). Compliance with policy 4-P-16 regarding reducing combustion emissions
during the construction phase is achieved via condition 8.
3. The proposed project is consistent with the development standards of the CPSP's T-5
zoning designation. A maximum of 80% lot coverage is allowed; Phases 1 and 2 together
would,total 57%. A lot layout with a rear yard is one of the permitted arrangements; the
proposal creates a rear yard layout. The house is required to be setback between 0 and
10 feet from the front and side property lines and at least 20'feet to the rear property line;
the house is proposed with no front yard setback, a 5 foot setback to each building side,
and a 48 foot setback from the rear property line. Proposed entry stairs and rear decks
with stairs are proposed closer, but are still consistent with requirements, being 7 inches to
the southern side property line (entry stairs) and 34.5 feet to the rear property line (decks
and stairs). The proposed utility shed and covered patio are required to be setback
between 0 and 10 feet to the side property lines and 5 feet to the rear property line; the
shed and patio are proposed with a setback at least 3 feet to each side property lines
and 5 feet to the rear. Permitted building frontage types include arcade, gallery,
forecourt, stoop, and "shop front and awning"; the proposed project is a hybrid of
approved types arranged to fit the use and neighborhood, the massing and front
property line orientation is akin to the gallery or "shopfront and awning" typology, while
the function of the ground floor will be more like the stoop typology where access is from
an exterior stair and landing. A 65% building frontage is required; the proposed house
covers 69% of the lot frontage. The main building is required to be 2 to 4 stories and
accessory buildings may not exceed 2 stories; the proposal is for a 3-story house and a 1-
story shed. No parking is currently required; one parking space is proposed.
4. Pursuant to CPSP Parking section 6.10.050, the literal application of the third layer parking
requirement shall be modified, to allow the proposed parking arrangement. The
proposed parking configuration, to allow a car to be parked immediately behind the
garage door, is the most appropriate option because the proposed design:
a. Best relates to the manner in which a single-family house with a one-car garage
operates,
b. Effectively provides a parking space that is safe, land efficient, and convenient;
and,
c. Provides a parking space that is more aesthetically attractive than requiring the
garage door be set back the full 20 feet which would also result in the loss of an 80
foot tall redwood tree.
Planning Commission Resolution No.2012-14 Page 2
5. The proposed project is consistent with the CPSP Architectural Guidelines for the River
Warehouse district, in that the architecture and materials for the proposed house and
accessory building are draw directly from adjacent and riverfront warehouse
architecture and materials, being simple and rectangular, and utilizing industrial
materials and utilitarian detailing in a manner compatible with the proposed residential
function. The house is three stories and sits at the front property line, with just the sort of
side yard setback described by the guidelines.
4. The proposed project, as conditioned, is consistent with the standards for site plan and
architectural review stated in Section 24-010 of the Zoning Ordinance in the following
ways:
a. The proposed house and accessory building will incorporate exterior materials that
are of quality materials and in harmony and compatible to the surrounding
buildings. Quality materials include two types of metal siding to create texture,
metal "awning" style windows, steel tube railing, and an open, recycled-wood slat
screen detail. The materials of the house and shed are designed to reference the
abutting structures on First Street and to relate closely to the simple building forms
and materials of the original warehouse structures along the Petaluma River side of
First Street. The materials of both the option A and B stairs are also metal and
appropriate to the context.
b. The architectural style is appropriate for the project and compatible with the overall
character of the neighborhood. The style of the house and shed are designed to
reference the abutting structures on First Street, though being simpler in form than
the residence to the south and smaller in scale than the mixed-use building to the
north, and to relate closely to the simple building forms and materials of the original
warehouse structures along the Petaluma River side of First Street. The proposed
house and accessory building architecture and materials draw directly from
adjacent and riverfront warehouse architecture and materials, being simple and
rectangular, and utilizing industrial materials and utilitarian detailing in a manner
compatible with the proposed residential function. Both the option A and B stair
design is appropriate for the project and compatible with the overall character of
the neighborhood.
c. The siting of the proposed house and accessory building is consistent with the siting
of other structures in the immediate neighborhood and compliant with the setbacks
specified by the CPSP's T-5 requirements (see finding 4 above). The Bard house and
the Tatum building to the immediate north have similar street orientations, sitting
near the First Street property line and 4 - 5 feet from their respective side property
lines, and consisting of three stories. The proposed house and accessory building
have a rear yard setback typical of a single-family residential use, which is
appropriate because of the historic bungalow residences to the rear.
d. The bulk, height, and color of the proposed house and accessory building is
appropriate for the site and for the surrounding area. The bulk is similar to, though
taller than the house to the immediate south and is smaller than the mixed-use
Tatum building to the north, which is appropriate because the Tatum building sits on
a wider and larger lot. The house is simple and rectangular as directed by the CPSP
Architectural Guidelines; also as directed by the Guidelines the house is 2 to 3 stories
and constructed to the street but with sufficient side setbacks so that buildings
appear as detached structures and side yards and entrances are created. Colors
will match the existing neighborhood pallet, being primarily metal, with some
weathered wooden components.
Planning Commission Resolution No.2012-14 Page 3
e. The proposed landscaping is in keeping with the character and design of the site.
The project includes the planting of a street tree and, pursuant to condition 4, a
planter box abutting the residence's front wall and planted with site-appropriate
vines or columnar shrubs. These are improvements consistent with the
neighborhood and in keeping with urban, residential nature of the project.
f. Ingress, egress, and off-street parking, are adequate for the proposed residence
and conform to City standards, as described in the second paragraph of finding 4
above. The project provides one parking spaces for the single-family residence in a
typical garage setting with typical ingress and egress. A 12 foot wide sidewalk will
be constructed in front of the parcel.
ADOPTED this 28th day of August, 2012, by the following vote:
Commissioner. Aye No Absent, Abstain
Abercrombie X
Elias X
Herries X
Johnson X
Kearney X
Chair Pierre X
Vice Chair Wolpert X
Jennifer',ierre, 9I1
ATTEST: APPROVED AS T* FORM:
it A
He er Hines, Co 'mission Secretary Eric Danly, Ci Attorney
Planning Commission Resolution No.2012-14 Page 4
EXHIBIT A
SPAR CONDITIONS OF APPROVAL
BARD RESIDENCE
520 FIRST STREET
APN 008-192-017
Project File No: 12-SPC-0322
Planning Division:
This Site Plan & Architectural Review approval authorizes construction of a three-story
residence and an accessory structure as shown on plans dated stamped August 7, 2012,
within the Central Petaluma Specific Plan (CPSP) at 520 First Street, APN 008-192-017.
2. Plans submitted for building permit review shall be in substantial conformance with the
Site Plan & Architectural Review request and those plans on file in the Planning Division
date stamped August 7, 2012, except as modified by the following conditions.
3. Prior to the issuance of any development permit, the applicant shall revise the site plan
or other first sheet of the office and job site copies of the Building Permit plans to list these
Conditions of Approval as notes.
4. Plans submitted for building permit shall show an approximately 5 foot wide by 2 foot
deep, irrigated, planter box abutting the resident's front wall at the mechanical closet
and planted with site-appropriate vines or columnar shrubs, subject to staff review and
approval.
5. Prior to building permit(s) issuance, the Security Deposit required by Zoning Ordinance
17.060F, and as calculated pursuant to 17.060C, shall be posted to cover the value of the
44-inches at DBH, 80-toot tall Coast Redwood during the construction periods.
6. Prior to building permit(s) issuance, submit photographic evidence that the area
beneath the redwood tree foliage has been fencing off (in a manner sufficient to stay in
place during the construction period) and protected with a 4-inch layer of woody mulch
beneath the dripline, as specified by the arborist report dated July 17, 2012. The
redwood shall continue to be protected during construction periods. Should trenching
prove necessary in Phase 1 or 2, excavation under the major roots within the dripline shall
be done by hand or with an airspade, to avoid root damage.
7. Prior to building permit approval, the plans shall note the installation of high efficiency
heating equipment (90% or higher heating/furnaces) and low NOx water heaters (40 or
less) in compliance with General Plan policy 4-P-15D (reducing emissions in residential
units).
8. Prior to building or grading permit approval, all plans shall note the following and all
construction contracts shall include the same requirements (or measures shown to be
equally effective, as approved by the Planning Division), in compliance with General
Plan policy 4-P-16:
• Maintain construction equipment engines in good condition and in proper tune per
manufacturer's specification for the duration of construction;
• Minimize idling time of construction related equipment, including heavy-duty
equipment, motor vehicles, and portable equipment;
Planning Commission Resolution No. 2012-14 Page 5
• Use alternative fuel construction equipment (i.e., compressed natural gas, liquid
petroleum gas, and unleaded gasoline);
• Use add-on control devices such as diesel oxidation catalysts or particulate filters;
• Use diesel equipment that meets the ARB's 2000 or newer certification standard for
off-road heavy-duty diesel engines;
• Phase construction of the project; and
• Limit the hours of operation of heavy duty equipment.
9. Prior to final inspection, the planter box abutting the mechanical closet shall be created,
irrigated, and planted.
10. Phase 2 construction (sheet A3.3) is also approved by this SPAR for a period not to
exceed 5 years from the date of the house final (certificate of occupancy). Either stair
option 1 or 2 is hereby approved.
11. All construction activities shall be limited to Monday through Friday 7:30 a.m. to 5:30 p.m.
and Saturdays from 9:00 a.m. to 5:00 p.m, this includes construction related deliveries and
equipment maintenance. Construction shall be prohibited on Sundays and all holidays
recognized by the City of Petaluma. This condition is more restrictive than the construction
hours stated in Implementing Zoning Ordinance, Chapter 21 because of the project's
proximity to residential uses and in conformance with the Quinn Tentative Map (06-TPM-
0541) condition 6.
12. Construction activities shall comply with performance standards specified Implementing
Zoning Ordinance Chapter 21 and the Petaluma Municipal Code Sections (noise, dust,
odor, etc.).
13. The project shall be subject to all applicable development impact and other City fees.
14. The applicant shall defend, indemnify and hold harmless the City and its officials,
boards, commissions, agents, officers and employees ("Indemnitees") from any claim,
action or proceeding against Indemnitees to attack, set aside, void or annul any of the
approvals of the project. The applicant's duty to defend, indemnify and hold harmless in
accordance with this condition shall apply to any and all claims, actions or proceedings
brought concerning the project, not just such claims, actions or proceedings brought
within the time period provided for in applicable State and/or local statutes. The City
shall promptly notify the applicant/developers of any such claim, action or proceeding.
The City shall cooperate fully in the defense. Nothing contained in this condition shall
prohibit the City from participating in the defense of any claim, action, or proceeding,
and if the City chooses to do so, applicant shall reimburse City for attorneys' fees and
costs incurred by the City.
Department of Public Works (Engineering Division):
15. Prior to final inspection, install all frontage improvements shown on the approved
improvement plans dated October 17, 2008, entitled "Public Improvement Plans for
Parcel Map No. 373, Lands of Quinn and Geraci." Copies of these plans can be
purchased in my office. An encroachment permit is required for all work within the public
right of way.
16. With the building permit application for the proposed site work, provide a grading,
drainage, and utility plan, prepared by a licensed Civil Engineer in the State of California
17. The proposed garage (non-habitable space) is located within the 100-year floodplain
per the 2008 flood insurance rate maps. The garage shall be designed and built in
Planning Commission Resolution No. 2012-14 Page 6
accordance with City floodplain regulations, specifically Section 6.070 (G.3) Elevation
and Floodproofing,which refers to garage openings to equalize hydrostatic flood forces.
18. An encroachment permit is required for all work within the public right of way, including
the planter box, street tree, and sidewalk, and to allow the balcony encroachment.
Fire Marshal:
19. Fire sprinkler systems designed and installed in accordance with NFPA 13-D are required
in residential structures; bathrooms over 55 square feet, closets over 24 square feet or 3
feet deep, and other attached structures. These systems shall be calculated for two-
head activation for the most remote two heads. All systems require 3 sets of plans to be
submitted fo the Fire Marshal's Office for review and approval.
Planning Commission Resolution No.2012-14 Page 7